RAPID/Hydropower/Kentucky/Pre-Existing Land Use

From Open Energy Information

< RAPID‎ | Hydropower‎ | Kentucky

RAPIDRegulatory and Permitting Information Desktop Toolkit
My Projects

Kentucky Hydropower Pre-Existing Land Use Assessment(13-KY)

In Kentucky, a hydropower developer should consider the project’s location to determine the land use designation and to comply with potential federal and state development restrictions. Currently, the RAPID Toolkit does not have state specific content regarding pre-existing land use for hydropower development in Kentucky.

More Information

Determine Which State and Federal Permits Apply

Use this overview flowchart and following steps to learn which federal and state permits apply to your projects.


Narrow your results (by hydropower project type)

all