U
162

Property:Incentive/ApplicUtils

From Open Energy Information

Property Name Incentive/ApplicUtils
Property Type String
Description Applicable Utilities.

Pages using the property "Incentive/ApplicUtils"

Showing 25 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

A
APS - Net Metering (Arizona) +APS  +
American Samoa - Net Metering (American Samoa) +ASPA  +
Ames Electric Department - Net Metering (Iowa) +10 kW  +
Ashland Electric - Net Metering (Oregon) +Ashland Electric  +
Austin Energy - Net Metering (Texas) +Austin Energy  +
Avista Utilities - Interconnection Guidelines (Idaho) +Yes  +
Avista Utilities - Net Metering (Idaho) +Avista Utilities  +
B
Bowling Green Municipal Utilities - Net Metering (Ohio) +25 kW  +
C
CHELCO - Net Metering (Florida) +10 kW  +
City of Brenham - Net Metering (Texas) +City of Brenham  +
City of Danville - Net Metering (Virginia) +Danville Utilities  +
City of St. George - Net Metering (Utah) +City of St. George  +
City of Tallahassee Utilities - Net Metering (Florida) +100 kW  +
Colorado Electric Cooperatives - Interconnection Standards (Colorado) +Varies by utility  +
Colorado Springs Utilities - Net Metering (Colorado) +Residential systems up to 10 kW Businesses up to 25 kW  +
ComEd - Interconnection Guidelines (Illinois) +Yes  +
ComEd - Wind & Photovoltaic Generation Program (Illinois) +40 kW  +
D
Delta-Montrose Electric Association - Net Metering (Colorado) +The lesser of: the nameplate rating of the transformer serving the member’s meter, or the maximum measured demand of the customer in the previous 12 months, or 25 kW.  +
Duke Energy - Net Metering (South Carolina) +Duke Energy  +
E
EPUD - Net Metering (Oregon) +25 kW  +
EWEB - PV Partners (Oregon) +25 kW  +
Empire Electric Association - Net Metering (Colorado) +10 kW  +
F
Farmington Electric Utility System - Net Metering (New Mexico) +Farmington Electric  +
Florida Keys Electric Cooperative - Net Metering (Florida) +10 kW  +
Fort Collins Utilities - Net Metering (Colorado) +10 kW (manufacturer peak output rating); larger customer-owned parallel generation systems may also be considered, but other provisions apply  +