Browse wiki

From Open Energy Information

City of Danville - Net Metering (Virginia)
DSIRE/DtAdd 2011-02-03  +
DSIRE/Id VA23R  +
DSIRE/LstUpdt June 13, 2012  +
EZFeed/Relevant Yes  +
Incentive/Active true  +
Incentive/AddlPlace Danville +
Incentive/AggrCapLimit Less than 1% of the utility's most recent peak load for all interconnected renewable energy generators  +
Incentive/ApplDsc Commercial  + , Residential  +
Incentive/ApplicUtils Danville Utilities  +
Incentive/Auth2Code Danville Utilities Electric Rate Schedule and Riders  +
Incentive/Auth2DtEff 2011-01-01  +
Incentive/Auth2Link http://www.danville-va.gov/DocumentView.aspx?DID=3664  +
Incentive/AuthCode Danville Ordinance No. 2010-12.04  +
Incentive/AuthDtEnact 2010-11-22  +
Incentive/DsireLstSubModSummaryUpdt July 25, 2011  +
Incentive/DsireSyncDate 2011-04-30 20:16:13  +
Incentive/EnergyCat Renewable Energy Incentive Programs  +
Incentive/ImplSector Local  +
Incentive/MtrAggr None addressed  +
Incentive/Name City of Danville - Net Metering  +
Incentive/NetExcGen A customer that would otherwise be a net metering customer shall receive no compensation for excess generation unless a power purchase agreement has been entered into with the utility.  +
Incentive/RECOwn Customer owns REC's. The utility is not obligated to purchase net metering RECs.  +
Incentive/Summary For a renewable fuel generator with a capa …
For a renewable fuel generator with a capacity of 25 kilowatts (kW) or less, a notification form shall be submitted at least 30 days prior to the date the customer intends to interconnect their renewable fuel generator to the Utility's facilities. Renewable fuel generators with capacity over 25 kW are required to submit forms no later than 60 days prior to planned interconnection. The Utility will review and determine whether the requirements for Interconnection have been met. More information on this process may be found in the Danville Utility Commission's [http://www.danville-va.gov/DocumentView.aspx?DID=3664 Electric Rate Schedule and Riders]. A customer may begin operation of their renewable energy generator once the conditions of interconnection have been met. These include: * Notification to utility of intent to interconnect * Installation of a lockable, utility accessible, load breaking manual disconnect switch * Certification of manual disconnect switch by a licensed electrician * Compliance with IEEE Standard 1547, Interconnecting Distributed Resources with Electric Power Systems, certified by vendor * Utility inspection of static and nonstatic inverter-connected renewable fuel generators * Requirements specific to systems generating over 25kW are held to further requirements available in the Electric Rate Schedule and Riders Interconnection of a net metering system will not be allowed if installation will cause the total generated AC current capacity of all interconnected renewable energy generators within the utility service to exceed 1.0% of the most recent peak load. Renewable fuel generators with a rated capacity less than 10kW shall maintain homeowners, commercial, or other insurance providing coverage in the amount of at least $100,000 for the liability of the insured against loss arising out of the use of a renewable fuel generator, and for a renewable fuel generator with a rated capacity exceeding 10kW such coverage shall be in the amount of at least $300,000.
all be in the amount of at least $300,000.  +
Incentive/SysCapLimit 10 kW residential and 500 kW non residential  +
Incentive/TechDsc Biomass + , CHP/Cogeneration + , Geothermal Electric + , Hydroelectric energy + , Landfill Gas + , Municipal Solid Waste + , Photovoltaics + , Solar Thermal Electric + , Tidal Energy + , Wave Energy +
Incentive/Type Net Metering +
OpenEI/PageDescription City of Danville - Net Metering: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Virginia  + , Net Metering  +
Place Virginia: Energy Resources +
Website http://www.danville-va.gov/  +
Categories Rules Regulations Policies Incentive Programs , Incentive with Authorities
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
14:50:51, 12 February 2015  +
hide properties that link here 
Danville - Net Metering (Virginia) + redirect page
 
Enter the name of the page to start browsing from.