City of St. George - Net Metering (Utah)

From Open Energy Information


Last modified on February 12, 2015.

Rules Regulations Policies Program

Place Utah
Name City of St. George - Net Metering
Incentive Type Net Metering
Applicable Sector Commercial, General Public/Consumer, Residential
Eligible Technologies Photovoltaics
Active Incentive Yes
Implementing Sector Utility
Energy Category Renewable Energy Incentive Programs
Aggregate Capacity Limit No limit specified
Applicable Utilities City of St. George









Meter Aggregation Not addressed
Net Excess Generation Carried to customer's next bill at retail rate. After 12-month cycle, excess credited to next bill at avoided-cost rate.


REC Ownership Customer owns RECs (unless utility subsidizes system)





System Capacity Limit 250 kW; larger systems may be allowed on a case-by-case basis







Website http://www.sgcity.org/energyservices
Date added to DSIRE 2007-02-28
Last DSIRE Review 2012-01-23
Last Substantive Modification
to Summary by DSIRE
2012-01-23


References DSIRE[1]


Summary

The St. George City Council adopted a net-metering program for area utilities, including interconnection procedures, in October 2005.* The interconnection procedures include different requirements, based on system size, for systems up to 10 megawatts (MW).

Net metering is available to residential and commercial customers that generate electricity using photovoltaic (PV) systems. The net metering agreements currently available on the utility's web site only pertain to PV, but wind and other renewable technologies may be eligible for net metering. If a customer wishes to participate in net metering with a wind system or other renewable technology, they should contact the utility. The utility may develop additional net metering agreements as needed. Similarly, the net metering agreements currently available on the utility's web site only address systems up to 250 kW. Customers interested in connecting a larger system should contact the utility. The utility may develop a separate net metering agreement as needed.

The utility will provide a single, bidirectional meter. Customers are credited for excess generation at the same rate as charged, unless the customer has excess generation at the end of a continuous 12 month period. In that case the customer will receive a credit at the municipal utility's avoided-cost rate.

The City of St. George has also developed interconnection rules for net metered systems. Inverter-based systems up to 10kW in capacity can qualify for Level 1 interconnection, which features a streamlined review process. Systems greater than 10 kW and up to 2 MW can qualify for Level 2 interconnection. Systems between 2 MW and 10 MW can qualify for Level 3 interconnection.


* Utah enacted legislation in 2002 requiring all investor-owned electric utilities and cooperative utilities to offer net metering to their customers. However, the law does not apply to municipal utilities. The City of St. George offers net metering voluntarily.


Incentive Contact

Contact Name René Fleming
Department City of St. George
Address City Hall
Address 2 175 East 200 North
Place St. George, Utah
Zip/Postal Code 84770
Phone (435) 627-4848


Email rene.fleming@sgcity.org
Website http://www.sgcity.org


Authorities (Please contact the if there are any file problems.)

Authority 1: Policy No. 10.95
Date Effective 10/2005

















  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]

References

  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)"