DSIRE/DtAdd 2006-04-18  +
DSIRE/Id CO30R  +
DSIRE/LstUpdt April 18, 2006  +
Incentive/Active false  +
Incentive/AggrCapLimit Monthly carryover  +
Incentive/ApplDsc Commercial  + , Residential  +
Incentive/ApplicUtils Residential systems up to 10 kW Businesses up to 25 kW  +
Incentive/ContAddr P.O. Box 1103  +
Incentive/ContDept Colorado Springs Utilities  +
Incentive/ContEmail sebaker@csu.org  +
Incentive/ContName Simon Eilif Baker  +
Incentive/ContPhone (719) 668-8231  +
Incentive/ContPlace Colorado Springs, Colorado  +
Incentive/ContWebsite http://www.csu.org  +
Incentive/ContZip 80947  +
Incentive/DsireSyncDate 2011-04-30 14:10:07  +
Incentive/EnergyCat Renewable Energy Incentive Programs  +
Incentive/ImplSector Utility  +
Incentive/Name Colorado Springs Utilities - Net Metering  +
Incentive/RECOwn Yes  +
Incentive/Summary A municipal utility large enough to fall u …
A municipal utility large enough to fall under Amendment 37 rules, Colorado Springs Utilities (CSU) launched their net-metering program in 2004 for residential systems up to 10 kW. Business customers up to 25 kW are now also eligible. Though not a "true" net metering program - customers are required to have two separate meters - producers are credited at retail rates, and the second meter is only used to measure the RECs produced (which belong to CSU and count towards their annual RPS goals). Customers must provide a meter socket, and CSU provides the second meter. CSU does not charge stand-by fees or require additional insurance. Any net excess generation (NEG) is credited to the customer's next monthly bill. Any balance left at the end of the year is credited to the utility. Interconnection agreement exists. Net-metered systems must be "operational" for five years with no gap for more than three months to qualify. Installations must have five-year warranty unless systems are self-installed. CSU has three operational net-metered systems as of 2/06 (two customers, one school). More systems are expected to come on-line soon due to CSU's $4/W solar rebate program. CSU set a goal of 60 kW of net-metered generation.
a goal of 60 kW of net-metered generation.  +
Incentive/SysCapLimit "Goal" of 60 kW - no limit  +
Incentive/TechDsc Photovoltaics + , Landfill Gas + , Wind + , Biomass + , Geothermal Electric + , Anaerobic Digestion + , Small Hydroelectric + , Fuel Cells using Renewable Fuels +
Incentive/Type Net Metering +
OpenEI/PageDescription Colorado Springs Utilities - Net Metering: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Colorado  + , Net Metering  +
Place Colorado: Energy Resources +
Categories Rules Regulations Policies Incentive Programs , Incentive with Contacts
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
02:03:21, 24 May 2011  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.