Browse wiki

From Open Energy Information

Avista Utilities - Interconnection Guidelines (Idaho)
DSIRE/DtAdd 2003-06-18  +
DSIRE/Id ID05R  +
DSIRE/LstUpdt March 21, 2007  +
Incentive/Active false  +
Incentive/ApplDsc Commercial  + , Residential  + , Agricultural  +
Incentive/ApplicUtils Yes  +
Incentive/ContAddr 472 W. Washington  +
Incentive/ContAddr2 PO Box 83720  +
Incentive/ContDept Idaho Public Utilities Commission  +
Incentive/ContEmail rick.sterling@puc.idaho.gov  +
Incentive/ContName Rick Sterling  +
Incentive/ContPhone (208) 334-0351  +
Incentive/ContPlace Boise, Idaho  +
Incentive/ContWebsite http://www.puc.state.id.us/  +
Incentive/ContZip 83720-0074  +
Incentive/DsireSyncDate 2011-04-30 15:13:42  +
Incentive/EnergyCat Renewable Energy Incentive Programs  +
Incentive/ExtDiscSwtch Yes  +
Incentive/ImplSector Utility  +
Incentive/InsurReqs Not specified  +
Incentive/Name Avista Utilities - Interconnection Guidelines  +
Incentive/NetMtrReqd Yes (utility guidelines)  +
Incentive/Summary Idaho has not established uniform intercon …
Idaho has not established uniform interconnection rules and procedures either for net-metered systems or for larger distributed-generation (DG) systems that are not net-metered. However, through their respective tariffs, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has established guidelines for the interconnection of small renewable-energy systems and larger DG. Avista Utilities' interconnection guidelines for net metering, included in Schedule 63 and Schedule 70, do not specify technical requirements in detail. For net-metered systems, an external disconnect switch is required, and all equipment must meet applicable safety, power quality and interconnection requirements established by the National Electrical Code (NEC), National Electrical Safety Code (NESC), the Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL). Net metering is generally available to customers who generate electricity using a renewable-energy system up to 25 kilowatts (kW) in capacity. Avista Utilities also has also developed interconnection guidelines for DG systems up to 300 kilowatts (kW) in capacity. There is a $100 application fee for proposed systems. An external disconnect switch is required, and a separate transformer may be required. No additional insurance is necessary for systems powered by solar, wind, hydropower or fuel cells, but additional insurance and indemnification may be required for other systems. Systems must comply with all applicable codes and standards for safe and reliable operation, including the NEC, NESC, IEEE, ASNI and UL. Interconnection to network distribution systems may be permitted if the customer provides evidence that a proposed system will not result in reverse current flow. The interconnection of Qualifying Facilities (QFs)* up to 10 average megawatts in capacity is addressed briefly by the utility's Schedule 62. In an order issue January 24, 2007, the Idaho Public Utilities Commission ruled that the National Association of Regulatory Utility Commissioners (NARUC) interconnection model should be used as a "guideline" for interconnection agreements. ''* This term, defined in the Public Utility Regulatory Policies Act of 1978 (PURPA), generally includes renewable-energy systems and combined-heat-and-power (CHP) systems.''
d combined-heat-and-power (CHP) systems.''  +
Incentive/SysCapLimit 25 kW for net-metered systems; 10 average MW for qualifying facilities that are not net-metered  +
Incentive/TechDsc Solar Thermal Electric + , Photovoltaics + , Wind + , Biomass + , Hydroelectric energy + , Fuel Cells + , CHP/Cogeneration + , Other Distributed Generation Technologies +
Incentive/Type Interconnection +
OpenEI/PageDescription Avista Utilities - Interconnection Guidelines: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Idaho  + , Interconnection  +
Place Idaho: Energy Resources +
Website http://www.avistautilities.com/products/renewable_generation.asp  +
Categories Rules Regulations Policies Incentive Programs , Incentive with Contacts
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
01:57:59, 24 May 2011  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.