RAPID/Geothermal/Oregon/Environment

From Open Energy Information

< RAPID‎ | Geothermal‎ | Oregon

RAPIDRegulatory and Permitting Information Desktop Toolkit
My Projects

Oregon Geothermal Environmental Review(9-OR)

Oregon does not have a state environmental review process. However, developers must comply with cultural resource, biological resource, water quality, air quality, and hazardous waste and materials rules where applicable.

More Information

Determine Which State and Federal Permits Apply

Use this overview flowchart and following steps to learn which federal and state permits apply to your projects.


Permitting at a Glance

Oregon Federal

Environmental Review: None National Environmental Policy Act
Type of Environmental Review (Leasing Stage): None Typically an Environmental Assessment (EA) is conducted for individual leases. An Environmental Impact Statement (EIS) may be required for programmatic environmental reviews or when reviewing multiple lease parcels in a single review.
Type of Environmental Review (Non-Invasive Exploration): None A categorical exclusion is available for all activities covered under a Notice of Intent to Conduct Geophysical Exploration (NOI), subject to extraordinary circumstance review. Where the activity results in an extraordinary circumstance, an EA or EIS is required.
Type of Environmental Review (Invasive Exploration): None Temperature Gradient Holes are permitted under a categorical exclusion and subject to the same conditions as non-invasive exploration as discussed above. Any other exploration drilling activity to confirm the existence of a geothermal resource will likely require an EA.
Type of Environmental Review (Drilling): None Production drilling activities will likely require an EA, but depending on the nature of the specific project, could require an EIS.
Type of Environmental Review (Power Plant Siting): None Most Plans of Utilization (POU)s require an EA or EIS.