Tasmania Turbine Demo Project
The turbine has been deployed in the Tamar estuary in Launceston, where the researchers at the AMC will conduct field experiments with a 2.4 metre-wide prototype to investigate and optimize the device’s performance. The turbine is secured beneath a floating platform and connected to a mooring on the east side of the estuary. Having undertaken tow tank testing with AMC, MAKO Turbines will be conducting research into how full-scale turbines operate in a real-world environment, according to AMC. The testing will include the influence of turbulence and biofouling which may impede performance and affect the longevity of the device.
- Planned: Project has identified a deployment location and is preparing for deployment
- Operational: Project is deployed in the water and is active
- Completed: Project was previously deployed in the water
- Decommissioned: Installation has been fully removed in accordance with regulations
- Canceled: Project was canceled before being deployed in the water
- Tidal
- Open Ocean: Main body of ocean, not enclosed or partially enclosed by land
- Coastal: Open water near the coast, spanning between land and shelf boundary
- Enclosed Bay: water that is partially surrounded by land, with a mouth open to larger water
- Constricted Channel: A channel where water flows quickly due to narrowing by the land
- River: Water flowing from land towards a larger body of water
This Project has the following MRE Devices