PRIMRE/Databases/Projects Database/Projects/SMART Village Hybrid Electrification in Marisol Peru
< PRIMRE | Databases | Projects Database | Projects
SMART Village Hybrid Electrification in Marisol Peru
A deployment of Smart Hydropower's Smart Hybrid System (river turbine + photovoltaic + backup generator). The system provides power to around 60 homes which before had access to power less than two hours a day via diesel generator.
- Planned: Project has identified a deployment location and is preparing for deployment
- Operational: Project is deployed in the water and is active
- Completed: Project was previously deployed in the water
- Decommissioned: Installation has been fully removed in accordance with regulations
- Canceled: Project was canceled before being deployed in the water
- Riverine
- Open Ocean: Main body of ocean, not enclosed or partially enclosed by land
- Coastal: Open water near the coast, spanning between land and shelf boundary
- Enclosed Bay: water that is partially surrounded by land, with a mouth open to larger water
- Constricted Channel: A channel where water flows quickly due to narrowing by the land
- River: Water flowing from land towards a larger body of water
This Project has the following MRE Devices
Filters:
Citation Formats
“SMART Village Hybrid Electrification in Marisol Peru.” Marine Energy Projects Database: Projects, PRIMRE, United States Department of Energy, https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/SMART_Village_Hybrid_Electrification_in_Marisol_Peru. Accessed <day> <monthRoman> <year>.
Marine Energy Projects Database: Projects. <year>. "SMART Village Hybrid Electrification in Marisol Peru." Accessed <monthRoman> <day>, <year>. https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/SMART_Village_Hybrid_Electrification_in_Marisol_Peru.