The Ramsey Sound Regeneration Project is a partner in the Interreg TIGER Project, a €48m ERDF fund to increase tidal energy deployment. The overarching aim of the regeneration project is to re-power the Ramsey Sound site (Pembrokeshire, UK) and install up to 1 MW of new turbine capacity. Cambrian Offshore SW Ltd was formed to gain the assets of Tidal Energy Ltd (TEL) and the Ramsey Sound site and upgrade these to provide an operational tidal turbine and tidal energy site. Ramsey Sound is a key tidal deployment site, having consent, grid connection and ROC accreditation. The site has maximum flows 3.4 m/s and a combined power estimate of 74.9 GWh/yr. Cambrian acquired pre-existing infrastructure at Ramsey Sound to accelerate the development cycle (>£10m already invested over 4 years) and fulfil the potential of the historic investment. The vision is to deliver an operational tidal site at Ramsey Sound and build capacity for Cambrian Offshore SW Ltd.
In 2021, the TEL DeltaStream was recovered and a forensic investigation was undertaken. The project will refurbish the existing assets and redeploy the device with a new horizontal axis turbine. Ongoing discussions are being help with commercial suppliers to procure the new turbine.

cambrian-offshore.com

Project Manager
Additional Information
Project Status Is the project actively being planned or is deployed in the water (active)? Or was the project canceled or completed (inactive)?
Active
Project Life Cycle Project Progress through life cycle:<ul> <li>Planned: Project has identified a deployment location and is preparing for deployment</li> <li>Operational: Project is deployed in the water and is active</li> <li>Completed: Project was previously deployed in the water</li> <li>Decommissioned: Installation has been fully removed in accordance with regulations</li> <li>Canceled: Project was canceled before being deployed in the water</li></ul>
Planned
Max Rated Power Capacity The maximum amount of electricity that can be produced by project, based on available resources and device nameplate capacity.
1 MW
Project Start Year
2021
Energy Resource
  • Tidal
Project Scale
Full-scale
Grid Connectivity
Grid Connected
Waterbody
Ramsey Sound, Pembrokeshire, Wales, UK
Site Characteristics Geographic characterization for the project location:<ul> <li>Open Ocean: Main body of ocean, not enclosed or partially enclosed by land</li> <li>Coastal: Open water near the coast, spanning between land and shelf boundary</li> <li>Enclosed Bay: water that is partially surrounded by land, with a mouth open to larger water</li> <li>Constricted Channel: A channel where water flows quickly due to narrowing by the land</li> <li>River: Water flowing from land towards a larger body of water</li></ul>
Constricted Channel
Country
United Kingdom
Last Modified
9 June 2025


Citation Formats

“Ramsey Sound Regeneration Tidal Project.” Marine Energy Projects Database: Projects, PRIMRE, United States Department of Energy, https:https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Ramsey_Sound_Regeneration_Tidal_Project. Accessed <day> <monthRoman> <year>.
Marine Energy Projects Database: Projects. <year>. "Ramsey Sound Regeneration Tidal Project." Accessed <monthRoman> <day>, <year>. https:https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Ramsey_Sound_Regeneration_Tidal_Project.