PRIMRE/Databases/Projects Database/Projects/Marmok BiMEP Test
< PRIMRE | Databases | Projects Database | Projects
Marmok BiMEP Test
The MARMOK-A-5 is a prototype of a low power WEC. It is a floating device, is a spar buoy based on OWC technology. The prototype – the result of public pre-commercial procurement by the EVE (Basque Energy Agency) - has a length of 42m (36m draft and 6m freeboard), is 5m in diameter, with a displacement of 162Tm. It was installed on the BiMEP marine energy platform, the first WEC connected to the Spanish state electricity grid, and one of the first devices connected in the world.
- Planned: Project has identified a deployment location and is preparing for deployment
- Operational: Project is deployed in the water and is active
- Completed: Project was previously deployed in the water
- Decommissioned: Installation has been fully removed in accordance with regulations
- Canceled: Project was canceled before being deployed in the water
- Wave
This Project has the following MRE Devices
Filters:
Citation Formats
“Marmok BiMEP Test.” Marine Energy Projects Database: Projects, PRIMRE, United States Department of Energy, https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Marmok_BiMEP_Test. Accessed <day> <monthRoman> <year>.
Marine Energy Projects Database: Projects. <year>. "Marmok BiMEP Test." Accessed <monthRoman> <day>, <year>. https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Marmok_BiMEP_Test.