Larantuka 10MW project

The Larantuka Strait is located in between the Flores and Adonara islands and has one of the strongest and most reliable tidal currents in Indonesia. SBS, in partnership with State-owned Enterprise, PT. Indonesia Power, are jointly developing the first utility-scale tidal turbine generator facility as part of State-owned electrical offtaker, PLN’s De-Dieselisation Plan, where the existing 5,200 diesel-fuelled generators located in 2,100 locations around the Archipelago are to be replaced with a mix of renewable energy devices, one of which is zero-emission tidal turbine generators.
In February 2022, SBS and Indonesia Power commenced a feasibility study to determine the techno-economic options for arrays of tidal turbine generators powered by tidal flows in the Larantuka Strait. The study included an IEC-compliant offshore survey to independently gather primary tidal resource data from the Larantuka Strait. The offshore survey was conducted by the geological division of top Indonesian university, Institut Teknologi Bandung (ITB). Results of the ITB offshore survey were subsequently included in the feasibility study report deliverable which was carried out by SBS over a 3-month duration.
Following completion of the feasibility study, the partners plan to establish a special purpose company to function as the Independent Power Producer (IPP) on behalf of the partners. Equity in the IPP will be 51% (Indonesia Power) and 49% (SBS). Following an Assignment Agreement with PLN, the Parties will deliver a 25-year PPA (Power Purchase Agreement).

www.offshore-energy.biz

Project Manager
Additional Information
Project Status Is the project actively being planned or is deployed in the water (active)? Or was the project canceled or completed (inactive)?
Active
Project Life Cycle Project Progress through life cycle:<ul> <li>Planned: Project has identified a deployment location and is preparing for deployment</li> <li>Operational: Project is deployed in the water and is active</li> <li>Completed: Project was previously deployed in the water</li> <li>Decommissioned: Installation has been fully removed in accordance with regulations</li> <li>Canceled: Project was canceled before being deployed in the water</li></ul>
Planned
Max Rated Power Capacity The maximum amount of electricity that can be produced by project, based on available resources and device nameplate capacity.
10 MW
Project Start Year
2021
Energy Resource
  • Tidal
Project Scale
Full-scale
Grid Connectivity
Grid Connected
Waterbody
Larantuka Strait
Site Characteristics Geographic characterization for the project location:<ul> <li>Open Ocean: Main body of ocean, not enclosed or partially enclosed by land</li> <li>Coastal: Open water near the coast, spanning between land and shelf boundary</li> <li>Enclosed Bay: water that is partially surrounded by land, with a mouth open to larger water</li> <li>Constricted Channel: A channel where water flows quickly due to narrowing by the land</li> <li>River: Water flowing from land towards a larger body of water</li></ul>
Constricted Channel
Country
Indonesia
Last Modified
25 June 2025