Seabased has been contracted by TC’s Energy, a Ghanaian renewable energy production company, to deliver a wave energy plant near Ada, Ghana. The 100 MW park is one of the first, and one the largest, commercial contracts in the fledgling wave energy industry. Seabased wave parks produce electricity using wave energy converters (WECs), which consist of buoys connected to linear generators. The buoys move with the waves, and this motion generates power. A switchgear makes the electricity suitable for grid use.
- Planned: Project has identified a deployment location and is preparing for deployment
- Operational: Project is deployed in the water and is active
- Completed: Project was previously deployed in the water
- Decommissioned: Installation has been fully removed in accordance with regulations
- Canceled: Project was canceled before being deployed in the water
- Wave
- Open Ocean: Main body of ocean, not enclosed or partially enclosed by land
- Coastal: Open water near the coast, spanning between land and shelf boundary
- Enclosed Bay: water that is partially surrounded by land, with a mouth open to larger water
- Constricted Channel: A channel where water flows quickly due to narrowing by the land
- River: Water flowing from land towards a larger body of water
This Project has the following MRE Devices
Filters:
Citation Formats
“Ghana Wave Park Commercial.” Marine Energy Projects Database: Projects, PRIMRE, United States Department of Energy, https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Ghana_Wave_Park_Commercial. Accessed <day> <monthRoman> <year>.
Marine Energy Projects Database: Projects. <year>. "Ghana Wave Park Commercial." Accessed <monthRoman> <day>, <year>. https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Ghana_Wave_Park_Commercial.