It is proposed that the Fair Head Tidal Energy project could be delivered in phases. FHT is considering an initial demonstration array of around 4 – 6 turbines, and with an output of up to 10 MW, which would be connected into the existing electricity grid at Ballycastle. Further phases would complete the proposed 100 MW array of tidal turbines that would be capable of powering some 70,000 homes. The project is still in its consenting phase.

Fair Head Image.jpg www.mdpi.com

Project Manager
Additional Information
Project Status
Is the project actively being planned or is deployed in the water (active)? Or was the project canceled or completed (inactive)?
Inactive
Project Life Cycle
Project Progress through life cycle:
  • Planned: Project has identified a deployment location and is preparing for deployment
  • Operational: Project is deployed in the water and is active
  • Completed: Project was previously deployed in the water
  • Decommissioned: Installation has been fully removed in accordance with regulations
  • Canceled: Project was canceled before being deployed in the water
Canceled
Max Rated Power Capacity
The maximum amount of electricity that can be produced by project, based on available resources and device nameplate capacity.
100 MW
Project Duration
2012 - 2017
Energy Resource
  • Tidal
Project Scale
Full-scale



Country
Ireland
Last Modified
10 June 2025


Citation Formats

“Fair Head Phase 2.” Marine Energy Projects Database: Projects, PRIMRE, United States Department of Energy, https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Fair_Head_Phase_2. Accessed <day> <monthRoman> <year>.
Marine Energy Projects Database: Projects. <year>. "Fair Head Phase 2." Accessed <monthRoman> <day>, <year>. https://openei.org/wiki/PRIMRE/Databases/Projects_Database/Projects/Fair_Head_Phase_2.