Sunzia Southwest
NEPA Document Collection for: Sunzia Southwest
EIS
SunZia Southwest Transmission Project
Proposed Action
The Applicant’s objectives are to increase transfer capability, thereby relieving existing transmission congestion and allowing additional electricity to be generated and transported to western power markets and load centers in the Desert Southwest. The Project would be colocated with areas of undeveloped renewable resource potential to provide a path for energy delivery, and would provide power to help meet growing demand in the western United States and enhance domestic energy security. The Applicant group comprises load-serving utilities and independent developers. The Project would assist load-serving utilities in meeting the requirements to address energy delivery obligations to meet state renewable portfolio standards; while the independent developers’ purpose for the Project is to create a market opportunity to satisfy transmission needs that have been identified at local, regional, and national levels.
The proposed Project would include two new, single-circuit 500 kV transmission lines located within a right-of-way up to 1,000 feet wide. At least one of the two 500 kV transmission lines would be constructed and operated as an alternating current (AC) facility; the other transmission line could be either an AC or direct current (DC) facility. Depending on the configuration, the Project could provide up to 4,500 megawatts (MW) of additional transfer capability on the regional electrical grid. Based on a typical span of 1,400 feet, three to four transmission line structures per mile would be required for each of the two lines, with typical structure heights of 135 feet that range between 100 and 175 feet.
The transmission line route would originate at a new substation (SunZia East) in Lincoln County, New Mexico, and terminate at the Pinal Central Substation in Pinal County, Arizona. The Project would be located within Lincoln, Socorro, Sierra, Luna, Grant, Hidalgo, and/or Torrance counties in New Mexico; and Graham, Greenlee, Cochise, Pinal, and/or Pima counties in Arizona. The BLM preferred alternative is approximately 515 miles long, and alternative routes range between 460 and 542 miles in length.
The proposed Project would include the construction of the SunZia East 500 kV Substation at the Project’s eastern terminus in Lincoln County, and up to three ntermediate substations on private or state lands: -Midpoint Substation, located in Luna County, New Mexico -Lordsburg Substation, located in Hidalgo County, New Mexico -Willow-500 kV Substation, located in Graham County, Arizona The Pinal Central Substation, at the Project’s western terminus, has already received its regulatory permits and approvals and will be constructed by Salt River Project and other entities.
Data Completion Notes
A complete record of all documents completed for Project is located at: http://www.blm.gov/nm/st/en/prog/more/lands_realty/sunzia_southwest_transmission.html
Documents
EA/EIS Report:- SunZia Southwest Transmission Project FEIS and Proposed RMP Amendments.pdf
- SunZia Record of Decision.pdf
- SunZia FEIS Appendices A through C.pdf
- SunZia FEIS Appendices D1 through D4.pdf
- SunZia FEIS Appendices D5 through D6.pdf
- SunZia FEIS Appendices E through I.pdf
- SunZia FEIS Appendices J1
- SunZia FEIS Appendices J2.pdf
- SunZia FEIS Appendices J3
- SunZia FEIS Appendices K through M.pdf
- SunZia FEIS Map Volume 1.pdf
- SunZia FEIS Map Volume 2.pdf
- Final EIS
- Appendices
- Maps
- Interactive Map
Resource Analysis
Resource | Not Present |
Present, Not Affected |
Present, Potentially Affected |
Not Indicated |
Comment | Applicant Proposed Mitigation |
Agency Imposed Mitigation |
---|
Access and Transportation |
|
CloseStandard Mitigation Measures for Access/Transportation Resources:
|
CloseSelective Mitigation Measures for Access/Transportation Resources:
|
Air Quality |
|
CloseStandard Mitigation Measures for Air Quality:
|
Cultural Resources |
|
CloseStandard Mitigation Measures for Cultural Resources:
|
CloseSelective Mitigation Measures for Cultural Resources:
|
Geology and Minerals |
|
CloseSelective Mitigation Measures for Geological and Mineral:
|
Invasive, Nonnative Species |
|
CloseStandard Mitigation Measures for Invasive, Nonnative Species:
|
Lands and Realty |
|
CloseSelective Mitigation Measures for Land Use:
|
Migratory Birds |
|
CloseStandard Mitigation Measures for Migratory Birds:
|
Paleontological Resources |
|
CloseStandard Mitigation Measures for Paleontological Resources:
|
CloseSelective Mitigation Measures for Paleontological Resources:
|
Prime or Unique Farmlands |
|
CloseStandard Mitigation Measures for Prime or Unique Farmlands:
|
Public Health and Safety |
|
CloseStandard Mitigation Measures for Public Health and Safety:
|
Range Resources |
|
CloseStandard Mitigation Measures for Range Resources:
|
Threatened and Endangered Species |
|
CloseStandard Mitigation Measures for Threatened and Endangered Species:
|
Vegetation |
|
CloseStandard Mitigation Measures for Vegetation:
|
CloseSelective Mitigation Measures for Vegetation:
|
Visual Resources |
|
CloseStandard Mitigation Measures for Visual Resources:
|
CloseSelective Mitigation Measures for Visual Resources:
|
Wastes Hazardous or Solid |
|
CloseStandard Mitigation Measures for Waste Hazardous or Solid:
|
Water Quality |
|
CloseStandard Mitigation Measures for Water Quality Surface and Ground:
|
CloseSelective Mitigation Measures for Water Quality Surface and Ground:
|
Wetlands and Riparian Zones |
|
CloseSelective Mitigation Measures for Wetlands and Riparian Zones:
|
Wildlife Resources |
|
CloseStandard Mitigation Measures for Wildlife Resources:
|
CloseSelective Mitigation Measures for Wildlife Resources:
species. Sensitive periods, species affected, and areas of concern would be approved in advance of construction or operations by the BLM Authorized Officer.
|