8-VT-c.1 — Certificate of Public Good Process
The developer must obtain a Certificate of Public Good (CPG) from the Public Utility Commission (Commission) for projects not covered by a Federal Energy Regulatory Commission (FERC) license or exemption, including transmission line extension projects and group net-metered hydroelectric power system interconnections. Vt. Stat. Ann. tit. 30 § 248 et seq. The CPG review process for hydroelectric generation projects is the same for transmission projects. For more information, see: