San Diego County - Design Standards for County Facilities

From Open Energy Information


Last modified on February 12, 2015.

Rules Regulations Policies Program

Place California
Additional Place applies to San Diego County
Name San Diego County - Design Standards for County Facilities
Incentive Type Energy Standards for Public Buildings
Applicable Sector Local Government
Eligible Technologies Comprehensive Measures/Whole Building, Biomass, CHP/Cogeneration, Fuel Cells using Renewable Fuels, Other Distributed Generation Technologies, Photovoltaics, Wind, Unspecified technologies
Active Incentive Yes
Incentive Inactive Date 2016-12-31
Implementing Sector Local
Energy Category Energy Efficiency Incentive Programs, Renewable Energy Incentive Programs






EquipmentProducts New construction and major renovations must install computerized energy management systems







Requirement New construction and major renovations must obtain LEED Certification

New buildings over 5,000 square feet must meet 2.5% of annual energy consumption with on-site renewable energy
New buildings over 5,000 square feet must be designed to allow the installation of PV systems











Website http://www.sdcounty.ca.gov/general_services/Energy/Energy.html
Last DSIRE Review 2012-07-23
Last Substantive Modification
to Summary by DSIRE
2011-07-21


References Database of State Incentives for Renewables and Efficiency (DSIRE)[1]


Summary

The San Diego County Board of Supervisors established design standards for county facilities and property. Among other requirements, the policy requires that all new county buildings or major building renovations obtain U.S. Green Building Council (USGBC) LEED Building Certification. Renovations of over 5,000 square feet are considered major renovations. New buildings and major renovations must also incorporate a computerized energy management that complies with the USGBC LEED Credit EA 5 - Measurement and Verification certification requirements.

New buildings of larger than 5,000 square feet must incorporate on-site renewable energy that will provide for at least 2.5% of its annual energy consumption. In addition, such buildings must also be constructed so that photovoltaic installations are possible.


Incentive Contact

Contact Name Facility Planning, Design and Construction
Department San Diego County
Division Department of General Services



Phone (858) 694-3610




Authorities (Please contact the if there are any file problems.)

Authority 1: Board of Supervisors Policy No. G-15


Expiration Date 2016-12-31
















  • Incentive and policy data are reviewed and approved by the N.C. Solar Center's DSIRE project staff.[1]

References

  1. 1.0 1.1  "Database of State Incentives for Renewables and Efficiency (DSIRE)" Cite error: Invalid <ref> tag; name "DSIRE" defined multiple times with different content