Property:GeneratingCapacity
Property Name | GeneratingCapacity |
---|---|
Property Type | Quantity
|
Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume.
Acceptable units (and their conversions) are:
- 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS
- 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS
- 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS
- 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS
- 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS
- 0.000001 TW,terawatt,terawatts,Terawatt,Terawatts,TeraWatt,TeraWatts,TERAWATT,TERAWATTS
- 0.000000001 PW,petawatt,petawatts,Petawatt,Petawatts,PetaWatt,PetaWatts,PETAWATT,PETAWATTS
- 0.000000000001 EW,exawatt,exawatts,Exawatt,Exawatts,ExaWatt,ExaWatts,EXAWATT,EXAWATTS
- 0.000000000000001 ZW,zettawatt,zettawatts,Zettawatt,ZettaWatt,ZettaWatts,ZETTAWATT,ZETTAWATTS
Pages using the property "GeneratingCapacity"
Showing 25 pages using this property.
2 | |
---|---|
251 Wind + | 18.43 MW 18,430 kW +18,430,000 W 18,430,000,000 mW 0.0184 GW 1.843e-5 TW |
3 | |
3-D Metals + | 0.1 MW 100 kW +100,000 W 100,000,000 mW 1.0e-4 GW 1.0e-7 TW |
30 MW Iowa DG Portfolio + | 30 MW 30,000 kW +30,000,000 W 30,000,000,000 mW 0.03 GW 3.0e-5 TW |
6 | |
6th Space Warning Squadron + | 3.36 MW 3,360 kW +3,360,000 W 3,360,000,000 mW 0.00336 GW 3.36e-6 TW |
A | |
AB Tehachapi Wind Farm + | 6.97 MW 6,970 kW +6,970,000 W 6,970,000,000 mW 0.00697 GW 6.97e-6 TW |
AES Mendota Biomass Facility + | 25 MW 25,000 kW +25,000,000 W 25,000,000,000 mW 0.025 GW 2.5e-5 TW |
AFCEE MMR Turbines + | 3 MW 3,000 kW +3,000,000 W 3,000,000,000 mW 0.003 GW 3.0e-6 TW |
AG Land 1 + | 1.6 MW 1,600 kW +1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW |
AG Land 2 + | 1.6 MW 1,600 kW +1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW |
AG Land 3 + | 1.6 MW 1,600 kW +1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW |
AG Land 4 + | 1.6 MW 1,600 kW +1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW |
AG Land 5 + | 1.6 MW 1,600 kW +1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW |
AG Land 6 + | 1.6 MW 1,600 kW +1,600,000 W 1,600,000,000 mW 0.0016 GW 1.6e-6 TW |
APS Biomass I Biomass Facility + | 2.85 MW 2,850 kW +2,850,000 W 2,850,000,000 mW 0.00285 GW 2.85e-6 TW |
ARPA (Prower and Baca County) (Lamar) + | 3 MW 3,000 kW +3,000,000 W 3,000,000,000 mW 0.003 GW 3.0e-6 TW |
AV Solar Ranch I Solar Power Plant + | 230 MW 230,000 kW +230,000,000 W 230,000,000,000 mW 0.23 GW 2.3e-4 TW |
AVTEC + | 0.1 MW 100 kW +100,000 W 100,000,000 mW 1.0e-4 GW 1.0e-7 TW |
Aberdeen Biomass Facility + | 12 MW 12,000 kW +12,000,000 W 12,000,000,000 mW 0.012 GW 1.2e-5 TW |
Acme Landfill Biomass Facility + | 0.27 MW 270 kW +270,000 W 270,000,000 mW 2.7e-4 GW 2.7e-7 TW |
Adair Wind Farm I + | 0.23 MW 230 kW +230,000 W 230,000,000 mW 2.3e-4 GW 2.3e-7 TW |
Adair Wind Farm II + | 174.8 MW 174,800 kW +174,800,000 W 174,800,000,000 mW 0.175 GW 1.748e-4 TW |
Adams + | 144.9 MW 144,900 kW +144,900,000 W 144,900,000,000 mW 0.145 GW 1.449e-4 TW |
Adams Wind Project + | 19.8 MW 19,800 kW +19,800,000 W 19,800,000,000 mW 0.0198 GW 1.98e-5 TW |
Adrian Energy Associates LLC Biomass Facility + | 2.4 MW 2,400 kW +2,400,000 W 2,400,000,000 mW 0.0024 GW 2.4e-6 TW |
Aegir II + | 500 MW 500,000 kW +500,000,000 W 500,000,000,000 mW 0.5 GW 5.0e-4 TW |