Distributed Generation Study/Tudor Gardens
From Open Energy Information
Study Location | New York, New York |
---|---|
Site Description | Residential-Multifamily-Single Building |
Study Type | Long-term Monitoring |
Technology | Internal Combustion Engine |
Prime Mover | Tecogen CM-75 |
Heat Recovery Systems | Built-in |
Fuel | Natural Gas |
System Installer | Aegis Energy |
System Enclosure | Indoor |
System Application | Combined Heat and Power |
Number of Prime Movers | 2 |
Stand-alone Capability | None |
Power Rating | 150 kW0.15 MW <br />150,000 W <br />150,000,000 mW <br />1.5e-4 GW <br />1.5e-7 TW <br /> |
Nominal Voltage (V) | 480 |
Heat Recovery Rating (BTU/hr) | 980000 |
Cooling Capacity (Refrig/Tons) | |
Origin of Controller | Manufacturer-Integrated |
Component Integration | Factory Integrated |
Start Date | 2005/07/01 |
Monitoring Termination Date | 1969/12/31 |
Primary Power Application | Based Load |
Secondary Power Application | |
Primary Heat/Cooling Application | Domestic Hot Water |
Secondary Heat/Cooling Application | Space Heat and/or Cooling |
Capacity Factor | .825 |
Availability | 0 |
Electrical Efficiency (HHV) | |
Electrical Efficiency (LHV) | |
Highest Combustion Intake Air Temperature (F) | 75°F297.039 K <br />23.889 °C <br />534.67 °R <br /> |
Lowest Combustion Intake Air Temperature (F) | 65°F291.483 K <br />18.333 °C <br />524.67 °R <br /> |
NOx Emissions Data Available | No |
CO Emissions Data Available | No |
12-Month Run Hours | 23239 |
12-Month Energy Savings (USD) | |
System Cost (USD) | |
Report URL | http://chp.nyserda.org/facilities/details.cfm?facility=44 |
Study Verified | Yes |