View Rate

Basic Information
Utility Name
Niagara Mohawk Power Corp.
EIA Id
13573
Rate Name
SC3A - Large General ToU Service, 0-2.2 kV (Unbundled)
Expert Has Verified
Yes
Is Default
 
Effective Date
03/01/2016
End Date
06/30/2017
Supersedes
SC3A - Large General ToU Service, 0-2.2 kV (Unbundled)
Sector
Industrial
Service Type
 
Description
Supply Service Charge (Determination of Energy Charge): 46.1.3.1 For each hour, the NYSIO Day-Ahead LBMP in $/kWh; plus 46.1.3.2 Effective January 1, 2012 through April 30, 2012, for each hour between 12:00 noon and 8:00 PM on weekdays (excluding any Holiday that falls on a weekday) the forecasted LBMP in $/kW-mo times the sum of one plus the Unforced Capacity Requirement of the NYISO, times the sum of one plus the Demand Curve requirement of the NYISO divided by hours between 12:00 noon and 8:00 PM on weekdays (excluding any Holiday that falls on a weekday) of the applicable month divided by the respective Class Load Factor; plus 46.1.3.3 For each hour, the forecasted cost, in $/kWh, of NYISO charges under all applicable OATT schedules; plus 46.1.3.4 For each hour the forecasted NYISO NYPA Transmission Adjustment Charge (NTAC) rate, in $/kWh. 46.1.3.5 The sum of each item shall be adjusted by the Local Transmission Efficiency Factors set forth in Rule 39.18.1.1 for the applicabledistribution delivery voltage level and by the Average Unaccounted for Energy Factor set forth in Rule 39.18.1.2 plus any applicable taxes. 46.1.3.6 Any billing adjustment from the NYISO may be flowed through this Rule 46 based on the tariff rules in effect on the date service was rendered. 46.1.3.7 Effective May 1, 2012, a customer-specific peak load demand charge shall be calculated based on the customer's unique Capacity Tag assigned for the duration of each NYISO Capability Year and on the forecasted NYISO Capacity Spot Market price, and shall be assessed in each monthly billing period. This pricing information can be found at the following location: http://mis.nyiso.com/public/
Source or Reference
https://www2.dps.ny.gov/ETS/jobs/display/download/5812136.pdf
Source Parent
https://www2.dps.ny.gov/ETS/search/searchShortcutEffectiveAction.cfm?M%3FIW%3F!ZQOH%25NL%40LNR%3C%2BR%3F%2BXTWD8AM%3F%263%40JZ%3E%3EME*OC9%3E4J%292TH!J%3EH*K%3D%26%28VP%0AMLF^GL*_%25AKO%2BS^H%3BQO_.%23\-D4%3B%2F%2FO%20*VBMFR4K%3BHJ%3A%22%26LEZ[EA642!2%3E%24%3B%3E.%0AMM5%26[D%28\%2CWG%26][I.!_XNPV95%22B7%3F%3DL%28*88%25FCK%3EZM%27\\4K9Z\I%3AG9IJJ8VK%22%3A%0AH%26%22Z\6%29VRC%26%3EDF3%3F%3AJ%26%3AM]UF2GWR%2C\L%22H2U%2C5M9R_%3C7X^O%40QROL%28!H%20%20%20%0A
Compensation for distributed generation
 
Basic Comments  
Applicability
Demand
Minimum
2000
Maximum
 
Demand Units
kW
History (months)
 
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
 
Maximum (V)
2200
Character of Service
Voltage Category
Secondary
Phase Wiring
Single and 3-Phase
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
03/25/2016 10:33:23
Dzstrv
03/25/2016 10:34:36
Dzstrv
07/26/2017 09:40:43
Dzstrv (Approval)
Seasonal/Monthly Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1
1
 
9.18
1.24971
Time of Use Demand Charge Structure
Period
Tier
Max Usage
Rate $/
Adjustments $/
1
1
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Lookback Months
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
Lookback Percent
 
Lookback Range (months)
 
Demand Window (minutes)
 
Demand Reactive Power Charge ($/kVAR)
1.02
Coincident Rate Structure
Period
Tier
Max Usage
Rate $/
Adjustments $/
1
1
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Daily Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Other Demand Attributes
Demand Comments  
Tiered Energy Usage Charge Structure
Period
Tier
Max Usage
Max Usage Units
Rate $/kWh
Adjustments $/kWh
Sell $/kWh
1
1
 
kWh
0
0.010423
 
Fuel Adjustments Monthly ($/kWh)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Other Energy Attributes
Energy Comments Adjustments = System Benefits charge + Transmission Revenue adjustment + Supply Service charges + Reliability Support Services surcharge + Incremental State Assessment surcharge + Revenue Decoupling Mechanism
Fixed Charge Information
Fixed Charge Units
$/month
Fixed Charge (First Meter)
1000
Fixed Charge (Each Additional Meter)
 
Minimum Charge
 
Minimum Charge Units
 
Other Fixed Charge Attributes