United States





Search results: 60757 Rates
Utility Name Rate Name Sector Service Type Approved Is Default Effective Date End Date Latest Update Actions
Southern California Edison Co General Service Time-of-use Electric Vehicle Charging: TOU-EV-7 Option E Single Phase (220kV plus) Commercial Bundled   2023-10-01 2024-09-30 2024-12-09 12:50:01 View
Southern California Edison Co General Service Time-of-use Electric Vehicle Charging: TOU-EV-7 Option E Single Phase (below 2kV) Commercial Bundled   2023-10-01 2024-09-30 2024-12-09 12:49:35 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-09 12:38:09 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-09 12:38:04 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (at 220kV) Commercial Bundled   2024-10-01 2024-12-09 12:37:56 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (under 2kV) Commercial Bundled   2024-10-01 2024-12-09 12:35:42 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 12:27:33 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 12:27:28 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 12:27:22 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option E (under 2kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 12:27:16 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (At 220kv) Commercial Bundled   2024-10-01 2024-12-09 12:26:29 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-09 12:25:58 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-09 12:25:09 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (Under 2kV) Commercial Bundled   2024-10-01 2024-12-09 11:46:47 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (At 220kv) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:41:10 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:41:00 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:40:45 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Large: TOU-PA-3, Option D (Under 2kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:40:40 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (Under 2kv) Commercial Bundled   2024-10-01 2024-12-09 11:34:33 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (at 220kV) Commercial Bundled   2024-10-01 2024-12-09 11:34:06 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-09 11:34:00 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (2kV-50kV) Commercial Bundled   2023-10-01 2024-12-09 11:33:57 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:22:21 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:22:14 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (2kV-50kV) Commercial Bundled     2023-10-01 2023-09-30 2024-12-09 11:22:08 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping - Small to Medium: TOU-PA-2, Option E (Under 2kv) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:21:54 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (at 220kV) Commercial Bundled   2024-10-01 2024-12-09 11:18:33 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-09 11:18:06 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-09 11:17:35 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (Under 2kV) Commercial Bundled   2024-10-01 2024-12-09 11:16:14 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:04:42 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:04:37 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:04:32 View
Southern California Edison Co Time-Of-Use Agricultural and Pumping-Small to Medium: TOU-PA-2, Option D (Under 2kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 11:04:26 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (Under 2kV) Commercial Bundled   2024-10-01 2024-12-09 11:03:09 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-09 11:03:06 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-09 11:03:02 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (at 220kV) Commercial Bundled   2024-10-01 2024-12-09 11:02:59 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:56:31 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:56:25 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:56:19 View
Southern California Edison Co Power-Agricultural and Pumping Demand Metered: PA-2 (Under 2kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:56:13 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (Under 2kV) Commercial Bundled   2024-10-01 2024-12-09 10:54:34 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-09 10:54:30 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (50kV-220kv) Commercial Bundled   2024-10-01 2024-12-09 10:54:26 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (at 220kV) Commercial Bundled   2024-10-01 2024-12-09 10:54:23 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:33:34 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (50kV-220kv) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:33:26 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:33:19 View
Southern California Edison Co Power - Agricultural and Pumping Connected Load Basis: PA-1 (Under 2kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-09 10:33:14 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (Under 2 kV) Commercial Bundled   2024-10-01 2024-12-06 13:17:12 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-06 13:16:36 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (50kV - 220kV) Commercial Bundled   2024-10-01 2024-12-06 13:16:03 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (at 220kV) Commercial Bundled   2024-10-01 2024-12-06 13:15:58 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (Under 2kV) Commercial Bundled   2024-10-01 2024-12-06 13:15:40 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (2kV-50kV) Commercial Bundled   2024-10-01 2024-12-06 13:15:35 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-06 13:15:31 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (at 220kV) Commercial Bundled   2024-10-01 2024-12-06 13:15:29 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:53:21 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (50kV - 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:53:14 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:53:07 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Single phase (Under 2 kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:53:00 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (Under 2kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:52:51 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (at 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:52:42 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:52:37 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option R: GS-2 TOU R - Three phase (2kV-50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:52:30 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (Under 2 kV) Commercial Bundled   2024-10-01 2024-12-06 12:35:12 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (Under 2 kV) Commercial Bundled   2024-10-01 2024-12-06 12:35:09 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (2kV - 50kV) Commercial Bundled   2024-10-01 2024-12-06 12:35:05 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (2kV - 50kV) Commercial Bundled   2024-10-01 2024-12-06 12:35:04 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (50kV - 220kV) Commercial Bundled   2024-10-01 2024-12-06 12:34:59 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (50kV-220kV) Commercial Bundled   2024-10-01 2024-12-06 12:34:56 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (At 220kV) Commercial Bundled   2024-10-01 2024-12-06 12:34:53 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (At 220kV) Commercial Bundled   2024-10-01 2024-12-06 12:34:51 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (At 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:30:40 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (50kV-220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:30:33 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (2kV - 50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:30:01 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Three Phase (Under 2 kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 12:29:55 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (At 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 09:07:10 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (50kV - 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 09:07:02 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (2kV - 50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 08:55:22 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option B: GS-2 TOU B, Single Phase (Under 2 kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-06 08:55:13 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (At 220kV) Commercial Bundled   2024-10-01 2024-12-04 15:47:11 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (50kV - 220kV) Commercial Bundled   2024-10-01 2024-12-04 15:47:08 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (2kV - 50kV) Commercial Bundled   2024-10-01 2024-12-04 15:47:06 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (Under 2 kV) Commercial Bundled   2024-10-01 2024-12-04 15:47:03 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (Under 2 kV) Commercial Bundled   2024-10-01 2024-12-04 15:47:00 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (2kV - 50kV) Commercial Bundled   2024-10-01 2024-12-04 15:46:58 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (50kV - 220kV) Commercial Bundled   2024-10-01 2024-12-04 15:46:56 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (At 220kV) Commercial Bundled   2024-10-01 2024-12-04 15:46:54 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (At 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:42:59 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (50kV - 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:42:53 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (2kV - 50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:42:46 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Three Phase (Under 2 kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:42:40 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (At 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:27:51 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (50kV - 220kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:27:45 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (2kV - 50kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:27:40 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option E: GS-2 TOU E, Single Phase (Under 2 kV) Commercial Bundled     2023-10-01 2024-09-30 2024-12-04 15:27:34 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option D-CPP: GS-2 TOU D, Three Phase (Under 2 kV) Commercial Bundled   2024-10-01 2024-12-04 15:19:41 View
Southern California Edison Co Time of Use, General Service, Demand Metered, Option D-CPP: GS-2 TOU D, Three Phase (50kV - 220kV) Commercial Bundled   2024-10-01 2024-12-04 15:11:36 View
Download All Approved Rates, (csv/gz) or (json/gz)
U.S. Utility Rate Database Query