View Rate

Basic Information
Utility Name
Los Angeles Department of Water & Power
Country
United States
EIA Id
11208
Monetary Unit
$
Rate Name
Customer Generation Primary Service (4.8kV) CG-2A
Expert Has Verified
 
Is Default
 
Effective Date
09/01/2022
End Date
12/31/2023
Supersedes
Customer Generation Primary Service (4.8kV) CG-2A
Sector
Commercial
Service Type
Bundled
Description
Applicable to customers who generate either to sell Excess Energy to the Department and/or to serve their own electricity requirements but have the Department provide Electric Service including supplemental and backup power. Rates E is an optional rate for customers receiving service under the Schedule CG-2. Rate E is available to Rate C customers. This optional rate E is for those customers who have demonstrated that they have the capability to reduce load during Department system conditions including, but not limited to, high system peaks, low generation, high market prices, temperature, and system contingencies. (1) Any Electric Service provided by the Department where a customer-owned electrical generating facility is interconnected with the Department's system for Parallel Operation and in compliance with the Department's Rules. (2) Loads that are served from the Primary Distribution System and which would normally be served under General Service Schedules A-1 and A-2. *Adjustment/kWh = Energy Cost Adjustment (ECA) ($0.05690) *Adjustment/kW = Electric Subsidy Adjustment (ESA) ($0.46) + Reliability Cost Adjustment (RCA)($0.96) = $1.42/kW
Source or Reference
https://www.ladwp.com/ladwp/faces/ladwp/aboutus/a-financesandreports/a-fr-electricrates/a-fr-er-electricrateschedules?_adf.ctrl-state=vze590i2_21&_afrLoop=472140469245846
Source Parent
https://www.ladwp.com/ladwp/faces/ladwp/aboutus/a-financesandreports/a-fr-electricrates/a-fr-er-spcommindrates?_adf.ctrl-state=11u2f5dwju_21&_afrLoop=745251365033398
Compensation for distributed generation
Net Metering
Basic Comments  
Applicability
Demand
Minimum
 
Maximum
 
Demand Units
kW
History (months)
 
Energy
Minimum (kWh)
 
Maximum (kWh)
 
History (months)
 
Service Voltage
Minimum (V)
4800
Maximum (V)
4800
Character of Service
Voltage Category
Primary
Phase Wiring
 
Load Factor
Minimum (%)
 
Maximum (%)
 
Averaging Window (Months)
 
History (Months)
 
Revision History
09/09/2022 10:25:56
Spodgorn
09/09/2022 10:28:21
Spodgorn
05/22/2024 09:39:47
Abalint
Seasonal/Monthly Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1
1
 
5.36
3.81
Time of Use Demand Charge Structure
Period
Tier
Max kW Usage
Rate $/kW
Adjustments $/kW
1
1
 
0
 
2
1
 
4.25
 
3
1
 
3.25
 
4
1
 
4.7
 
111111111111122221111111111111111111122221111111111111111111122221111111111111111111122221111111111111111111122221111111111111111133344443331111111111111133344443331111111111111133344443331111111111111133344443331111111111111111122221111111111111111111122221111111111111111111122221111111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Lookback Months
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
Lookback Percent
 
Lookback Range (months)
 
Demand Window (minutes)
 
Demand Reactive Power Charge ($/kVAR)
 
Coincident Rate Structure
Period
Tier
Max Usage
Rate $/
Adjustments $/
1
1
 
 
 
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
Daily Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Other Demand Attributes
Demand Comments Adjustment = Energy Subsidy adjustment + Reliability Cost adjustment + Incremental Reliability Cost adjustment
Tiered Energy Usage Charge Structure
Period
Tier
Max Usage
Max Usage Units
Rate $/kWh
Adjustments $/kWh
Sell $/kWh
1
1
 
kWh
0.03895
0.10346
 
2
1
 
kWh
0.05688
0.10346
 
3
1
 
kWh
0.03522
0.10346
 
4
1
 
kWh
0.05595
0.10346
 
5
1
 
kWh
0.06322
0.10346
 
Fuel Adjustments Monthly ($/kWh)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
 
 
 
 
 
 
 
 
 
 
 
 
111111111122222222221111111111111122222222221111111111111122222222221111111111111122222222221111111111111122222222221111333333333344455554443333333333333344455554443333333333333344455554443333333333333344455554443333111111111122222222221111111111111122222222221111111111111122222222221111
Weekday Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333333111111111111111111111111111111111111111111111111111111111111111111111111
Weekend Schedule
Jan
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Feb
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Mar
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Apr
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
May
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jun
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Jul
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Aug
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Oct
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Nov
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Dec
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Other Energy Attributes
Energy Comments Adjustments = Energy Cost adjustment + Incremental Reliability Cost adjustment + Variable Energy adjustment + Capped Renewable Portfolio Standard Energy adjustment + Variable Renewable Portfolio Standard Energy adjustment
Fixed Charge Information
Fixed Charge Units
$/month
Fixed Charge (First Meter)
150
Fixed Charge (Each Additional Meter)
 
Minimum Charge
 
Minimum Charge Units
 
Other Fixed Charge Attributes