RAPID/Library

From Open Energy Information

< RAPID

RAPIDRegulatory and Permitting Information Desktop Toolkit
My Projects

Reference Library

The RAPID Toolkit reference library is a collection of links to regulatory and permitting documents - including guidance, manuals, applications, tools, regulations, statutes, and rules - that are available on other websites.

Explore the reference library using the search options below or upload a reference.

View by Jurisdiction
jurisdiction selected
View by Topic
selected
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only
  • only

Title
Technology
Jurisdiction
Topic

10 U.S.C. 2668 Easements for Rights-of-Way<PROP>Bulk Transmission<MANY>Geothermal<MANY>Utilities<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>14 CCR 15064.5: Determining the Significance of Impacts to Archaeological and Historical Resources<PROP>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>15 C.F.R. §§ 930 et seq., Federal Consistency with Approved Coastal Management Programs<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>16 TAC, part 1, chapter 3, rule 3.7 Strata to be sealed off<PROP>Geothermal<PROP>Texas<PROP>Well Field<SEP>16 U.S.C. 1600 et seq.: Chapter 36: Forest and Rangeland Renewable Resources Planning<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<SEP>16 U.S.C. 470w<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<MANY>Cultural Resources<SEP>16 U.S.C. 5: Rights-of-way through parks or reservations for power and communication facilities<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>16 U.S.C. 79: Rights-of-way for public utilities<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>16 U.S.C. § 1456<PROP>Geothermal<MANY>Solar<PROP>California<MANY>Hawaii<PROP>Land Use<MANY>Site Considerations<SEP>16 U.S.C. §796, Regulation of the Development of Water Power and Resources Definitions<PROP>Hydrogen<PROP><PROP>Transmission Siting & Interconnection<SEP>16 U.S.C. §§ 791 - 828c, Federal Regulation and Development of Power<PROP>Hydropower<PROP><PROP>Power Plant<SEP>16 USC 1246 – Administration and Development of National Trails System<PROP>Hydropower<PROP>US Federal<PROP><SEP>16 USC 797<PROP>Hydropower<PROP><PROP><SEP>16 USC 797a - Congressional Authorization for Projects Within National Parks or Monuments<PROP>Hydropower<PROP>US Federal<PROP><SEP>16 USC 797c – Dams in National Park System Units<PROP>Hydropower<PROP>US Federal<PROP><SEP>16 USC 799 License duration, conditions, revocation, alteration, or surrender<PROP>Hydropower<PROP>US Federal<PROP><SEP>18 C.F.R. §§ 1.101 - 399, Federal Energy Regulatory Commission, Department of Energy Regulations<PROP>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>18 C.F.R. §§ 1.101 – 3c.3, General Rules<PROP>Hydropower<PROP>US Federal<PROP>Site Considerations<MANY>Power Plant<MANY>Environment<MANY>Water Access<MANY>On Site Evaluation<MANY>Biological Resources<MANY>Water Quality<MANY>Geological Resources<SEP>18 C.F.R. §§ 380.1-380.16, Regulations Implementing the National Environmental Policy Act<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>18 C.F.R. §§ 4.101 - 4.108, Exemption of Small Hydroelectric Power Projects of 10 MW or Less<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Plant Decommissioning<SEP>18 C.F.R. §§ 5.1-5.31, Integrated License Application Process<PROP>Hydropower<PROP>US Federal<PROP><SEP>18 C.F.R. §§ 50.1-50.11, Applications for Permits to Site Interstate Electric Transmission Facilities<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>18 C.F.R. §§ 6.1 6.5, Surrender of Termination of License<PROP>Smart Grid<MANY>Hydropower<PROP><PROP>Plant Decommissioning<SEP>18 C.F.R. §§ 7.1-7.9, Expedited Licensing Process<PROP>Hydropower<PROP>US Federal<PROP>General Construction<SEP>18 CFR §§ 16.1 – 16.26, Procedures Relating to Takeover and Relicensing of Licensed Projects<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>1981 Memorandum of Understanding between the Federal Energy Regulatory Commission and the Water and Power Resources Service<PROP>Hydropower<PROP>US Federal<PROP><SEP>1992 Memorandum of Understanding between FERC and BOR<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>1992 Memorandum of Understanding between the Federal Energy Regulatory Commission and the Department of Interior, Bureau of Reclamation<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>2 C.C.R. 402 - Division of Water Resources<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>2 C.C.R. 410 - Rules and Regulations for the Management and Control of Designated Ground Water<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>23 CFR 630 - Preconstruction Procedures<PROP><PROP>US Federal<PROP><SEP>23 CFR 645 - Utilities<PROP>Bulk Transmission<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>25 C.F.R. §§ 169.1-169.415, Rights-of-Way Over Indian Lands<PROP>Bulk Transmission<PROP>US Federal<PROP><SEP>25 C.F.R. §§ 2.1-2.21, Appeals from Administrative Actions<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>25 CFR §§ 169.1-169.415, Rights-of-Way Over Indian Land<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>25 U.S.C. 415: Leases of Restricted Lands<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>25 U.S.C. 477: Incorporation of Indian Tribes, Charter, Ratification by Election<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>25 U.S.C. 81: Contracts and Agreements with Indian Tribes<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>25 U.S.C. §§ 3501-3507, Indian Energy<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>25 U.S.C., Chapter 37, Indian Energy<PROP>Bulk Transmission<PROP>US Federal<PROP><SEP>30 TAC 295 Water Rights, Procedural<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>30 TAC 297 Water Rights, Substantive<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>33 U.S.C. 1329 - Nonpoint Source Management Programs<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>33 USC 1341 Permits and Licenses - Certification<PROP>Hydropower<PROP>US Federal<PROP><SEP>40 C.F.R. §§ 1503.1 - 1503.4, National Environmental Policy Act - Commenting<PROP>Bulk Transmission<MANY>Geothermal<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>40 C.F.R. §§ 50.1–98.478, Air Programs<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Air Quality<SEP>40 C.F.R. §§1505.1 - 1505.3, National Environmental Policy Act - Agency Decision-making<PROP>Bulk Transmission<MANY>Geothermal<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>42 U.S.C. 6601<PROP>Solar<PROP>US Federal<PROP>Site Considerations<MANY>Environment<MANY>Waste & Hazardous Material<SEP>42 U.S.C. 6901 - Solid Waste Disposal Act<PROP>Geothermal<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>42 U.S.C. 7401 et seq. - Clean Air Act<PROP>Geothermal<PROP>US Federal<PROP>Environment<MANY>Air Quality<SEP>42 U.S.C. 9601<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>42 U.S.C. 9604<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>42 U.S.C. 9607<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>43 U.S.C. §1761, Grant, issue, or renewal of rights-of-way<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>43 U.S.C. §485h New Projects; Sale of Water and Electric Power<PROP>Hydropower<PROP>US Federal<PROP>Environment<SEP>50 C.F.R. §§ 21.1 – 21.61<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Plant Decommissioning<MANY>Biological Resources<SEP>516 DM Chapter 8 Managing the NEPA Process U.S. Fish and Wildlife Service<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<SEP>54 USC Subtitle I - National Park System<PROP>Hydropower<PROP>US Federal<PROP><SEP>54 USC Subtitle II – Outdoor Recreation Programs<PROP>Hydropower<PROP>US Federal<PROP><SEP>550 FW 3 Documenting and Implementing Decisions<PROP><PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>550 FW 3 NEPA Decision Documents<PROP>Hydropower<PROP>US Federal<PROP>Environment<SEP>7 U.S.C. 4201 et seq.<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>A Decade of Colorado Water Supreme Court Water Decisions: 1996-2006<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>A Guide to the FERC Electric Transmission Facilities Permit Process<PROP>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>A Review of Regulatory and Policy Requirements for Hydrokinetic Power Projects in New York State<PROP>Hydropower<PROP>New York<PROP>Environment<SEP>AAC R-18-8-260 Hazardous Waste Management System<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Waste & Hazardous Material<SEP>AASHTO's Practitioner's Handbook<PROP>Bulk Transmission<PROP>US Federal<PROP><SEP>ACE-II: Areas of Conservation Emphasis<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>ACHP - Consultation with Indian Tribes in the Section 106 Review Process: a Handbook<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>ACHP - Meeting the "Reasonable and Good Faith" Identification Standard in Section 106 Review<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>ACHP - Nationwide Programmatic Agreements<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Biological Resources<SEP>ACHP - Recommended Approach for Consultation on Recovery of Significant Information from Archeaological Sites<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>ACHP - Relationship of Section 106 to Other Laws<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>ACHP - Section 106 Applicant Toolkit<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>ACHP - Section 106 Regulations Flowchart<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<MANY>Geological Resources<SEP>ACHP's Recommended Approach for Consultation on Recovery of Significant Information from Archaeological Sites<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>ADEC Water Online Application System Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>ADEC Water Permit Search Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>ADEQ 401 Water Quality Forms<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>ADEQ Hazardous Waste Management website<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Waste & Hazardous Material<SEP>ADEQ Managing Hazardous Waste Handbook<PROP><PROP>Arizona<PROP>Environment<MANY>Waste & Hazardous Material<SEP>ADEQ Nonpoint Source State Management Plan<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>ADEQ Water Quality Forms<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>ADNR DO&G Forms<PROP>Geothermal<PROP>Alaska<PROP>Land Access<SEP>ADNR Geothermal Leasing webpage<PROP>Geothermal<PROP>Alaska<PROP>Land Access<MANY>Exploration<SEP>ADNR ML&W Forms<PROP>Geothermal<MANY>Bulk Transmission<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>ADNR ML&W Special Use Lands Designation webpage<PROP>Geothermal<PROP>Alaska<PROP>Land Access<SEP>ADNR Water Forms<PROP>Geothermal<PROP>Alaska<PROP>Water Access<SEP>ADOT Forms<PROP>Bulk Transmission<PROP>Arizona<PROP>Land Access<SEP>ADOT&PF Application to Construct and Maintain a Driveway or an Approach Road on a Highway Right-Of-Way<PROP><PROP>Alaska<PROP>Land Access<SEP>ADOT&PF Permit to Construct and Maintain a Driveway or Approach Road on a Highway Right-of-Way<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>ARM 17-30 - Water Quality<PROP>Water<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>AZPDES Construction General Permit Fact Sheet<PROP>Geothermal<MANY>Solar<PROP>Arizona<PROP>General Construction<SEP>AZPDES General Permit for Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001)<PROP>Geothermal<MANY>Solar<PROP>Arizona<PROP>General Construction<SEP>Aboveground Storage Tank Operator Handbook (Alaska Department of Environmental Conservation)<PROP>Hydropower<PROP>Alaska<PROP>Power Plant<SEP>Act of February 5, 1948, 25 U.S.C. §§ 323-328<PROP>Bulk Transmission<PROP>US Federal<PROP><SEP>Adirondack League Club Inc. v. Sierra Club, 684 N.Y.S.2d 168, 172 (N.Y. 1998)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>Adjudicated Groundwater Basins in California<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>Administration of State Lands Interagency MOA July 2012<PROP>Hydropower<PROP>Vermont<PROP>Land Access<SEP>Advisory Council on Historic Preservation - Section 106 Regulations<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Environment<MANY>Cultural Resources<SEP>Advisory Council on Historic Preservation - §106 Regulations Flowchart Explanatory Material<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>Advisory Council on Historic Preservation website<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>Advisory Council on Historic Preservation – Consultation with Indian Tribes in the Section 106 Review Process Handbook<PROP><PROP>US Federal<PROP>Land Use<MANY>Site Considerations<SEP>Agency of Natural Resources Groundwater Withdrawal Reporting and Permitting Rules<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Air Force - Guide for the Submission of an Unsolicited Enhanced Use Lease Proposal<PROP>Solar<PROP><PROP>Land Access<SEP>Air Force - In-Kind Consideration Delivery Agreement<PROP>Solar<PROP><PROP>Land Access<SEP>Air Force - Site Development Lease<PROP>Solar<PROP><PROP>Land Access<SEP>Air Force Enhanced Use Lease (EUL) Playbook<PROP>Solar<MANY>Geothermal<PROP><PROP>Land Access<SEP>Air Force Generic Development Agreement<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Air Force Generic In-Kind Consideration Trust Agreement<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Air Permit Program Application Forms<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Air Quality<SEP>Air Permit Program Information Page<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Air Quality<SEP>Alabama Rivers Alliance v. FERC., 325 F.3d 290 (2003)<PROP>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Alabama – Ala. Admin. Code r. 335-3-1–21, Air Division<PROP>Bulk Transmission<PROP>Alabama<PROP>Environment<SEP>Alabama – Alabama Department of Transportation Permit Agreement for the Accommodation of Utility Facilities on Public Right-of-Way Form MB-01<PROP>Bulk Transmission<PROP>Alabama<PROP>Transmission Siting & Interconnection<SEP>Alabama – Alabama Department of Transportation Utility Manual<PROP>Bulk Transmission<MANY>Geothermal<PROP>Alabama<PROP>Transmission Siting & Interconnection<SEP>Alaska - Application for a New or Amended Certificate of Public Convenience and Necessity<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>Site Considerations<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>Alaska - CPCN General Information<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>Site Considerations<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>Alaska ADEC Process for Issuing a 401 Waiver of Corps 404 Permits<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska ADEC Wetlands Regulation<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska APDES Enforcement Response Guide<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska AS 46.15, Alaska Water Use Act<PROP>Geothermal<MANY>Water<PROP>Alaska<PROP>Water Access<SEP>Alaska Administrative Permit Manual: Oversize and Overweight Permits<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Air Permit Program Webpage<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Air Quality<SEP>Alaska Court System Forms, Instructions, and Publications Website<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska DEC Water Permit Search<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska DOT&PF Encroachment Permit<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>Alaska DOT&PF Encroachment Permit Application/Renewal Form<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>Alaska DOT&PF Utilities Manual<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>Alaska Department of Environmental Conservation Underground Storage Tank Registration and Certification<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Alaska Department of Environmental Conservation Underground Storage Tanks Intent to Install or Reconfigure<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Alaska Department of Natural Resources - Hazard Potential Classification and Jurisdictional Review Form<PROP>Hydropower<PROP>Alaska<PROP>Power Plant<SEP>Alaska Department of Natural Resources Land Search Records Webpage<PROP>Geothermal<PROP>Alaska<PROP>Land Use<SEP>Alaska Department of Natural Resources Land Use Planning Webpage<PROP>Geothermal<PROP>Alaska<PROP>Land Use<SEP>Alaska Department of Natural Resources Public Notices and Proposed Regulations Webpage<PROP>Geothermal<PROP>Alaska<PROP><SEP>Alaska District US Army Corps of Engineers<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska Division of Fire and Life Safety - Plan Review Bureau Website<PROP>Hydropower<PROP>Alaska<PROP>Power Plant<SEP>Alaska Division of Fire and Life Safety Website<PROP>Hydropower<PROP>Alaska<PROP>Power Plant<SEP>Alaska Division of Spill Prevention and Response Financial Responsibility for Underground Storage Tank Owners Website<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Alaska Division of Water - APDES Storm Water Forms Webpage<PROP>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Division of Water - General Permit for Excavation Dewatering – Permit Fact Sheet<PROP>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Division of Water - Water Online Application System<PROP>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Division of Water Permit Fees<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska Energy Authority – Hydroelectric Power Webpage<PROP>Hydropower<PROP>Alaska<PROP><SEP>Alaska Fish Habitat Permit Application<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Alaska General Fish Habitat Permits<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Alaska Highway Preconstruction Manual<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>Alaska Landmark Register Procedures<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Cultural Resources<SEP>Alaska Local Ordinances Governing Nonpoint Source Pollution<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska Native Claims Settlement Act<PROP>Geothermal<MANY>Bulk Transmission<MANY>Hydrogen<PROP><PROP>Land Use<SEP>Alaska Nonpoint Source Water Pollution Control Strategy<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska Oil and Gas Finding of Best Interest<PROP><PROP>Alaska<PROP>Environment<SEP>Alaska Oversize and/or Overweight Permit<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Pollutant Discharge Elimination System – General Permit for Excavation Dewatering, Permit Number AKG002000<PROP>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Public Participation in APDES Permitting Process<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska Request for SHPO Section 106 Review<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Environment<MANY>Cultural Resources<SEP>Alaska Rules of Appellate Procedure<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Sample Special Area Permit<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Alaska Special Area General Permits<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Alaska Special Area Permit Application<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Alaska Special Area Regulations<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Alaska Statutes Section 41.06.060, Definitions for Geothermal Resources<PROP>Geothermal<PROP>Alaska<PROP>Water Access<SEP>Alaska Storm Water Construction General Permit<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska Storm Water Construction General Permit Fact Sheet<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Storm Water Construction General Permit Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Alaska<PROP>General Construction<SEP>Alaska Underground Storage Tanks Website<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Alaska Underground Tanks Without Current Inspection Tags Website<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Alaska Water Quality Standards<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Water Quality<SEP>Alaska – Alaska Admin. Code tit. 18 §§ 50.005–990, Air Quality Control<PROP>Bulk Transmission<PROP>Alaska<PROP>Environment<MANY>Air Quality<SEP>Alberta - Highways Development and Protection Act<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta - Highways Development and Protection Act, R.S.A. 2004, c. H-8-5<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta - Highways Development and Protection Act, R.S.A. 2004, c. H-8.5<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta - Highways Development and Protection Regulation, A. Reg. 326/2009<PROP>Bulk Transmission<MANY>Geothermal<PROP>Alberta<PROP>Land Access<SEP>Alberta Energy Electronic Transfer System Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Environment and Parks – Electronic Disposition System<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Instructions for the Completion of EDS Supplements for Formal Disposition Applications<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Master Schedule of Standards and Conditions<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Administration Regulation Formal Disposition Information Letter<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Administration Regulation Table A1: Dispositions<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Dispositions Step Four – Disposition Management Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Dispositions Step One-Pre-Application Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Dispositions Step Three – Application Review Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Dispositions Step Three – Notice of Decision Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Public Lands Formal Disposition Application Process<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Ministry of Environment and Parks – Regional Plans Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Use<SEP>Alberta Ministry of Environment and Parks – Site Entry User Guide<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Municipal Affairs – Legislative Framework for Regional and Municipal Planning, Subdivision, and Development Control<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Use<SEP>Alberta Transportation Website<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Transportation – Application Procedures and Placement Conditions for Electrical Lines in the Vicinity of Provincial Highways<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Transportation – Application for Placement of Electrical Facility<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta Utilities Commission – Review Process Steps Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP><SEP>Alberta Utilities Commission – Statement of Intent to Participate in a Hearing (Form RP2)<PROP>Bulk Transmission<PROP>Alberta<PROP><SEP>Alberta Utilities Commission – e-Filing System User Guide<PROP>Bulk Transmission<PROP>Alberta<PROP>Transmission Siting & Interconnection<SEP>Alberta Utilities Commission – e-filing Webpage<PROP>Bulk Transmission<PROP>Alberta<PROP><SEP>Alberta Utility Commission Rule 001: Rules of Practice<PROP>Bulk Transmission<PROP>Alberta<PROP>Transmission Siting & Interconnection<SEP>Alberta Utility Commission Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments<PROP>Bulk Transmission<PROP>Alberta<PROP>Transmission Siting & Interconnection<SEP>Alberta – Alberta Land Stewardship Act, R.S.A 2009, c. A-26.8<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta – Electric Utilities Act, R.S.A. 2003, c. E-5.1<PROP>Bulk Transmission<PROP>Alberta<PROP><SEP>Alberta – Environmental Assessment (Mandatory and Exempted Activities) Regulation, A. Reg. 111/93<PROP>Bulk Transmission<PROP>Alberta<PROP>Environment<SEP>Alberta – Environmental Protection and Enhancement Act<PROP>Bulk Transmission<PROP>Alberta<PROP>Environment<SEP>Alberta – Guidelines on Consultation with First Nations on Land and Natural Resource Management<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta – Guidelines on Consultation with Metis Settlements on Land and Natural Resource Management<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta – Hydro and Electric Energy Act, R.S.A. 2000, c. H-16<PROP>Bulk Transmission<PROP>Alberta<PROP>Transmission Siting & Interconnection<SEP>Alberta – Hydro and Electric Energy Regulation, A. Reg. 409/83<PROP>Bulk Transmission<PROP>Alberta<PROP>Transmission Siting & Interconnection<MANY>Environment<SEP>Alberta – Land Stewardship Act, R.S.A. 2009, c. A-26.8<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Use<SEP>Alberta – Land-use Framework<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Use<SEP>Alberta – Municipal Government Act, R.S.A. 2000, c. M-26<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Use<SEP>Alberta – Planning Exemption Regulation, A. Reg. 223/2000<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Use<SEP>Alberta – Proponent Guide to First Nation and Metis Settlements Consultation Procedures<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta – Public Lands Act, R.S.A. 2000, c. P-40<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta – Public lands Administration Regulation, A. Reg. 187/2011<PROP>Bulk Transmission<PROP>Alberta<PROP>Land Access<SEP>Alberta – Utilities Commission Act, R.S.A. 2007, c. A-37.2<PROP>Bulk Transmission<PROP>Alberta<PROP>Transmission Siting & Interconnection<SEP>Alcoa Power Generating Inc., 110 FERC ¶ 61,056 (2005)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Alcoa Power Generating, Inc., 156 FERC ¶ 62,210 (2016)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>America's Water Infrastructure Act of 2018<PROP>Water<MANY>Hydropower<PROP>US Federal<PROP>Water Access<SEP>American Bar Association Waters of the U.S. Rule Webpage<PROP>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>American Indian Religious Freedom Act<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Land Access<SEP>America’s Power Plan: Siting – Finding a Home for Renewable Energy and Transmission<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Transmission Siting & Interconnection<SEP>An Introduction to Electric Power Transmission<PROP>Bulk Transmission<PROP>Arizona<MANY>Alaska<MANY>California<MANY>Colorado<MANY>Idaho<MANY>Montana<MANY>Nevada<MANY>New Mexico<MANY>Oregon<MANY>Texas<MANY>Utah<MANY>Washington<MANY>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>General Construction<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>An Introduction to Washington Water Law<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>Appendix S-50 - Power Purchase Agreement (PPA) - Public Utilities Commission<PROP>Utilities<MANY>Bulk Transmission<PROP>Hawaii<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Appendix S-51 - Transmission Line Approval - Public Utilities Commission<PROP>Bulk Transmission<PROP>Hawaii<PROP>Site Considerations<MANY>Land Access<SEP>Applicable EPA Regulations and Description Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Application Submittal Guidance for Stormwater Permits and Post-Authorization Stormwater Permit Correspondence<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Application Supplement for Wild, Scenic and Recreational Rivers System Permits<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Aesthetic Resources<SEP>Application for Fire and Life, Safety Plan Review (Alaska)<PROP>Hydropower<PROP>Alaska<PROP>Power Plant<SEP>Application for Nonpurposeful Eagle Take Permit<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Application for Permit to Construct Access Driveway Facilities on Highway ROW<PROP>Bulk Transmission<PROP>Texas<PROP>Land Access<SEP>Application for State Highway Approach<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Application for Use of Land Underwater (New York)<PROP>Hydropower<PROP>New York<PROP>Site Considerations<SEP>Application for a Certificate of Public Good for Net Metered Power Systems that are Non-Photovoltaic Systems Up to 150 kW (AC) in Capacity<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Application for a Colorado State Permit for Achaeological or Paleontological Work<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Cultural Resources<SEP>Application for the Use of State Owned Uplands<PROP>Bulk Transmission<PROP>Florida<PROP>Land Use<SEP>Application to Occupy or Perform Operations Upon a State Highway<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Aquatic Settlement Agreement Wells Hydroelectric Project FERC License No. 2149 (2010)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Archaeological Resources Protection Act<PROP><PROP>US Federal<PROP>Land Use<MANY>Environment<MANY>Cultural Resources<SEP>Archaeological and Historic Preservation Act<PROP><PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Argonne National Laboratory's Solar Energy Development Programmatic EIS Website<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Arizona Administrative Code<PROP>Solar<PROP>Arizona<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Water Access<MANY>Plant Decommissioning<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Arizona Const. Art.15 - The Corporation Commission<PROP>Bulk Transmission<MANY>Utilities<PROP>Arizona<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Arizona Corporation Commission Application for a Certificate of Convenience and Necessity for Competitive Retail Electricity Services<PROP>Bulk Transmission<PROP>Arizona<PROP>Transmission Siting & Interconnection<SEP>Arizona Department of Environmental Quality's AZPDES Website<PROP>Geothermal<MANY>Solar<MANY>Wind<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>Arizona Department of Environmental Quality's Application Forms and Guidance Website<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>Arizona Department of Environmental Quality's General Permits Website<PROP>Geothermal<MANY>Solar<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>Arizona Department of Environmental Quality's Individual Permits Website<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>Arizona Department of Transportation Policy for Accommodating Utilities on Highway Rights-Of-Way<PROP>Bulk Transmission<PROP>Arizona<PROP>Land Access<SEP>Arizona Online Environmental Review Tool<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Arizona<PROP>Environment<MANY>Biological Resources<SEP>Arizona Right-of-Way Instruction Sheet<PROP>Bulk Transmission<PROP>Arizona<PROP>Land Access<SEP>Arizona State Land Department Applications and Permits Website<PROP>Bulk Transmission<PROP>Arizona<PROP>Land Access<SEP>Arizona State Land Department Rights-of-Way Website<PROP>Bulk Transmission<PROP>Arizona<PROP>Land Access<SEP>Arizona – Ariz. Admin. Code §§ 18-2-101–1812, Department of Environmental Quality, Air Pollution Control<PROP>Bulk Transmission<PROP>Arizona<PROP>Environment<MANY>Air Quality<SEP>Arkansas – 14 Ark. Code R. §§ 18.101–1501, Arkansas Air Pollution Control Code<PROP>Bulk Transmission<PROP>Arkansas<PROP>Environment<MANY>Air Quality<SEP>Arkansas – Department of Environmental Quality – Construction Storm Water General Permit<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Department of Environmental Quality – Construction Storm Water Notice of Intent<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Department of Environmental Quality – Construction Storm Water Notice of Termination<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Department of Environmental Quality – Large Project SWPPP Template<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Department of Environmental Quality – Small Construction Site Notice of Coverage<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Department of Environmental Quality – Small Project SWPPP Template<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Department of Environmental Quality – ePortal System<PROP>Hydropower<PROP>Arkansas<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Arkansas – Game and Fish Commission – State Wildlife Action Plan<PROP>Hydropower<PROP>Arkansas<PROP>Environment<MANY>Biological Resources<SEP>Army Corps of Engineers - Application for Department of the Army Permit<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Water Quality<SEP>Army Corps of Engineers - Regulatory Guidance Letters<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Army Enhanced Use Lease (EUL) website<PROP>Solar<PROP><PROP>Land Access<SEP>Article IX, Section 8 of Idaho's Constitution<PROP>Geothermal<PROP>Idaho<PROP>Land Use<SEP>Avian Conservation Resources<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Avista Corporation, 93 FERC ¶ 61,116 (2000)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>BLM - Approved Resource Management Plan Amendments/Record of Decision for Solar Energy Development in Six Southwestern States<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>BLM - Federal Land Policy and Management Act of 1976<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>BLM - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the Western United States<PROP>Bulk Transmission<PROP><PROP>Land Use<SEP>BLM - Information on Cultural Resource Use Permits webpage<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>BLM - Instruction Memorandum No. 2009-167<PROP>Geothermal<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Aesthetic Resources<SEP>BLM - Instruction Memorandum No. OC-2012-005<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Aesthetic Resources<SEP>BLM - Paleontological Resource Use Permits webpage<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Geological Resources<SEP>BLM - Sage-Grouse and Sagebrush Conservation webpage<PROP>Bulk Transmission<MANY>Hydropower<PROP><PROP>Environment<MANY>Biological Resources<SEP>BLM - State Protocol Agreement with Nevada<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>BLM Extraordinary Circumstances Checklist<PROP>Geothermal<MANY>Solar<MANY>Wind<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<SEP>BLM Geothermal Guidance Documents Website<PROP>Geothermal<PROP><PROP>Site Considerations<SEP>BLM IM 2011-003<PROP>Solar<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>BLM Instruction Memorandum No. 2010-141<PROP>Solar<PROP><PROP>Land Access<SEP>BLM Instruction Memorandum No. 2011-003<PROP>Solar<PROP><PROP>Land Access<SEP>BLM Instruction Memorandum No. 2011-060<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>BLM Instruction Memorandum No. 2011-061<PROP>Solar<PROP><PROP>Land Access<SEP>BLM Instruction Memorandum No. 2011-181<PROP>Solar<PROP><PROP>Land Access<SEP>BLM Interim Competitive Procedures for SEZs<PROP>Solar<PROP>US Federal<PROP>Site Considerations<SEP>BLM Manual 2803: Qualifications for Holding FLPMA Grants<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>BLM Manual 2804: Applying for FLPMA Grants<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>BLM Manual 2805: Terms and Conditions for FLPMA Grants<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>BLM Manual 8110 - Identifying and Evaluating Cultural Resources<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>BLM Manual 8120 - Tribal Consultation Under Cultural Resources<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>BLM Manual 8140 - Protecting Cultural Resources<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>BLM Manual 8270 - General Procedural Guidance for Paleontological Resource Management<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>BLM ROW Grant Template<PROP>Solar<PROP>US Federal<PROP>Site Considerations<SEP>BLM/DOI - Notice of Intent to Conduct Geothermal Resource Exploration Operations<PROP>Geothermal<PROP>US Federal<PROP>Exploration<SEP>BLM/FS Geothermal MOU<PROP>Geothermal<PROP>US Federal<PROP>Land Access<MANY>Exploration<SEP>BOR NEPA Handbook<PROP>Hydropower<PROP>US Federal<PROP>Environment<SEP>Bald and Golden Eagle Protection Act<PROP><PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Barkley v. Wilcox, 86 N.Y. 140, 146-47 (N.Y. 1881)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>Boynton v. Gilman, 53 Vt. 17 (1880)<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>British Columbia - Environmental Assessment Office’s Guidelines for Preparing a Project Description<PROP><PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia Environmental Assessment Office User Guide<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<SEP>British Columbia Environmental Assessment Office’s Project Information and Collaboration System Website (e-PIC)<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia First Nations Environmental Assessment Technical Working Group’s Website<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia Ministry of Forests, Lands and Natural Resources Operations – Land Use Operation Policy<PROP>Bulk Transmission<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation and Infrastructure – Crown Land Tenure Webpage<PROP>Bulk Transmission<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation – FAQ Webpage<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation – Online Application Portal<PROP>Buildings<MANY>Bulk Transmission<MANY>Utilities<MANY>Water<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation – Permit Approval Process Webpage<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation – Provincial Public Highway Permit Application<PROP>Buildings<MANY>Bulk Transmission<MANY>Utilities<MANY>Water<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation – Utility Policy Manual<PROP>Buildings<MANY>Bulk Transmission<MANY>Utilities<MANY>Water<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Ministry of Transportation – Work Notification/Lane Closure Request and Approval Form<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>British Columbia Regulation 370/2002, Reviewable Projects Regulation<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia Utilities Commission – A Participant’s Guide to the BCUC<PROP>Bulk Transmission<PROP>British Columbia<PROP>Transmission Siting & Interconnection<SEP>British Columbia Utilities Commission – Letter No. L-18-09<PROP>Bulk Transmission<PROP>British Columbia<PROP>Transmission Siting & Interconnection<SEP>British Columbia Utilities Commission – Order G-15-19<PROP>Bulk Transmission<PROP>British Columbia<PROP>Transmission Siting & Interconnection<SEP>British Columbia Utilities Commission – Order G-20-15<PROP>Bulk Transmission<PROP>British Columbia<PROP>Transmission Siting & Interconnection<SEP>British Columbia – Administrative Tribunals Act, S.B.C. 2004, c. 45<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>British Columbia – Clean Energy Act, S.B.C. 2010, c. 22<PROP>Bulk Transmission<PROP>British Columbia<PROP>Transmission Siting & Interconnection<SEP>British Columbia – Crown Land Tenure Application<PROP>Bulk Transmission<PROP>British Columbia<PROP>Land Access<SEP>British Columbia – Environmental Assessment Act, R.S.B.C. 2002, c. 43<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia – Environmental Assessment Office Guide: Requesting a Certificate Exemption Under Section 10(1)(b)<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia – Environmental Assessment Office User Guide: An Overview of Environmental Assessment in British Columbia<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia – Judicial Review Procedure Act, R.S.B.C. 1996, c. 241<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>British Columbia – Land Act, RSBC 1997, c. 245<PROP>Bulk Transmission<PROP>British Columbia<PROP>Land Access<SEP>British Columbia – Local Government Act, R.S.B.C. 2015, c. 1<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>British Columbia – Technical Circular T-03/14 Update to the Ministry of Transportation and Highways Utility Policy Manual<PROP>Bulk Transmission<PROP>British Columbia<PROP>Land Access<SEP>British Columbia – The Environmental Assessment Act and Associated Regulations Webpage<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>British Columbia – Utilities Commission Act, R.S.B.C. 1996, c. 473<PROP>Bulk Transmission<PROP>British Columbia<PROP>Transmission Siting & Interconnection<SEP>British Columbia –Transportation Act, S.B.C. 2004, c. 44<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>British Columbia<PROP>Land Access<SEP>Bromberg v. Ellish, Inc., 64 A.D.2d 684, 685 (N.Y. App. Div. 1978)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>Brun-Way Highway Operations Inc. Webpage<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>Brun-Way Highway Operations Inc. – Highway Usage Permit Application<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>Bureau of Indian Affairs - Northwest Regional Office Webpage<PROP>Hydropower<PROP><PROP>Power Plant<SEP>Bureau of Indian Affairs - Procedural Handbook for Grants of Easement for Right-of-Way on Indian Lands<PROP>Buildings<MANY>Bulk Transmission<PROP><PROP>Land Access<SEP>Bureau of Indian Affairs Contact Information Website<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Bureau of Indian Affairs Tribal Directory<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Bureau of Indian Affairs – Rights-of-Way on Indian Lands Handbook<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Bureau of Land Management - 4.0 Chapter 4 - Environmental Effects<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Bird Species of Conservation Concern List<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Biological Resources<SEP>Bureau of Land Management - E-Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Examples of Decision Records<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Examples of FONSIs<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Examples of Non-LUP Prep Plan or EIS Prep Plan<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Examples of Scoping Reports<PROP>Geothermal<PROP>US Federal<PROP>Exploration<SEP>Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the Western United States<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Instruction Memorandum Regarding Collecting Paleontological Resources under the Paleological Resources Preservation Act of 2009 (IM 2012-140)<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP><PROP>Environment<MANY>Geological Resources<SEP>Bureau of Land Management - Land Use Planning<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP><PROP>Land Use<SEP>Bureau of Land Management - Land Use Planning Handbook<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<MANY>Buildings<MANY>Hydrogen<MANY>Smart Grid<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Land Use Planning Handbook (H-1601-1)<PROP>Geothermal<MANY>Smart Grid<MANY>Hydropower<PROP><PROP>Land Use<SEP>Bureau of Land Management - Land Use Planning Process Steps<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<PROP><PROP>Land Access<MANY>Land Use<MANY>Site Considerations<SEP>Bureau of Land Management - Manual Regarding Lands Available for Federal Land and Policy Management Act Grants<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>Bureau of Land Management - NEPA Web Guide<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - National Environmental Policy Act Handbook (H-17890-1)<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP><PROP>Environment<MANY>Land Access<SEP>Bureau of Land Management - National Environmental Policy Act Handbook (H-1790-1)<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - National Environmental Policy Act Website<PROP>Geothermal<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Environment<SEP>Bureau of Land Management - Notice of Intent to Conduct Geothermal Resource Exploration Operations (Form 3200-9)<PROP>Geothermal<PROP><PROP>Exploration<SEP>Bureau of Land Management - Obtaining a Right-of-Way on Public Lands Guidance<PROP>Hydropower<PROP><PROP>Land Access<SEP>Bureau of Land Management - Paleontological Resources Use Permit Application (Form 8270)<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP><PROP>Environment<MANY>Geological Resources<SEP>Bureau of Land Management - Plan of Development Outline for High-Voltage Electric Transmission Lines<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Bureau of Land Management - Plan of Utilization Checklist<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Resource Advisory Council Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Right-of-Way Pre-Application Checklist<PROP>Solar<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Solar and Wind Energy Applications - Pre-Application and Screening Instruction Memorandum ( IM 2011-061)<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>Bureau of Land Management - Sundry Notices and Reports on Wells (Form 3160-5)<PROP>Geothermal<PROP><PROP>Exploration<SEP>Bureau of Land Management - Techniques for Documenting a No Action Alternative in an EA<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - Washington Office Directories<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Bureau of Land Management - West Wide Programmatic Environmental Impact Statement Record of Decision<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Bureau of Land Management and United States Fish and Wildlife Services - Migratory Bird Memorandum of Understanding<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<MANY>Biological Resources<SEP>Bureau of Land Management – Application for Transportation and Utility Systems and Facilities on Federal Lands (SF-299)<PROP>Bulk Transmission<MANY>Solar<MANY>Hydropower<MANY>Geothermal<PROP>US Federal<PROP>Site Considerations<MANY>Land Use<SEP>Bureau of Land Management – Land Right-of-Way Pre-Application Checklist<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Bureau of Land Management – National Environmental Policy Act Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<SEP>Bureau of Reclamation - Directives and Standards Manual<PROP>Hydropower<PROP>US Federal<PROP><SEP>Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act of 2013<PROP>Hydropower<PROP>US Federal<PROP><SEP>Bureau of Reclamation – Official Website<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Bureau ofLand Management - Geothermal Drilling Permit Application (Form 3260-2)<PROP>Geothermal<PROP><PROP>Water Access<SEP>C.R.S. 37 - Water and Irrigation<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-82-101 - Appropriation and Use of Water<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-90 - Underground Water<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-90-103 - Underground Water Definitions Section<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-90-107 - Application for Use of Groundwater<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-90-137 - Permits to Construct Wells Outside Designated Basins<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-90.5-107 Relationship to water - when permit required<PROP>Geothermal<MANY>Water<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-92-102 - Basic Tenets of Colorado Water Law<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-92-301 - Determination and Administration of Water Rights<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-92-302 Applications for Water Rights<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-92-308 - Substitute Water Supply Plans<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>C.R.S. 37-92-602 - Water Rights Exemptions<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>CAPS: Crucial Areas Planning System<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<MANY>Biological Resources<SEP>CCC Federal License and Permit List<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Land Use<MANY>Site Considerations<SEP>CDC DOGGR Forms<PROP>Geothermal<PROP>California<PROP>Land Access<SEP>CDC DOGGR Geothermal Publications<PROP>Geothermal<PROP>California<PROP>Land Access<SEP>CDOT - Permit Standard Provisions Example<PROP>Geothermal<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Access<SEP>CDOT - State Highway Access Permit Application<PROP>Geothermal<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Access<SEP>CDOT Applications and Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>California<PROP>Land Access<SEP>CDOT State Highway Access Permit Application<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>CDOT Utility Accommodation Code Rule 2.2 - Utility Permits and Utility Relocation Permits to the State Highway<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>CDOT-Access Permits Website<PROP>Hydropower<PROP>Colorado<PROP>Land Access<SEP>CDPHE Construction Storm Water Forms<PROP>Geothermal<MANY>Solar<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>CDPHE Construction Storm Water Forms R-Factor Waiver Application<PROP>Smart Grid<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>CDPHE Industrial Individual Wastewater Discharge Permit Application<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>CDWR Well Permitting Forms and Associated Documents<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>CEQA Environmental Review<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Cultural Resources<SEP>CEQA and Historical Resources Technical Assistance<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Cultural Resources<SEP>CERCLA<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>CHAT: Crucial Habitat Assessment Tools<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Arizona<MANY>California<MANY>Colorado<MANY>Idaho<MANY>Kansas<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Mexico<MANY>Oklahoma<MANY>Oregon<MANY>South Dakota<MANY>Utah<MANY>Washington<MANY>Wyoming<PROP>Environment<MANY>Biological Resources<SEP>CO - Floodplain Stormwater and Criteria Manual<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>CPCN Step-by-Step Guide<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Site Considerations<SEP>CPUC General Order 131-D<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>CRS 37-90.5 Geothermal Resources<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>CSLB Forms<PROP>Geothermal<MANY>Solar<MANY>Wind<PROP>Colorado<PROP>Land Access<SEP>CSLB News and Policies<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<PROP>Land Access<SEP>CSLB ROW Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<PROP>Land Access<SEP>CSLC Application Guidelines<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Land Use<MANY>Site Considerations<SEP>CSLC Forms<PROP>Geothermal<PROP>California<PROP>Land Access<SEP>CSLC ROW Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>California<PROP>Transmission Siting & Interconnection<SEP>Cal. Pub. Res. Code<PROP>Geothermal<PROP>California<PROP>Land Access<SEP>California 2020–2025 Nonpoint Source Program Implementation Plan<PROP><PROP>California<PROP>Water Access<SEP>California Building Industry Association et al. v. State Water Resources Control Board<PROP>Geothermal<MANY>Solar<PROP>California<PROP>General Construction<SEP>California Coastal Act<PROP>Solar<PROP>California<PROP>Land Use<SEP>California Coastal Management Program<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Land Use<MANY>Site Considerations<SEP>California Construction Storm Water Program Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>General Construction<SEP>California Department of Fish and Wildlife Consistency Determination Webpage<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Department of Fish and Wildlife Environmental Review and Permitting Webpage<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Department of Fish and Wildlife: Federal Energy Regulatory Commission (FERC) Hydroelectric Projects<PROP>Hydropower<PROP>California<PROP>Environment<SEP>California Desert Native Plants Act<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Endangered Species Act<PROP>Solar<MANY>Hydropower<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Endangered Species Act Species List<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Energy Commission Guidelines, Reports, and Application Forms for the Renewable Energy Program Website<PROP>Hydropower<PROP>California<PROP>Power Plant<SEP>California Energy Commission, Energy Almanac<PROP>Hydropower<PROP>California<PROP><SEP>California Energy Commission, Hydroelectric Power in California<PROP>Hydropower<PROP>California<PROP><SEP>California Energy Commission, Renewables Portfolio Standard Eligibility Guidebook<PROP>Hydropower<PROP>California<PROP>Power Plant<SEP>California Energy Commission-RPS-399 Form<PROP>Hydropower<PROP>California<PROP>Power Plant<SEP>California Environmental Quality Act<PROP>Solar<MANY>Hydropower<MANY>Bulk Transmission<PROP>California<PROP>Land Use<MANY>Land Access<MANY>Environment<MANY>Water Access<SEP>California Fish and Game Code Section 1600 et seq.<PROP>Hydropower<PROP>California<PROP>Water Access<SEP>California Geothermal Permitting Guide<PROP>Geothermal<PROP>California<PROP>Exploration<SEP>California Groundwater Management Plans<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>California Lake and Streambed Alteration Program<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Marine Life Protection Act<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Native Plant Protection Act<PROP>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Natural Community Conservation Plan Act<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>California Nonpoint Source Program Strategy and Implementation Plan, 1998-2013<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>California PRC 25120, Definition for Thermal Powerplant<PROP>Geothermal<PROP>California<PROP>Transmission Siting & Interconnection<SEP>California PRC Section 21065.5, Definitions for Geothermal Exploratory Project<PROP>Geothermal<PROP>California<PROP>Exploration<SEP>California PRC Section 6903, Definitions for Geothermal Resources<PROP>Geothermal<PROP>California<PROP>Water Access<SEP>California Permit Streamlining Act<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Environment<MANY>Land Use Assessment<SEP>California Public Utilities Act<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<MANY>Hydropower<PROP>California<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>California Register<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Cultural Resources<SEP>California State Water Resources Control Board 401 Water Quality Certification Website<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Environment<MANY>Water Quality<SEP>California State Water Resources Control Board Storm Water Homepage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>General Construction<SEP>California Statewide Property Inventory Website<PROP>Solar<PROP>California<PROP>Land Access<SEP>California Trout, Inc. v. FERC, 313 F.3d 1131,1134,1136 (9th Cir. 2002)<PROP><PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>California Waste Discharge Requirements Website<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>California Water Code<PROP>Geothermal<MANY>Water<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>California Water Forms<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>California Water Rights Issues<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Water Access<SEP>California Water Rights Programs<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Water Access<SEP>California Water Well Standards<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>California v. Federal Energy Regulatory Commission 495 U.S. 490 (1990)<PROP>Hydropower<PROP>California<PROP>Water Access<SEP>California – Cal. Code Regs. tit. 13-3, §§ 1–15, Air Resources Board<PROP><PROP>California<PROP><SEP>California – Establishing Transmission Project Review Streamlining Directives<PROP>Bulk Transmission<MANY>Utilities<PROP>California<PROP>Transmission Siting & Interconnection<SEP>Caltrans Encroachment Permit Application Guide<PROP>Bulk Transmission<MANY>Utilities<PROP>California<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Caltrans Transportation Permits Manual<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>General Construction<SEP>Canada - Guide to Preparing a Description of a Designated Project under the Canadian Environmental Assessment Act, 2012<PROP>Bulk Transmission<PROP>British Columbia<PROP>Environment<MANY>On Site Evaluation<SEP>Canada - Indian Act, R.S.C. 1985, c. I-5<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<MANY>Land Use<SEP>Canada – Environmental Assessment Act, S.C. 2012, c. 19<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Canada – Fisheries Act R.S.C. 1985, c. F-14<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canada – Guidelines for Permitting Under Section 73 of the Species at Risk Act<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canada – Indian Act, R.S.C. 1985, c. l-5<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Canada – Indian Referendum Regulations, C.R.C. 2013, c. 957<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Canada – Migratory Birds Convention Act, S.C. 1994, c. 22<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canada – Migratory Birds Regulations, C.R.C., c. 1035<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canada – Species at Risk Act Permit Application<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canada – Species at Risk Act, S.C. 2002, c. 29<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canada – Transportation Act, S.C. 1996, c.10<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Canadian Electricity Association Resources Webpage<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canadian Electricity Association – Bird Beneficial Management Practices Guide for Utilities<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Canadian Transportation Agency – Crossings: A Resource Tool Webpage<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Canadian Wildlife Service Environment Canada – Incidental Take of Migratory Birds in Canada Guidance Document<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Catalog of Waters Important for the Spawning, Rearing or Migration of Anadromous Fishes<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Cave Resources Protection Act of 1988<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP><PROP>Environment<MANY>Geological Resources<SEP>Central Colo. Water Conservancy Dist. v. City and County of Denver (1975)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Certificate of Public Good Application Fee Form<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Chapter 1 of the Wyoming Public Service Commission Regulations: Rules of Practice and Procedure<PROP>Bulk Transmission<PROP>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Chapter 2 of the Wyoming Public Service Commission Regulations: General Regulations<PROP>Bulk Transmission<PROP>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Chapter 9 of the Wyoming Public Service Commission Regulations: General Forms<PROP>Bulk Transmission<PROP>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Chatfield v. Wilson, 31 Vt. 358, 262-63 (1858)<PROP><PROP>Vermont<PROP>Water Access<SEP>Citizen’s Guide to Colorado Water Law<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>City and County of Denver v. Northern Colo. Water Conservancy Dist. (1954)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>City of Tacoma, Washington, 132 FERC ¶ 61,037 (2010)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Clean Air Act<PROP><PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Environment<MANY>On Site Evaluation<MANY>Land Use Assessment<MANY>Air Quality<SEP>Clean Water Act Section 303(d) Webpage<PROP>Geothermal<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Clean Water Act Section 319 Webpage<PROP>Geothermal<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Clean Water Act Section 401 Certification Webpage<PROP>Geothermal<PROP>Idaho<PROP><SEP>Clean Water Act Section 401 Water Quality Certification A Water Quality Protection Tool for States and Tribes<PROP>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Clean Water Act Section 401 Water Quality Certification: A Water Quality Protection Tool for States and Tribes<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Clean Water Act, 33 U.S.C. §§ 1251-1387<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<MANY>Solar<PROP><PROP>Environment<MANY>Water Quality<SEP>Coastal Barrier Resources Act<PROP><PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Coastal Boundary Map (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Coastal Zone Management Act<PROP><PROP>US Federal<PROP>Land Access<MANY>Environment<MANY>Land Use Assessment<MANY>Water Quality<SEP>Coastal Zone Management Act, 16 U.S.C. §§ 1451-1465<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Colo. Const. Art. XVI, Section 6 - Diverting Unappropriated Water<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Colo. River Water Conservation Dist. v. City and County of Denver (1982)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado - Access Permit Application File Review Checklist<PROP>Geothermal<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Access<SEP>Colorado - Access Permit Pre-Design Checklist<PROP>Geothermal<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Access<SEP>Colorado - C.R.S. 24-38.5-101<PROP>Buildings<MANY>Utilities<PROP>Colorado<PROP>Site Considerations<MANY>Power Plant<SEP>Colorado - C.R.S. 24-65.1 - 108<PROP>Utilities<PROP>Colorado<PROP>Transmission Siting & Interconnection<SEP>Colorado - C.R.S. 40-3-104<PROP>Utilities<PROP>Colorado<PROP>Transmission Siting & Interconnection<SEP>Colorado - Report of the Task Force on Statewide Transmission Siting and Permitting<PROP>Bulk Transmission<PROP>Colorado<PROP>Site Considerations<SEP>Colorado - State Highway Access Code<PROP>Geothermal<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Access<SEP>Colorado 2012 Nonpoint Source Management Plan<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Air Pollutant Emission Notice (APEN) Form<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Air Quality<SEP>Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs)<PROP>Geothermal<PROP>Colorado<PROP>Environment<MANY>Air Quality<SEP>Colorado Application for Review of Plans and Specifications for the Alteration, Modification, or Repair of a Dam or Reservoir<PROP>Hydropower<PROP>Colorado<PROP>General Construction<MANY>Power Plant<SEP>Colorado Application for Review of Plans and Specifications for the Construction or Enlargement of a Dam and Reservoir<PROP>Hydropower<PROP>Colorado<PROP>General Construction<MANY>Power Plant<SEP>Colorado Application for a Change of Water Right<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado Application for an Alternate Point of Diversion<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado Attachment to Policy 2003-2, General Guidelines for Substitute Water Supply Plans Submitted to the State Engineer<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado Board of Land Commissioner: Request for Review<PROP>Hydropower<PROP>Colorado<PROP>General Construction<MANY>Power Plant<SEP>Colorado Compliance Bulletin Solid Waste Certificate of Designation<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado Constitution<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado Construction Air Permit Application<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<PROP>Colorado<PROP>Environment<MANY>Air Quality<SEP>Colorado Construction Dewatering General Permit<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Construction Dewatering General Permit Application<PROP>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Department of Health & Environment Nonpoint Source Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Department of Local Affairs<PROP>Utilities<MANY>Bulk Transmission<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>General Construction<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Colorado Department of Natural Resources Guide to Colorado Well Permits, Water Rights, and Water Administration<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Colorado Department of Public Health and Environment – Air Pollutant Emission Notice/Permit Exempt Checklist<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Air Quality<SEP>Colorado Department of Public Health and Environment – Air Pollution Control Division Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Air Quality<MANY>Environment<SEP>Colorado Department of Public Health and Environment: Watershed 319 Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Department of Transportation - Utility/Special Use Permit Application<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Land Access<SEP>Colorado Discharge Permit System General Discharge Permit<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Discharge Permit System General Permit<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Division of Water Resources Denver Basin Webpage<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Colorado Division of Water Resources Policy 2010-4<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Colorado Division of Water Resources Substitute Water Supply Plans Webpage<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Colorado Division of Water Resources, Synopsis of Colorado Water Law<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Colorado Energy Office – Hydropower Website<PROP>Hydropower<PROP>Colorado<PROP>Power Plant<SEP>Colorado Energy Office, Hydropower<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado Energy Office, Small Hydropower Handbook<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado Energy Office: Colorado Small Hydropower Handbook<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado General APEN Notice and Application for Construction Permit – Form APCD-200<PROP>Hydropower<PROP>Colorado<PROP>General Construction<MANY>Environment<MANY>Air Quality<SEP>Colorado General Permit for Construction Dewatering Activities Frequently Asked Questions<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Hazardous Waste Recycling Guidance<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado Nonpoint Source Website<PROP>Geothermal<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado Oversize Overweight Permitting and Routing Permit System<PROP>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Parks and Wildlife Rules and Regulations<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Biological Resources<SEP>Colorado Policy 2003-2 - Implementation of Section 37-92-308, Regarding Substitute Water Supply Plans<PROP>Water<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Colorado Small Hydro Association<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado Small Hydropower Handbook<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Colorado State Board of Land Commissioners Strategic Plan<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Colorado State Board of Land Commissioners: Temporary Access Permit Application<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Colorado State Land Board Application for Grant of Right-of-Way and Amendment to a Right-of-Way<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Colorado State Land Board Land Survey Requirements<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Colorado State Land Board: Right-of-Way General Information<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Colorado Stormwater Management Plan Preparation Guidance<PROP>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado Water Conservation Board v. City of Central (Co. 2005)<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Colorado Water Court Application Forms<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado Water Courts<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Colorado Water Quality Certification General Information<PROP>Geothermal<MANY>Solar<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Water Quality Control Act<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Water Quality Control Division - 401 Water Quality Certification website<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado Wildlife Commission Policy: Energy Development in Colorado<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Biological Resources<SEP>Colorado – 25-8-403, Administrative Considerations<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado – Air Pollutant Emission Notice/Permit Exempt Checklist<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Air Quality<SEP>Colorado – C.R.S. 37-80-101 et seq., State Engineer<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado – C.R.S. 37-82 et seq., Appropriation and Use of Water<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado – C.R.S. 37-92 et seq., Water Right Determination and Administration Act<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado – C.R.S. 38-30 et seq., Titles and Interests<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Colorado – C.R.S. 42-4-510 (3), Permits for Excess Size and Weight<PROP>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado – C.R.S. 42-4-510, Permits for Excess Size and Weight<PROP>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>General Construction<SEP>Colorado – C.R.S. 43-2-147, Access to Public Highways<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Site Considerations<MANY>Land Access<SEP>Colorado – C.R.S. 8-20-102, Oil and Public Safety Rules<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado – C.R.S. 8-20.5-101 et seq., Petroleum Storage Tanks-Administration<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado – C.R.S. 8-20.5-201 et seq., Underground Storage Tanks<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado – C.R.S. 8-20.5-301 et seq., Aboveground Storage Tanks<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado – C.R.S. 8-20.5-302, Duties of Division of Oil and Public Safety – Aboveground Storage Tanks<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Colorado – C.R.S. § 24-4 et seq., Rule-making and Licensing Procedures by State Agencies<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado – C.R.S. § 37-80 et seq., State Engineer<PROP><PROP>Colorado<PROP>Water Access<SEP>Colorado – C.R.S. § 37-87 et seq., Reservoirs<PROP>Hydropower<PROP>Colorado<PROP><SEP>Colorado – CRS § 25-8-103, Colorado Water Quality Control Act<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Colorado – Colo. Rev. Stat. §§ 37-90.5-101–37-90.5-111, Geothermal Resources<PROP>Geothermal<PROP>Colorado<PROP>Land Use<MANY>Land Access<MANY>Exploration<MANY>Water Access<SEP>Colorado — C.R.S. 40-1-102 - Definitions<PROP>Hydropower<PROP>Colorado<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Colorado-C.R.S. 37-90 et seq., Colorado Groundwater Management Act<PROP><PROP>Colorado<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Congressional Research Service – National Park System: Establishing New Units<PROP>Hydropower<PROP>US Federal<PROP><SEP>Connecticut – Conn. Agencies Regs. §§ 22a-174-1–200, Abatement of Air Pollution<PROP>Bulk Transmission<PROP>Connecticut<PROP>Environment<MANY>Air Quality<SEP>Construction General Permit Fact Sheet<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>General Construction<SEP>Construction and Minor Permit Applications<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Air Quality<SEP>Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>Council on Environmental Quality (CEQ) NEPA Regulations: 40 CFR 1500 - 1518<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<SEP>Council on Environmental Quality - Citizens Guide to the National Environmental Policy Act<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Water Access<MANY>Plant Decommissioning<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Council on Environmental Quality - Emergency Actions and NEPA<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Council on Environmental Quality - Forty Most Asked Questions Concerning CEQ's NEPA Regulations<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Council on Environmental Quality - Guidance for Environmental Assessments of Forest Health Projects<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Council on Environmental Quality - Memorandum for Heads of Federal Departments and Agencies Regarding Emergencies and the National Environmental Policy Act<PROP>Solar<PROP><PROP><SEP>Council on Environmental Quality - Regulations for Implementing the Procedural Provisions of the NEPA<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Council on Environmental Quality - Steps to Modernize and Reinvigorate NEPA Review Report Webpage<PROP><PROP><PROP><SEP>Crown Indigenous Relations and Northern Development Canada – Land Development Webpage<PROP>Bulk Transmission<MANY>Utilities<PROP>Canada Federal<PROP>Land Use<MANY>Land Access<SEP>Crucial Habitat Assessment Tool<PROP>Smart Grid<PROP>US Federal<PROP><SEP>Current Practices of the Department of Water Resources in Supervision of Dams and Reservoirs<PROP>Hydropower<PROP>California<PROP>General Construction<SEP>DEQ Groundwater Permitting Guidebook<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>DEQ UPDES Forms Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>DER-26 How to Prepare a Spill Prevention Report for a Chemical Bulk Storage Facility<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Waste & Hazardous Material<SEP>DOD - Additional Guidance Concerning INRMP Reviews<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>DOD - Preliminary Screening Tool<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>DOD Instruction 4715.03 - Integrated Natural Resources Management Plan (INRMP) Implementation Manual<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>DOE - Geothermal Energy Resources Map - Tribal<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>DOE - Guide to Tribal Clean Energy Development webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>DOI - Archeology and Historic Preservation Standards and Guidelines<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>DOI - Policy on Consultation with Indian Tribes<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>DOI - Tribal Consultation Policy webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>DOI Environmental Justice Strategic Plan<PROP>Hydropower<PROP>US Federal<PROP>Environment<SEP>Dam Safety (New York)<PROP>Hydropower<PROP>New York<PROP>Power Plant<SEP>Dam Safety, Coastal & Flood Protection (New York)<PROP>Hydropower<PROP>New York<PROP>Power Plant<MANY>Environment<MANY>On Site Evaluation<SEP>Delaware Department of Transportation Manual on Traffic Control Devices<PROP>Bulk Transmission<PROP>Delaware<PROP>Land Access<MANY>General Construction<SEP>Delaware – 7-1100 Del. Admin. Code §§ 1101–1150, Division of Air Quality<PROP>Bulk Transmission<PROP>Delaware<PROP>Environment<MANY>Air Quality<SEP>Denver Basin Map<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Department of Crown-Indigenous Relations and Northern Development Canada – Forms-Economic Development Webpage<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Department of Defense - Joint Land Use Study Program Instruction (3030.3)<PROP>Geothermal<MANY>Hydropower<MANY>Solar<PROP><PROP>Environment<MANY>Land Use Assessment<SEP>Department of Defense and Department of the Interior - Renewable Energy Memorandum of Understanding<PROP>Geothermal<MANY>Hydropower<MANY>Solar<MANY>Water<PROP><PROP>Environment<MANY>Land Use Assessment<SEP>Department of Energy - DOE, NEPA and You - A Guide to Public Participation<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Department of Energy - Office of NEPA Policy and Compliance<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Department of Energy and United States Fish and Wildlife Services - Migratory Bird Memorandum of Understanding<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<MANY>Solar<PROP><PROP>Biological Resources<MANY>Environment<SEP>Department of Energy's Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Department of Energy, New Stream-reach Development: A Comprehensive Assessment of Hydropower Energy Potential in the United States<PROP>Hydropower<PROP>US Federal<PROP><SEP>Department of Environment and Climate Change Canada Publications Webpage – Policy When Considering Permitting or Authorizing Prohibited Activities under the Canada Wildlife Act and Migratory Birds Convention Act, 1994<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Department of Environment and Climate Change Canada Webpage – Birds Protected Under the Migratory Birds Convention Act<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Environment<MANY>Biological Resources<SEP>Department of Environmental Conservation (New York) - Sample Wetlands Plans<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Department of Environmental Conservation Stormwater Program Fee Summary<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Department of Environmental Conservation – Freshwater Wetlands Permits (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Department of Environmental Conservation – Regional Permit Administrators (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Department of Environmental Conservation – Tidal Wetlands Permit Program (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Department of Interior - Bureau of Land Management National Environmental Policy Act Departmental Manual<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Buildings<MANY>Bulk Transmission<MANY>Hydrogen<MANY>Smart Grid<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Water Access<MANY>Plant Decommissioning<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Department of State, Office of Planning & Development (New York): Consistency Review<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Department of the Interior - Departmental Manual - 516 DM Chapter 1<PROP>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Hydropower<MANY>Buildings<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Department of the Interior - Strategic Plan 2018-2019<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<SEP>Department of the Interior – Memorandum M-37050<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Biological Resources<SEP>Department of the Interior – Office of Hearings and Appeals IBLA FAQs Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Water Access<MANY>Plant Decommissioning<SEP>Designated Ground Water Basin Map<PROP>Geothermal<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Division of Safety of Dams:About Dam Safety<PROP>Hydropower<PROP>California<PROP>General Construction<SEP>Division of Safety of Dams:Fees<PROP>Hydropower<PROP>California<PROP>General Construction<SEP>Division of Safety of Dams:Forms<PROP>Hydropower<PROP>California<PROP>General Construction<SEP>Division of State Lands - Instructions and Checklist for State Owned Lands Application<PROP>Bulk Transmission<MANY>Utilities<PROP>Nevada<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Division of Water Resources – Office of the State Engineer and the Ground Water Commission, Well Permit Information, Permits Approved Pursuant to CRS 37-90-107(7) (Denver Basin Aquifer Wells Located in Designated Groundwater Basins)<PROP><PROP>Colorado<PROP>Water Access<SEP>Drinking Water and Groundwater Protection Division File Transfer Protocol (FTP) Site Instructions<PROP>Hydropower<PROP>Vermont<PROP><SEP>Durham v. Ingrassia, 105 Misc.2d 191 (N.Y. Misc. 1980)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>EPA - Construction General Permit Fact Sheet<PROP>Bulk Transmission<PROP>US Federal<PROP>General Construction<SEP>EPA - Construction General Permit webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>General Construction<SEP>EPA - Environmental Justice webpage<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Site Considerations<MANY>Environment<SEP>EPA - Ground Water Discharges (EPA's Underground Injection Control Program) webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA - Guidance for Incorporating Environmental Justice Concerns in EPA's NEPA Compliance Analyses<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>EPA - NPDES Electronic Notice of Intent webpage<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA - NPDES Permit Program webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA - NPDES Permit Writers Manual<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA - National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities<PROP>Bulk Transmission<PROP><PROP>General Construction<SEP>EPA - National Remedy Review Board webpage<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA - Permit Applications and Forms webpage<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Water Quality<SEP>EPA - Permit Compliance System webpage<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Water Quality<SEP>EPA - RCRA Orientation Manual 2011: Resource Conservation and Recovery Act<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<MANY>Waste & Hazardous Material<SEP>EPA - Rainfall Erosivity Factor Calculator webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>EPA - Revitalization Handbook<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA - Section 404 Dredge and Fill Permitting webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA - Source Water Protection webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA - State NPDES Program Authority<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Water Quality<SEP>EPA - UIC Well Classifications<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>EPA - Underground Injection Control Classes of Wells webpage<PROP>Geothermal<PROP>US Federal<PROP>Water Quality<MANY>Environment<SEP>EPA 401 Water Quality Certification website<PROP>Geothermal<MANY>Solar<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>EPA Air Pollution and the Clean Air Act Webpage<PROP>Geothermal<PROP>US Federal<PROP>Air Quality<MANY>Environment<SEP>EPA Brownfields and Land Revitalization Website: Basic Information<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA Catalog of Federal Funding Sources for Watershed Protection<PROP>Geothermal<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>EPA Citizens Guide to Hazardous Waste Permitting Process<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>EPA Class V Permitting Authorities Website<PROP>Geothermal<PROP>Montana<PROP>Water Quality<MANY>Environment<SEP>EPA Coastal Zone Act Reauthorization Amendments (CZARA) Section 6217 Webpage<PROP><PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>EPA EPCRA Section 304 Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA Handbook on 401 Water Quality Certifications<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP><PROP>Environment<MANY>Water Quality<SEP>EPA Hazardous Waste Generators Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA Hazardous Waste TSDF Guide<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>EPA National Environmental Policy Act Guidance<PROP><PROP>US Federal<PROP><SEP>EPA Plain English Guide to the Clean Air Act<PROP>Geothermal<MANY>Hydropower<PROP><PROP>Environment<MANY>Air Quality<SEP>EPA Rainfall Erosivity Factor Calculator Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>General Construction<SEP>EPA Region 6 NPDES General Permits<PROP>Geothermal<PROP><PROP>Water Quality<MANY>Environment<SEP>EPA Region 7 Air Program Website<PROP>Geothermal<PROP><PROP>Environment<MANY>Air Quality<SEP>EPA Regulations Overview Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA SPCC webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA State Manifest Requirements<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>EPA Tier2 Submit Software Webpage<PROP>Geothermal<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>EPA's Clean Water Act Section 319 Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>EPA's Hawaii NPS Program Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>EPA’s Brownfields Application Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Waste & Hazardous Material<MANY>Environment<SEP>ESA Forms<PROP>Geothermal<MANY>Solar<MANY>Hydropower<MANY>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP>Biological Resources<MANY>Environment<SEP>ETrans Federal Permitting Transmission Tracking System<PROP>Bulk Transmission<MANY>Utilities<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Eagle Conservation Plan Guidance<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Easement Application for Utility or Public Road<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Edison Electric Institute State Generation and Transmission Siting Directory<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Electric Transmission Siting<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Site Considerations<SEP>Electric Transmission Siting at the California PUC<PROP>Bulk Transmission<MANY>Utilities<PROP>California<PROP>Land Use<MANY>Site Considerations<MANY>General Construction<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Electricity Transmission, A Primer<PROP>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP>Site Considerations<MANY>Transmission Siting & Interconnection<SEP>Enabling Sustainable Geothermal Operations Through Social Impact Assessment<PROP>Geothermal<PROP><PROP><SEP>Endangered Species Act, 16 U.S.C. §§ 1531-1544<PROP><PROP>US Federal<PROP>Land Use<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<SEP>Energy Facility Licensing Process Developer’s Guide<PROP>Solar<PROP>California<PROP>Site Considerations<SEP>Energy Planning and Implementation Guidebook for Vermont Communities<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Energy Policy Act of 2005<PROP><PROP><PROP>Land Access<SEP>Engaging the Public on Geothermal Energy<PROP>Geothermal<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP><SEP>Environmental Impacts of Trasmission Lines<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Geological Resources<MANY>Aesthetic Resources<SEP>Environmental Protection Agency - Clean Water Rule Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP><SEP>Environmental Protection Agency – Nonpoint Source Pollution Website<PROP>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Environmental Protection Agency: Handbook for Developing Watershed Plans to Restore and Protect Our Waters<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>Environmental Recommendations for Transmission Planning<PROP>Bulk Transmission<PROP>Arizona<MANY>California<MANY>Colorado<MANY>Idaho<MANY>Montana<MANY>Nevada<MANY>New Mexico<MANY>Oregon<MANY>Washington<MANY>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<SEP>Erie Boulevard Hydropower, L.P., 100 FERC ¶ 61,321 (2002)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Escondido Water Co., v. La Jolla Indians et al., 466 U.S. 765 (1984)<PROP>Hydropower<PROP>US Federal<PROP><SEP>Example USFS Preliminary Section 4(e) Report<PROP>Hydropower<PROP>US Federal<PROP><SEP>Executive Order 11988 - Floodplain Management<PROP>Buildings<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<SEP>Executive Order 13007 - Indian Sacred Sites<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>Executive Order 13175 - Consultation and Coordination with Indian Tribal Governments<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>Executive Order 13186: Responsibilities of Federal Agencies to Protect Birds<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Executive Order 13778– Restoring the Rule of Law, Federalism, and Economic Growth by Reviewing the Waters of the United States Rule<PROP>Geothermal<MANY>Solar<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<MANY>Water Quality<SEP>Executive Order 13807 – Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure (One Federal Decision)<PROP>Geothermal<MANY>Solar<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<SEP>FAA - Obstruction Evaluation/Airport Airspace Analysis (OE-AAA) webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>FAA Airport Categories Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>FAA Form 7460-1: Notice of Proposed Construction or Alteration<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>FAC 04-08, Appendix C<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>FAC 04-08, Appendix D<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>FEMA - Executive Order 11990 - Protection of Wetlands 1977<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>FEMA - Executive Order11988 - Floodplain Management 1977<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>FEMA - National Flood Insurance Program Elevation Certificate and Instructions<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Water Quality<MANY>Environment<SEP>FEMA - National Flood Insurance Program webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>FERC - Exemptions from Licensing<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC - How to File a Notice of Intent to Construct a Qualifying Conduit Hydropower Facility<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC - How to Manage Hydropower Exhibits<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC - Hydropower Filing Guide<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC - Managing Hydropower Project Exhibits Guidance Document<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC - Qualifying Conduit Hydropower Facility Process<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC - Tips to Develop a Complete Application<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC Division of Hydropower Administration and Compliance<PROP>Hydropower<PROP>US Federal<PROP><SEP>FERC Handbook for Hydroelectric Filings other than Licenses and Exemptions<PROP>Hydropower<PROP><PROP>Power Plant<SEP>FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from Licensing<PROP>Hydropower<PROP><PROP>Power Plant<SEP>FERC How to Surrender a License or Exemption<PROP>Hydropower<PROP>US Federal<PROP>Plant Decommissioning<SEP>FERC Hydroelectric Project Handbook for Filings other than Licenses and Exemptions<PROP>Hydropower<PROP>US Federal<PROP>Plant Decommissioning<SEP>FERC Hydropower Licensing Guidelines webpage<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC Hydropower Licensing and Endangered Species - A Guide for Applicants, Contractors, and Staff<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Environment<MANY>Biological Resources<SEP>FERC Licensing Processes Matrix<PROP>Water<PROP>US Federal<PROP><SEP>FERC List of Comprehensive Plans<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC Online eLibrary<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC Order No. 2003 - Final Rule<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<MANY>Bulk Transmission<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 2003 Appendix 1 - Interconnection Request<PROP>Buildings<MANY>Geothermal<MANY>Hydrogen<MANY>Solar<MANY>Wind<MANY>Bulk Transmission<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement<PROP>Geothermal<MANY>Solar<MANY>Wind<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 2003 Appendix 3 - System Impact Study Agreement<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 2003 Appendix 4 - Facilities Study Agreement<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 2003 Appendix 5 - Optional Interconnection Study Agreement<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 2003 Appendix 6 - Large Generator Interconnection Agreement<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 792<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 792 - Appendix C<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 792 - Interconnection Agreement<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Order No. 792 - Interconnection Request<PROP>Buildings<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>FERC Small, Low-Impact Hydropower Projects Webpage<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FERC Small/Low Impact Hydropower Program Website<PROP>Hydropower<PROP>US Federal<PROP><SEP>FERC – eFiling Web Page<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FSH 1909.15 - National Environmental Policy Act Handbook: Chapter 10, Environmental Analysis<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<SEP>FSH 1909.15 - National Environmental Policy Act Handbook: Chapter 20, Environmental Impact Statements and Related Documents<PROP>Bulk Transmission<MANY>Solar<PROP>US Federal<PROP>Environment<SEP>FSH 1909.15 - National Environmental Policy Act Handbook: Chapter 30, Categorical Exclusion from Documentation<PROP>Bulk Transmission<MANY>Solar<PROP>US Federal<PROP>Environment<SEP>FSH 1909.15 - National Environmental Policy Act Handbook: Chapter 40, Environmental Assessments and Related Documents<PROP>Bulk Transmission<MANY>Solar<PROP>US Federal<PROP>Environment<SEP>FSH 1909.15 - National Environmental Policy Act Handbook: Chapter Zero Code<PROP>Bulk Transmission<MANY>Solar<PROP>US Federal<PROP>Environment<SEP>FSM 2300 Recreation, Wilderness, and Related Resource Management<PROP>Hydropower<PROP>US Federal<PROP><SEP>FSM 2500 Watershed and Air Management<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Power Plant<SEP>FSM 2600 Wildlife, Fish, and Sensitive Plan Habitat Management<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Power Plant<SEP>FSM 2700, Chapter 2770 Special Uses Management: Federal Power Act Projects<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FSM 7500 Water Storage and Transmission<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Power Plant<SEP>FTP Document Upload Website<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>FWS - Candidate Species List under the Endangered Species Act<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>FWS - Habitat Conservation Plans and Incidental Take Permits webpage<PROP>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>FWS Dam Relicensing Webpage<PROP>Water<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>FWS NEPA Handbook<PROP>Hydropower<PROP>US Federal<PROP>Environment<SEP>FY14 Guidelines for Brownfields Assessment Grants<PROP>Solar<PROP><PROP>Environment<MANY>Waste & Hazardous Material<SEP>FY14 Guidelines for Brownfields Cleanup Grants<PROP>Solar<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>FY14 Guidelines for Brownfields Revolving Loan Fund Grants<PROP>Solar<PROP>US Federal<PROP>Site Considerations<MANY>Environment<MANY>Waste & Hazardous Material<SEP>Fact Sheet - Air Quality Permitting<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Air Quality<SEP>Farmland Mapping and Monitoring Program<PROP>Solar<PROP>California<PROP>Land Use<SEP>Farmland Protection Policy Act<PROP><PROP>US Federal<PROP>Land Use<MANY>Environment<MANY>Land Use Assessment<SEP>Farmland Protection Policy Act Manual<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>Farmland Security Zone<PROP><PROP>California<PROP>Land Use<SEP>Federal Advisory Committee Act of 1972<PROP><PROP>US Federal<PROP>Environment<SEP>Federal Business Opportunities website<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Federal Cave Resources Protection Act<PROP><PROP><PROP>Environment<MANY>Cultural Resources<MANY>Geological Resources<SEP>Federal Consistency Assessment Form (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Federal Energy Administration Act<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Federal Energy Regulatory Commission - Complete List of Active Licenses and Exemptions<PROP>Hydropower<PROP>US Federal<PROP><SEP>Federal Energy Regulatory Commission - Hydropower Project Licenses and Exemptions Interactive Map<PROP><PROP>US Federal<PROP>Site Considerations<MANY>Environment<SEP>Federal Energy Regulatory Commission - Major Orders and Regulations<PROP>Hydropower<PROP><PROP><SEP>Federal Energy Regulatory Commission – FERC Licensing Processes<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Federal Energy Regulatory Commission – Hydropower Primer: A Handbook of Hydropower Basics<PROP>Hydropower<PROP>US Federal<PROP>General Construction<SEP>Federal Energy Regulatory Commission – Matrix Comparing Three Hydropower Licensing Processes<PROP>Hydropower<PROP>US Federal<PROP>General Construction<MANY>Power Plant<SEP>Federal Energy Regulatory Commission – Policy Statement on Establishing License Terms for Hydroelectric Projects Docket No. PL17-3-000<PROP>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Federal Energy Regulatory Commission – Policy Statement on Hydropower Licensing Settlements, Settlements in Hydropower Licensing Proceedings under Part I of the Federal Power Act (Docket No. PL06-5-000)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Federal Energy Regulatory Commission – Policy Statement on Use of Reserved Authority in Hydropower Licenses to Ameliorate Cumulative Impacts (Docket No. RM93-25-000)<PROP>Hydropower<PROP>US Federal<PROP>Site Considerations<MANY>Power Plant<SEP>Federal Energy Regulatory Commission, Division of Hydropower Administration and Compliance - Compliance Handbook<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Federal Highway Admininstration - Law Enforcement Escort - Best Practices Guidelines<PROP>Geothermal<PROP>Nevada<PROP>General Construction<SEP>Federal Highway Administration - Pilot Car Escort - Best Practices Guidelines<PROP>Geothermal<PROP>Nevada<PROP>General Construction<SEP>Federal Land Policy and Management Act of 1976 (FLPMA)<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<SEP>Federal Migratory Bird Depredation Permit 3-200-13<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Federal Power Act, 16 U.S.C. §§ 791a-828c<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Federal Register<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Hydrogen<MANY>Smart Grid<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Water Access<MANY>Plant Decommissioning<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Federal Register - Document Drafting Handbook<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>File FTP Document Upload Website<PROP>Hydropower<PROP>Vermont<PROP><SEP>File Transfer Protocol (FTP) Site Instructions<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Fish Habitat Regulations<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>Flood Disaster Protection Act of 1973<PROP><PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Florida Department of Environmental Protection Application for the Use of State Owned Uplands<PROP>Bulk Transmission<PROP>Florida<PROP>Land Access<SEP>Florida Department of Transportation Utility Accommodation Manual (2017)<PROP>Bulk Transmission<PROP>Florida<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>Florida Department of Transportation – Utility Permit Application<PROP>Bulk Transmission<PROP>Florida<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>Florida Power & Light Company, 29 FERC, ¶ 61, 140 at 61, 291-92 (1984)<PROP>Bulk Transmission<PROP>Florida<MANY>US Federal<PROP>Transmission Siting & Interconnection<SEP>Florida – Fla. Admin. Code Ann. r. 62-110.103-107, Exceptions to the Uniform Rules of Procedure<PROP>Bulk Transmission<PROP>Florida<PROP>Environment<MANY>Air Quality<SEP>Florida – Fla. Admin. Code Ann. r. 62-1–62-821, Department of Environmental Protection<PROP>Bulk Transmission<PROP>Florida<PROP>Environment<MANY>Air Quality<SEP>Florida – Fla. Admin. Code Ann. r. 62-1–821, Department of Environmental Protection<PROP>Bulk Transmission<PROP>Florida<PROP>Environment<MANY>Air Quality<SEP>Florida – Fla. Admin. Code. Ann. r. 62-210.100-920, Stationary Sources – General Requirements<PROP>Bulk Transmission<PROP>Florida<PROP>Environment<MANY>Air Quality<SEP>Florida – Fla. Admin. Code. Ann. r. 62-4.001-540, Permits<PROP><PROP>Florida<PROP>Environment<MANY>Air Quality<SEP>Florida – Florida Department of Environmental Protection Application Instruction Guide, Electrical Transmission Lines<PROP>Bulk Transmission<PROP>Florida<PROP>Transmission Siting & Interconnection<SEP>Forest Service Guide to National Forests and Grasslands<PROP>Hydropower<PROP>US Federal<PROP><SEP>Forest Service Handbook 2709.11 - Special Uses Handbook, Chapter 10<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Forest Service Handbook 2709.11 - Special Uses Handbook, Chapter 20<PROP>Bulk Transmission<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Forest Service Handbook 2709.15 - Hydroelectric Handbook<PROP>Hydropower<PROP>US Federal<PROP>Land Access<MANY>Power Plant<SEP>Forest and Rangeland Renewable Resources Planning Act of 1974<PROP>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use<SEP>Form EIA-860<PROP>Solar<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Form EIA-860 Instructions<PROP>Utilities<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Form RW-U: Utilities<PROP>Bulk Transmission<PROP>Arizona<PROP>Land Access<SEP>Freedom of Information Act<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Frequently Asked Questions (FAQs) for Fiscal Year (FY) 14 Brownfields Assessment, Revolving Loan Fund and Cleanup Grants<PROP>Solar<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Frequently Asked Questions Regarding the UPDES General Stormwater Construction Permit<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>General Construction<SEP>Freshwater Wetlands Act (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Freshwater Wetlands Program: A Guide for Applicants (New York)<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>Friends of Sierra Madre v. City of Sierra Madre, 25 Cal. 4th 165 (2000)<PROP>Hydropower<PROP>California<PROP>Environment<SEP>Full Permit Application Handbook<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Fulton Light, Heat, & Power Co. v. New York, 200 N.Y. 400 (N.Y. 1911)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>GIDAP Best Management Practice<PROP>Solar<MANY>Hydropower<PROP>California<PROP>Transmission Siting & Interconnection<SEP>Gateway Operations Limited Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>Gateway Operations Limited – Highway Usage Permit Application<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>Gateway Operations – Highway Usage Permit Application<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>General Permit for Small Municipal Separate Storm Sewer Systems<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>General Service Administration - Guidance on Tribal Consultation Website<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>Generation Interconnection and Deliverability Allocation Procedures<PROP>Solar<MANY>Hydropower<PROP>California<PROP>Transmission Siting & Interconnection<SEP>Georgia – Ga. Code Ann. §§ 12-16-1 et seq., Environmental Policy<PROP>Bulk Transmission<PROP>Georgia<PROP>Environment<SEP>Georgia – Ga. Comp. R. & Regs. 391-3-1-.01–.15, Air Quality Control<PROP>Bulk Transmission<PROP>Georgia<PROP>Environment<MANY>Air Quality<SEP>Geospatial Business Platform<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Site Considerations<SEP>Geothermal Leasing 101: Federal, State and Private Lands<PROP>Geothermal<PROP>California<PROP>Land Access<SEP>Geothermal Regulations in Colorado - Land Ownership is the Key<PROP>Geothermal<PROP>Colorado<PROP>Exploration<MANY>Water Access<SEP>Geothermal Steam Act of 1970, 30 U.S.C. §§ 1002–1028<PROP>Geothermal<PROP>US Federal<PROP><SEP>Glenwood Springs Amendments<PROP><PROP>Colorado<PROP>Land Use<MANY>Site Considerations<SEP>Glenwood Springs Resource Management Plan (1984)<PROP><PROP>Colorado<PROP>Land Use<MANY>Site Considerations<SEP>Glossary of Transmission Grid Integration Terms<PROP>Bulk Transmission<MANY>Smart Grid<MANY>Utilities<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Government of New Brunswick – Duty to Consult Policy<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>Government of Saskatchewan – First Nation and Métis Consultation Policy Framework<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Granger v. City of Canandaigua, 257 N.Y. 126 (N.Y. 1931)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>Greater Sage-Grouse Populations and Energy Development in Wyoming<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Gridlock: A Policy Analysis of Siting and Coordination of Interstate Transmission Line Development in the Upper Midwest<PROP>Bulk Transmission<PROP>Illinois<MANY>Iowa<MANY>Minnesota<MANY>North Dakota<MANY>South Dakota<MANY>Wisconsin<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Ground Water Management District Rules<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Groundwater Quantity Regulation in Vermont: A Path Forward<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Groundwater Withdrawal Permit Application<PROP><PROP>Vermont<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Guide to Colorado Well Permits, Water Rights, and Water Administration<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Guide to Construction and Administration of Dams in Colorado<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Guide to Permitting Electric Transmission Lines in Utah<PROP>Bulk Transmission<PROP>Utah<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>Guide to Permitting Electric Transmission Lines in Wyoming<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Guidelines for Applicants for Energy Facility Site Certificates<PROP>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Guidelines for the Development of Historic Properties Management Plans for FERC Hydroelectric Projects<PROP>Hydropower<PROP>US Federal<PROP>Site Considerations<SEP>Guidelines to Consider for Participating in the Alternative Licensing Process<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>H. R. S. 182 - Reservation and Disposition of Government Mineral Rights<PROP>Geothermal<PROP>Hawaii<PROP>Land Access<MANY>Water Access<SEP>H.A.R. 11-200 - Environmental Impact Statement Rules<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>H.A.R. 11-23 - Underground Injection Control<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>H.A.R. 11-261 - Hazardous Waste Management<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>H.A.R. 11-265 - Hazardous Management: Interim Status Standard for Owners and Operators<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>H.A.R. 11-281 - Underground Storage Tanks<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>H.A.R. 11-46 - Community Noise Control<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Aesthetic Resources<SEP>H.A.R. 11-54 - Water Quality Standards<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>H.A.R. 11-55 - Water Pollution Control<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>H.A.R. 11-60.1 - Air Pollution Control<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Air Quality<SEP>H.A.R. 11-62 - Wastewater Systems<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>H.A.R. 13-171 - Designation and Regulation of Water Management Areas<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>H.A.R. 13-185 - Rules of Practice and Procedure for Geothermal and Cable System Development Permitting<PROP>Geothermal<PROP>Hawaii<PROP>Well Field<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>H.A.R. 13-197 - Hawai`i Historic Places Review Board<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Cultural Resources<SEP>H.A.R. 13-198 - Hawai`i and National Register of Historic Places Programs<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Cultural Resources<SEP>H.R.S. 174 - Water and Land Development<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>HCP Example<PROP>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>HCP Handbook<PROP>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>HDOT Forms<PROP>Geothermal<PROP>Hawaii<PROP>Land Access<SEP>HabiMap<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Wind<MANY>Hydropower<PROP>Arizona<PROP>Environment<MANY>Biological Resources<SEP>Half Moon Bay Land Co. v. Cowell<PROP>Hydropower<PROP>California<PROP>Water Access<SEP>Harvey Land and Cattle Co. v. Southeastern Colo. Water Conservancy Dist. (1981)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Hawaii Administrative Rules Pertaining to Historic Preservation<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Cultural Resources<SEP>Hawaii Air Pollution Control Permits Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Air Quality<SEP>Hawaii Application for Community Noise Permit (DOH Form CNP)<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Aesthetic Resources<SEP>Hawaii Application for Community Noise Variance (DOH Form)<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Aesthetic Resources<SEP>Hawaii Application for Surface Water Use Permit for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N)<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawaii Clean Energy Iniative - Construction Upon a State Highway Permit Packet<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Hawaii<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Hawaii Clean Energy Iniative Use and Occupancy Permit<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Hawaii<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Hawaii Clean Energy Initiative - Transmission Line Approval Permit Packet<PROP>Utilities<MANY>Bulk Transmission<PROP>Hawaii<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Hawaii Clean Energy Initiative Certificate of Public Convenience and Necessity Permit Packet<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Hawaii<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Power Plant<SEP>Hawaii Clean Energy Initiative Permit to Cross or Enter the State Energy Corridor<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Hawaii<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Hawaii Clean Energy Initiative Website<PROP>Geothermal<PROP>Hawaii<PROP><SEP>Hawaii Clean Water Branch Forms Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Commission on Water Resource Management Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawaii Conservation District Use Application (DLNR CDUA Form)<PROP>Geothermal<PROP>Hawaii<PROP>Land Access<SEP>Hawaii DOH Hazardous Waste Section Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hawaii DOH Solid Waste Section Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hawaii Department of Health Clean Air Branch Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Air Quality<SEP>Hawaii Department of Health Underground Storage Tank Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hawaii Department of Health Website<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Department of Health e-Permitting Portal Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii EIS-EA Permit Packet<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Emergency Planning and Community Right-To-Know-Act Chemical Inventory Reporting Permit Packet (Appendix S-10)<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hawaii Guide for Filing Community Noise Permit Applications<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Aesthetic Resources<SEP>Hawaii Guide for Filing Community Noise Variance Applications<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Aesthetic Resources<SEP>Hawaii Guide to the Implementation and Practice of the Hawaii Environmental Policy Act<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Guidelines for NPDES Notice of General Permit Coverage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii HEPCRA Hazardous Chemical Storage and Tier II Reporting Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hawaii HRS 269 Public Utilities Commission<PROP>Geothermal<MANY>Utilities<PROP>Hawaii<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>Hawaii HRS 269-1, Definitions for Public Utilities<PROP>Geothermal<MANY>Utilities<PROP>Hawaii<PROP>Transmission Siting & Interconnection<SEP>Hawaii Habitat Conservation Plans Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Biological Resources<SEP>Hawaii Historic Preservation Permit Packet<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Cultural Resources<SEP>Hawaii Individual Wastewater Management Permit Packet<PROP><PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Information Package for Chemical Inventory Form (HCIF)/Tier II<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hawaii NPDES General Permit Notice of Intent Forms Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii National Pollutant Discharge Elimination System (NPDES) Permit Packet<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Noise Forms and Links Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Aesthetic Resources<SEP>Hawaii Office of Environmental Quality Control Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Permit Application for Solid Waste Management Facility<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Geological Resources<SEP>Hawaii Polluted Runoff Control Program Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Revised Statute 182-6 Exploration<PROP>Geothermal<PROP>Hawaii<PROP>Exploration<SEP>Hawaii Revised Statute 523A-2, Definition of Mineral Resources<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawaii Revised Statutes 174C, State Water Code<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawaii Rules of Appellate Procedure<PROP>Bulk Transmission<PROP>Hawaii<PROP><SEP>Hawaii State Habitat Conservation Plan Permit Brief<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Biological Resources<SEP>Hawaii State Historic Preservation Website<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Cultural Resources<SEP>Hawaii Underground Injection Control Permit Packet<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Underground Injection Control Permitting Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Underground Injection Control Program Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Variance from Pollution Control Permit Packet (Appendix S-13)<PROP>Geothermal<PROP>Hawaii<PROP>Environment<SEP>Hawaii Wastewater Branch Online Application Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Wastewater Branch Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Water Quality Certification Form<PROP>Geothermal<PROP>Hawaii<PROP>Environment<MANY>Water Quality<SEP>Hawaii Well Abandonment Report Form (DLNR Form WAR)<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawaii Well Construction & Pump Installation Standards<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawaii Well Construction & Pump Installation Standards Webpage<PROP>Geothermal<PROP>Hawaii<PROP>Water Access<SEP>Hawley v. Sheldon, 64 Vt. 491, 493-94 (1892)<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Hazardous Waste Facility Permit Fact Sheet<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hazardous Waste Generator Treatment Permit by Rule<PROP>Geothermal<MANY>Solar<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hazardous Waste Part A Permit Application<PROP>Geothermal<MANY>Solar<MANY>Water<PROP>Nevada<MANY>New Mexico<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Hazardous Waste Treatment, Storage and Disposal Facilities (TSDF) Guidance<PROP>Geothermal<MANY>Solar<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Healthy Forests Restoration Act of 2003<PROP><PROP>US Federal<PROP>Environment<SEP>Highway Usage Regulation – Highway Act, N.B. Reg. 2010-55<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>Highway Usage Regulation – New Brunswick Highway Corporation Act, N.B. Reg. 2009-156<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>Highway Work Permit Application for Non-Utility Work (Form PERM 33)<PROP>Hydropower<PROP>New York<PROP><SEP>History Colorado - Review and Compliance Webpage<PROP>Hydropower<PROP>Colorado<PROP>Site Considerations<SEP>History Colorado: Colorado State Register of Historic Properties Webpage<PROP>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Site Considerations<SEP>History Colorado: Consultation Guidance<PROP>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Site Considerations<SEP>History Colorado: National and State Register Listed Properties Webpage<PROP>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Site Considerations<SEP>Hydropower Licensing and Endangered Species A Guide for Applicants, Contractors, and Staff<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Environment<MANY>Biological Resources<SEP>Hydropower Regulatory Efficiency Act of 2013<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Hydropower in Alaska and Fish and Game, Monte Miller, Alaska Fish & Wildlife News<PROP>Hydropower<PROP>Alaska<PROP>Environment<MANY>Biological Resources<SEP>I.C. 42-108 - Change in Point of Diversion, Place of Use, Period of Use, or Nature of Use<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>I.C. 42-203A - Notice Upon Receipt of Application to Appropriate<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>I.C. 42-217 - Proof of Application (of Water) to Beneficial Use<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>I.C. 42-221 - Appropriation of Water Fees<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>I.C. 42-222 - Appeals -- Change in Point of Diversion, Place of Use, Period of Use, or Nature of Use<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>IC 42-104 - Appropriation (of Water) Must be for Beneficial Purpose<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho - Access Management: Standards and Procedures for Highway Right-of-Way Encroachments<PROP>Geothermal<MANY>Bulk Transmission<PROP>Idaho<PROP>Land Access<SEP>Idaho - Idaho Dept. of Lands - Application for Easement<PROP>Geothermal<MANY>Bulk Transmission<PROP>Idaho<PROP>Land Access<SEP>Idaho Administrator's Memorandum on Transfer Processing Policies and Procedures<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Application for Permit to Alter Geothermal Well Form (4003-2)<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Application for Permit to Construct Modify or Maintain an Injection Well - Form 42-39-1<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Application for Permit to Convert a Geothermal Injection Well - Form 4003-3<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Application for Permit to Drill for Geothermal Resources (Form 4003-1)<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Application for Water Permit (DWR Form 202)<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Clean Water Act Section 401 Certification Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho DEQ Air Quality Permits Applicant and DEQ Responsibilities guidebook<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>Air Quality<SEP>Idaho DEQ Environmental Assessment Information<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Idaho DEQ Nonpoint Source Pollution Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho DEQ Pre-Application Meeting Agenda<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Air Quality<SEP>Idaho DEQ Storage Tanks Webpage<PROP>Geothermal<PROP>Idaho<PROP>Environment<SEP>Idaho DEQ Waste Management and Permitting Webpage<PROP>Geothermal<PROP>Indiana<PROP>Environment<SEP>Idaho Dredge and Fill Permits Webpage<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho Geothermal Resources Webpage<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Geothermal Surety Bond Form 4005<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho How to Obtain EPA ID Number Webpage<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Idaho IC 42-4002, Geothermal Resources Act Definitions<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Instruction for Filing a Request for Extension of Time to Submit Proof of Beneficial Use<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Instructions for Filing Proof of Beneficial Use<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Instructions for Filing an Application for Permit to Appropriate<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho NPDES Permits Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho Notice of Intent to Abandon a Well (DWR Form 4007)<PROP>Geothermal<PROP>Idaho<PROP>Well Field<SEP>Idaho On-Site Wastewater Systems Webpage<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Idaho Permit to Construct Application Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>Air Quality<SEP>Idaho Report of Abandonment of a Well (DWR Form 4009)<PROP>Geothermal<PROP>Idaho<PROP>Well Field<SEP>Idaho Request for Extension of Time to Submit Proof of Beneficial Use (DWR Form 204)<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Right-of-Way Encroachment Application and Permit - Other Encroachments<PROP>Bulk Transmission<MANY>Geothermal<PROP>Idaho<PROP>Land Access<SEP>Idaho Right-of-Way Encroachment Application and Permit for Utilities<PROP>Bulk Transmission<MANY>Geothermal<MANY>Utilities<PROP>Idaho<PROP>Land Access<SEP>Idaho Rules of Civil Procedure<PROP>Bulk Transmission<PROP>Idaho<PROP>Site Considerations<SEP>Idaho Section 319 Grant Application<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Section 401 Certification Guidance<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho Solid Waste Webpage<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Idaho State Historic Preservation Office Website<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho State Historical Society Website<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Statement of Completion for Submitting Proof of Beneficial Use (DWR Form 217)<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho TMDL Settlement Agreement<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho Transferring a Water Right Webpage<PROP>Geothermal<PROP>Idaho<PROP>Water Access<SEP>Idaho Underground Injection Control Program Webpage<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Water Quality<SEP>Idaho Water Right Applications, Forms, and Fees Webpage<PROP>Water<PROP>Idaho<PROP>Water Access<SEP>Idaho Water Rights as They Pertain to Drilling Slideshow<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Watershed Advisory Groups Webpage<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho Well Construction and Drilling Forms Webpage<PROP>Geothermal<PROP>Idaho<PROP><SEP>Idaho – Idaho Admin. Code r. 58.01.01.000–999, Rules for the Control of Air Pollution in Idaho<PROP>Bulk Transmission<PROP>Idaho<PROP>Environment<MANY>Air Quality<SEP>Idaho – Idaho Appellate Rules<PROP>Bulk Transmission<PROP>Idaho<PROP>Site Considerations<SEP>Idaho – Idaho Code §§ 67-6501–67-6539, Local Land Use Planning<PROP>Bulk Transmission<MANY>Geothermal<PROP>Idaho<PROP>Land Use<SEP>Ike Skelton Defense Authorization Act<PROP>Buildings<MANY>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP><SEP>Illinois Department of Transportation District Project Contact Page<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Illinois Department of Transportation Website – Utility Permits<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Illinois Department of Transportation – District Map<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Illinois Department of Transportation – Highway Utility Permit Application<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Illinois Local Land Use Management Planning Act (50 I.L.C.S. §§ 805 et seq.)<PROP>Bulk Transmission<PROP>Illinois<PROP>Land Use<SEP>Illinois Public Utilities Act (220 I.L.C.S §§ 5 et seq.)<PROP>Bulk Transmission<PROP><PROP>Transmission Siting & Interconnection<SEP>Illinois – Department of Natural Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>Illinois<PROP>Environment<MANY>Biological Resources<SEP>Illinois – Department of Transportation – Automated Permit System<PROP>Hydropower<PROP>Illinois<PROP>General Construction<SEP>Illinois – Department of Transportation – OPER 993 Special Vehicle Movement Permit Provisions<PROP>Hydropower<PROP>Illinois<PROP>General Construction<SEP>Illinois – Environmental Protection Agency – Construction Storm Water General Permit<PROP>Hydropower<PROP>Illinois<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Illinois – Environmental Protection Agency – Construction Storm Water Login Page<PROP>Hydropower<PROP>Illinois<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Illinois – Environmental Protection Agency – Construction Storm Water Notice of Intent<PROP>Hydropower<PROP>Illinois<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Illinois – Environmental Protection Agency – Construction Storm Water Notice of Termination<PROP>Hydropower<PROP>Illinois<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Illinois – Environmental Protection Agency – Joint Application Form<PROP>Hydropower<PROP>Illinois<PROP>Environment<MANY>Water Quality<SEP>Illinois – Environmental Protection Agency – Joint Application Form Instructions<PROP>Hydropower<PROP>Illinois<PROP>Environment<MANY>Water Quality<SEP>Illinois – Environmental Protection Agency – NPDES Permit for Construction Activities Webpage<PROP>Hydropower<PROP>Illinois<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Illinois – Ill. Admin. Code tit. 35 § 201–291, Air Pollution<PROP>Bulk Transmission<PROP>Illinois<PROP>Environment<MANY>Air Quality<SEP>Illinois – State Property Control Act (30 I.L.C.S. §§ 605 et seq.)<PROP>Bulk Transmission<PROP>Illinois<PROP>Land Access<SEP>In Re Application for Water Rights of Park County Sportsmen's Ranch, LLP v. Bargas, 986 P.2d 262 (Colo. 1999)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Incidental Take Permits Associated with a Habitat Conservation Plan Form 3-200-56<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Independent Electricity System Operator – Expedited System Impact Assessment Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Transmission Siting & Interconnection<SEP>Independent Electricity System Operator – Market Rules and Manuals Library<PROP>Bulk Transmission<PROP>Ontario<PROP>Transmission Siting & Interconnection<SEP>Independent Electricity System Operator – Obtaining a Connection Assessment Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Transmission Siting & Interconnection<SEP>Independent Electricity System Operator – Registration Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Transmission Siting & Interconnection<SEP>Independent Electricity System Operator – Technical Feasibility Study Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Transmission Siting & Interconnection<SEP>Indian Land Consolidation Act, 25 U.S.C. §§ 2201-2221<PROP>Bulk Transmission<PROP>US Federal<PROP><SEP>Indiana Department of Environmental Management Forms Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management NonRule Policy Document – Water -011-NPD<PROP>Hydropower<PROP><PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – 401 Water Quality Certification, Early Coordination Webpage<PROP>Hydrogen<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – 401 Water Quality Certification, Frequently Asked Questions Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – 401 Water Quality Certification, Terms and Conditions of the IDEM Regional General Permit Notification Form Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Air Quality<SEP>Indiana Department of Environmental Management – Construction Storm Water Permit, Guidance on Completing the NOI Form Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – Construction Storm Water Permit, Individual Storm Water Permit Requirements Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – Construction Storm Water Permit, Permit Length Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – Construction Storm Water Permit, Step-by-Step Process for Compliance Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Environmental Management – Storm Water Permitting, Applicability Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Natural Resources, What We Do Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<SEP>Indiana Department of Revenue – Motor Carrier Services Website<PROP>Hydropower<PROP>Indiana<PROP>Land Access<MANY>General Construction<SEP>Indiana Department of Revenue – Ordering an Oversize-Overweight Permit Webpage<PROP>Hydropower<PROP>Indiana<PROP>Environment<MANY>Water Quality<SEP>Indiana Department of Revenue – Oversize-Overweight Transporting Company Agreement (Form M-203)<PROP>Hydropower<PROP>Indiana<PROP>General Construction<SEP>Indiana Department of Revenue – Oversize-Overweight Vehicle Permitting Handbook<PROP>Hydropower<PROP>Indiana<PROP>General Construction<SEP>Indiana Department of Revenue- Oversize-Overweight Vehicle Permit Application (Form M-233)<PROP>Hydropower<PROP>Indiana<PROP>General Construction<SEP>Indiana – Department of Administration – Easement Policy Statement<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Natural Resources – Easement Policy Statement<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Transportation – EPS Login Page<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Transportation – EPS User Manual<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Transportation – Permits Webpage<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Transportation – Right-of-Way Permit Application<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Transportation – Right-of-Way Permit Special Provisions<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana – Department of Transportation – Utility Accommodation Policy<PROP>Bulk Transmission<PROP>Indiana<PROP>Land Access<SEP>Indiana –326 Ind. Admin. Code 1–26, Air Pollution Control Division<PROP>Bulk Transmission<PROP>Indiana<PROP>Environment<MANY>Air Quality<SEP>Indigenous and Northern Affairs Canada Land Management Manual<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Use<MANY>Land Access<SEP>Indigenous and Northern Affairs Canada – Locatee Lease Policy and Directive Webpage<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Indigenous and Northern Affairs Canada – Locatee Lease and Policy Directive Webpage<PROP>Bulk Transmission<PROP>Canada Federal<PROP>Land Access<SEP>Information, Planning, and Conservation (IPAC) online screening tool<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Inside Idaho: Interactive Numeric and Spatial Information Data Engine<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Idaho<PROP>Environment<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Geological Resources<SEP>Institute of Transportation Engineers Trip Generation Handbook<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>Integrated HCP/EA Example<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Environment<MANY>Biological Resources<SEP>Interagency Task Force Report on Agency Recommendations, Conditions, and Prescriptions Under Part I of the Federal Power Act<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Interagency Task Force on Improving Hydroelectric Licensing Processes – Guidelines to Consider for Participating in the Alternative Licensing Process<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Environment<MANY>Water Access<SEP>Interagency Wild and Scenic Rivers Coordinating Council's WSRA Section 7(a) Flowcharts<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Aesthetic Resources<SEP>Interim Guidance Regarding Limitations on CERCLA Liability<PROP>Solar<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>International Fire Code<PROP>Hydropower<PROP>Alaska<PROP>Power Plant<SEP>Interstate Strategies for Transmission Planning and Expansion<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>Interstate Transmission Challenges for Renewable Energy: A Federalism Mismatch<PROP>Bulk Transmission<MANY>Smart Grid<MANY>Solar<MANY>Wind<PROP>California<MANY>Iowa<MANY>Minnesota<MANY>North Dakota<MANY>Oregon<MANY>Texas<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>Introduction to Coast Guard Bridge Permitting<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP><PROP>Land Use Assessment<MANY>Environment<SEP>Iowa - Department of Natural Resources - Environmental Review for Natural Resources Website<PROP>Bulk Transmission<PROP>Iowa<PROP>Environment<MANY>Biological Resources<SEP>Iowa – Department of Natural Resources - Joint Application Form<PROP>Bulk Transmission<PROP>Iowa<PROP>Land Access<SEP>Iowa – Department of Natural Resources – Construction Storm Water General Permit<PROP>Hydropower<PROP>Iowa<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Iowa – Department of Natural Resources – Construction Storm Water Notice of Intent<PROP>Hydropower<PROP>Iowa<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Iowa – Department of Natural Resources – Notice of Discontinuation<PROP>Hydropower<PROP>Iowa<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Iowa – Department of Natural Resources – Online Construction Storm Water Notice of Intent<PROP>Hydropower<PROP>Iowa<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Iowa – Department of Natural Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>Iowa<PROP>Environment<MANY>Biological Resources<SEP>Iowa – Department of Natural Resources – Storm Water Management for Construction Activities Summary Guidance<PROP>Hydropower<PROP>Iowa<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Iowa – Department of Natural Resources – USACE Joint Application Form<PROP>Hydropower<PROP>Iowa<PROP>Environment<MANY>Water Quality<SEP>Iowa – Department of Natural Resources – Wildlife Diversity Program<PROP>Hydropower<PROP>Iowa<PROP>Environment<MANY>Biological Resources<SEP>Iowa – Department of Transportation – Apply for an Oversize/Overweight Permit Information Webpage<PROP>Hydropower<PROP>Iowa<PROP>General Construction<SEP>Iowa – Department of Transportation – Automated Permitting System<PROP>Hydropower<PROP>Iowa<PROP>General Construction<SEP>Iowa – Department of Transportation – Construction and Restriction Information<PROP>Hydropower<PROP>Iowa<PROP>General Construction<SEP>Iowa – Department of Transportation – General Provisions for Oversize Load Permits<PROP>Hydropower<PROP>Iowa<PROP>General Construction<SEP>Iowa – Department of Transportation – Truck Information Guide<PROP>Hydropower<PROP>Iowa<PROP>General Construction<SEP>Iowa – Iowa City Development Board – Land Use Planning Website<PROP>Bulk Transmission<PROP>Iowa<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Iowa – Iowa Department of Natural Resources – Sovereign Lands Construction Permits Website<PROP>Bulk Transmission<PROP>Iowa<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Iowa – Iowa Department of Transportation – Utility Accommodation and Coordination Website<PROP>Bulk Transmission<PROP>Iowa<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Iowa – Iowa Utilities Board – Electric Franchise FAQ<PROP>Bulk Transmission<PROP>Iowa<PROP>Transmission Siting & Interconnection<SEP>Iowa – Iowa Utilities Board – Electric Franchise Website<PROP>Bulk Transmission<PROP>Iowa<PROP>Transmission Siting & Interconnection<SEP>Iowa- Iowa Department of Natural Resources – Natural Resource Commission Website<PROP>Bulk Transmission<PROP>Iowa<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Johns v. Stevens, 3 Vt. 308, 315-16 (1830)<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Kansas - K.S.A. §§ 77-501 et seq., Kansas Administrative Procedures Act<PROP>Bulk Transmission<PROP>Kansas<PROP><SEP>Kansas Department of Transportation - Utility Accommodation Policy<PROP>Bulk Transmission<PROP>Kansas<PROP>General Construction<SEP>Kansas Highway Permit – Use of Right-of-Way Application<PROP>Bulk Transmission<PROP>Kansas<PROP>Land Access<SEP>Kansas – Kan. Admin. Regs. §§ 28-19-8–801, Kansas Air Quality Regulations<PROP>Bulk Transmission<PROP>Kansas<PROP>Environment<MANY>Air Quality<SEP>Kentucky – 401c Ky. Admin. Regs. 50:010–68:200, Air Quality Regulations<PROP>Bulk Transmission<PROP>Kentucky<PROP>Environment<MANY>Air Quality<SEP>Kentucky – Department of Environmental Protection – 401 Water Quality Certification Application<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – 401 Water Quality Certification Application Instructions<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – 401 Water Quality Certification Applications Pending Approval Webpage<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – 401 Water Quality Certification Fee Payment Form<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – 401 Water Quality Certification Process Flowchart<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – General Conditions of 401 Water Quality Certifications<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – General Water Quality Certification of Nationwide Permits<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – Stormwater Construction General Permit<PROP>Hydropower<PROP>Kentucky<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Kentucky – Department of Environmental Protection – eForm Applications Website<PROP>Hydropower<MANY>Hydrogen<PROP>Kentucky<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Kentucky – Department of Fish & Wildlife Resources – Fishing and Boating Guide<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Biological Resources<SEP>Kentucky – Department of Fish & Wildlife Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>Kentucky<PROP>Environment<MANY>Biological Resources<SEP>Kentucky – Transmission Cabinet – Automated Clearing House Debit Application<PROP>Hydropower<PROP>Kentucky<PROP>General Construction<SEP>Kentucky – Transportation Cabinet – Kentucky Designated National Truck Network Map<PROP>Hydropower<PROP>Kentucky<PROP>General Construction<SEP>Kentucky – Transportation Cabinet – Online Permit Application System<PROP>Hydropower<PROP>Kentucky<PROP>General Construction<SEP>Kentucky – Transportation Cabinet – Overweight/Over-Dimensional Permit Application<PROP>Hydropower<PROP>Kentucky<PROP>General Construction<SEP>Kentucky – Transportation Cabinet – Overweight/Over-Dimensional Proposed Route Survey Form<PROP><PROP>Kentucky<PROP>General Construction<SEP>Kentucky – Transportation Cabinet – Overweight/Over-Dimensional Restrictions List<PROP>Hydropower<MANY>Smart Grid<PROP>Kentucky<PROP>General Construction<SEP>Kentucky – Transportation Cabinet – Overweight/Over-Dimensional Summary Document<PROP>Hydropower<PROP>Kentucky<PROP>General Construction<SEP>Ketchikan Public Utilities, 126 FERC ¶ 62,205 (2009)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Kuiper v. Lundvall, 187 Colo. 40, 529 (1974)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>LOPP Example Acceptance Letter<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>LOPP Federal Register Example Document<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>LOPP Formal Request for Development Example<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>LOPP Proposal Checklist<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Lake Encroachment Permit Application, Abutting Land Owner Addendum<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Land Use Assessment<MANY>Water Quality<SEP>Land Use License<PROP>Geothermal<PROP>Washington<PROP>Exploration<SEP>Lands Administration Regulation – New Brunswick Crown Lands and Forests Act, N.B. Reg. 2009-62<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>Lawrie v. Silsby, 76 Vt. 240, 253 (1904)<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Lease of Power Privilege Flowchart: Award of Preliminary Lease through Award of Lease of Power Privilege<PROP>Hydropower<PROP>US Federal<PROP><SEP>Lease of Power Privilege Flowchart: Dam Request Through Award of Preliminary Lease<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Lease of Power Privilege Flowchart: Lease of Power Privilege Contract through End of Construction<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Lease of Power Privilege Flowchart: Reserved Work Conduit Request Through Award of Preliminary Lease<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Lease of Power Privilege Flowchart: Transferred Work Conduit Request Through Award of Preliminary Lease<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Leasing State Trust Lands in Washington<PROP>Geothermal<PROP>Washington<PROP>Land Access<SEP>Local Coastal Programs<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Land Use<MANY>Site Considerations<SEP>Local Governance Act, S.N.B. 2017, c. 18<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Use<SEP>Louisiana – La. Admin. Code tit. 33-III, §§ 101–5913, Environmental Quality, Air<PROP>Bulk Transmission<PROP>Louisiana<PROP>Environment<MANY>Air Quality<SEP>Louisiana – Large Construction Storm Water General Permit (LAR100000)<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Louisiana Department of Environmental Quality Business Website<PROP>Hydropower<PROP>Louisiana<PROP>Environment<MANY>Water Quality<SEP>Louisiana – Louisiana Department of Environmental Quality Construction Storm Water Permit Website<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Louisiana Department of Environmental Quality Frequently Asked Questions About Water Quality Certifications Website<PROP>Hydropower<PROP>Louisiana<PROP>Environment<MANY>Water Quality<SEP>Louisiana – Louisiana Department of Environmental Quality – Louisiana Pollutant Discharge Elimination System Website<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Louisiana Department of Transportation & Development Oversize Permit Control Permit Form (C-Form)<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Louisiana Department of Transportation & Development Oversize Permit Prepaid Form (A-Form)<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Louisiana Department of Transportation & Development – Permits Electronic Routing Bridge Analysis (PERBA) System<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Louisiana Department of Transportation & Development – Route Clearance Request Form Website<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Louisiana – Small Construction Storm Water General Permit (LAR200000)<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Low-effect HCP Screening Form<PROP>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>MCA 77-4-100 Geothermal Resources<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>MCA 77-4-108 - Water Rights in Connection with Geothermal Development<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>MCA Title 85 - Water Use<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Magnuson-Stevens Fishery Conservation and Management Act<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP><PROP>Environment<MANY>Biological Resources<SEP>Magoon v. Harris, 46 Vt. 264, 269 (1863)<PROP><PROP>Vermont<PROP>Water Access<SEP>Maine – 06-096 Me. Code R. §§ 2-1–1339, Department of Environmental Protection<PROP>Bulk Transmission<PROP>Maine<PROP>Environment<MANY>Air Quality<SEP>Major Facility Siting Program - Circular 2<PROP>Utilities<PROP>Montana<PROP>Land Use<MANY>Site Considerations<MANY>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Water Quality<MANY>Geological Resources<MANY>Aesthetic Resources<SEP>Making Collaboration Work: Lessons from Innovation in Natural Resource Management<PROP><PROP>US Federal<PROP>Land Use<MANY>Environment<SEP>Manitoba Department of Sustainable Development – Application for Crown Land Easement<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Department of Sustainable Development – Application for Crown Land Work Permit<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Department of Sustainable Development – Crown Land Application Review Process Info Sheet<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Department of Sustainable Development – Environment Act Proposal Form<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba Department of Sustainable Development – Environmental Assessment and Licensing Process Flowchart<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<MANY>General Construction<SEP>Manitoba Department of Sustainable Development – Information Bulletin for Environment Act Proposal Report Guidelines<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba Department of Sustainable Development – Information Bulletin for Environmental Assessment and Licensing under the Environment Act<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba Department of Sustainable Development – Work Permit Application Info Sheet<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Infrastructure – Guide for Permits Development Adjacent to Provincial Highways<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Infrastructure – Permit Application Fees<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Infrastructure – Permits for Access, Signs, Structures, and Development Webpage<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Sustainable Development Department – Application for Crown Land Work Permit<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba Sustainable Development Department – Work Permit Application Info Sheet<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba – City of Winnipeg Charter Act, S.M., 2002, c. 39<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Classes of Development Regulation, Man. Reg. 164/88<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Crown Lands Act, C.C.S.M., c. C340<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Environment Act Fees Regulation, Man. Reg. 168/96<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Environment Act, S.M. 1987-88, c. 26<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<MANY>Land Access<MANY>General Construction<SEP>Manitoba – Highway and Transportation Act, C.C.S.M., c. H40<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba – Highways and Transportation Department Permit Application Fees Regulation, Man. Reg. 447/88<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba – Licensing Procedures Regulation, Man. Reg. 163/88<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Planning Act, C.C.S.M., c. P80<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Planning Act, C.C.S.M., c. p80<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – Provincial Planning Regulation, Man. Reg. 91/2011<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Use<SEP>Manitoba – The Transportation Infrastructure Act, C.C.S.M. c. T147<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Manitoba – Transportation Infrastructure General Regulation, Man. Reg. 15/19<PROP>Bulk Transmission<PROP>Manitoba<PROP>Land Access<SEP>Marine Mammal Protection Act<PROP><PROP><PROP>Environment<MANY>Biological Resources<SEP>Market-Based Wildlife Mitigation in Wyoming<PROP><PROP>Wyoming<PROP>Environment<MANY>Water Quality<MANY>Biological Resources<MANY>Land Use Assessment<SEP>Market-based Wildlife Mitigation in Wyoming: A Primer<PROP>Bulk Transmission<PROP>Wyoming<PROP>Environment<MANY>Biological Resources<SEP>Maryland – MD. Code Ann. Envir. §§ 26-11-01–40, Air Quality<PROP>Bulk Transmission<PROP>Maryland<PROP>Environment<MANY>Air Quality<SEP>Massachusetts – 310 Mass. Code Regs. 7.00–7:75, Air Pollution Control<PROP>Bulk Transmission<PROP>Massachusetts<PROP>Environment<MANY>Air Quality<SEP>Massachusetts – 980 CODE MASS. REGS. et seq., Energy Facilities Siting Council<PROP>Bulk Transmission<PROP>Massachusetts<PROP>Land Use<MANY>Transmission Siting & Interconnection<SEP>Massachusetts – MASS. GEN. LAWS ch. 30 §§ 61 et seq., Massachusetts Environmental Policy Act<PROP>Bulk Transmission<PROP>Massachusetts<PROP>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<SEP>Memorandum of Understanding 2007<PROP>Solar<PROP>California<PROP>Site Considerations<SEP>Memorandum of Understanding 2011<PROP>Solar<PROP>California<PROP>Land Use<MANY>Land Access<MANY>Environment<MANY>Land Use Assessment<SEP>Memorandum of Understanding 2013<PROP>Hydropower<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>Memorandum of Understanding Among Various Federal Agencies Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land<PROP>Bulk Transmission<PROP>US Federal<PROP>Site Considerations<SEP>Memorandum of Understanding Between United States Army Corps of Engineers and the Federal Energy Regulatory Commission on Non-Federal Hydropower Projects<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>Memorandum of Understanding Implementing One Federal Decision Under Executive Order 13807<PROP>Geothermal<MANY>Solar<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Power Plant<MANY>Environment<MANY>On Site Evaluation<SEP>Memorandum of Understanding Regarding Transmission Siting on Federal Land (2006)<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Memorandum of Understanding Regarding Transmission Siting on Federal Land (2009)<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Memorandum of Understanding between DOI and DOA - Implementation of Section 225 of the Energy Policy Act of 2005 Regarding Geothermal Leasing and Permitting<PROP>Geothermal<PROP><PROP>Land Use<SEP>Memorandum of Understanding between FERC and Colorado to Streamline the Authorization of Small Scale Hydropower Projects<PROP>Hydropower<PROP>Colorado<PROP>Power Plant<SEP>Mexico – Regulations for the Use of Federal Roads, 2000<PROP>Bulk Transmission<PROP>Mexico Federal<PROP>Land Access<SEP>Michigan Coastal Zone Management Program<PROP>Hydropower<PROP>Michigan<PROP>Environment<MANY>Land Use Assessment<SEP>Michigan Department of Natural Resources Procedure 28.46-05 – Easement for the Use of State Lands<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan Department of Transportation - Utility Classification for Use of State Highway Right-of-Way Webpage<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan Department of Transportation Construction Permit System<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan Department of Transportation Permit Applicant Guide – Construction Permit System<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan Department of Transportation Right-of-Way Construction Permits Webpage<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan Department of Transportation Utility Accommodation Policy<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan Department of Transportation – Frequently Asked Questions<PROP>Bulk Transmission<PROP>Michigan<PROP>Land Access<SEP>Michigan – Department of Environmental Quality – Construction Storm Water Permit by Rule FAQ<PROP>Hydropower<PROP>Michigan<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Michigan – Department of Environmental Quality – MIWaters Website<PROP>Hydropower<PROP>Michigan<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Michigan – Department of Environmental Quality – SESC FAQ<PROP>Hydropower<PROP>Michigan<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Michigan – Department of Environmental Quality – SESC Inspection Log Template<PROP>Hydropower<PROP>Michigan<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Michigan – Department of Environmental Quality – SESC/CSW Staff Map<PROP>Hydropower<PROP>Michigan<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Michigan – Department of Natural Resources – Fishing Guide<PROP>Hydropower<PROP>Michigan<PROP>Environment<MANY>Biological Resources<SEP>Michigan – Department of Natural Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>Michigan<PROP>Environment<MANY>Biological Resources<SEP>Michigan – Department of Transportation – Maximum Legal Truck Loadings and Dimensions<PROP>Hydropower<PROP>Michigan<PROP>General Construction<SEP>Michigan – Department of Transportation – Oversize/Overweight Information<PROP>Hydropower<PROP>Michigan<PROP>General Construction<SEP>Michigan – Department of Transportation – Oversize/Overweight Single Trip Permit Application Guide<PROP>Hydropower<PROP>Michigan<PROP>General Construction<SEP>Michigan – Department of Transportation – Permit Gateway<PROP>Hydropower<PROP>Michigan<PROP>General Construction<SEP>Michigan – Department of Transportation – Permit Gateway Registration Instructions<PROP>Hydropower<PROP>Michigan<PROP>General Construction<SEP>Michigan – Department of Transportation – Superload Information<PROP>Hydropower<PROP>Michigan<PROP>General Construction<SEP>Michigan – Mich. Admin. Code r. 336.1101–336.2910, Air Pollution Control<PROP>Bulk Transmission<PROP>Michigan<PROP>Environment<MANY>Air Quality<SEP>Migratory Bird Program Website<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Biological Resources<MANY>Environment<SEP>Migratory Bird Treaty Act<PROP><PROP>US Federal<PROP>Biological Resources<MANY>Environment<SEP>Minnesota Department of Commerce – Siting and Routing of Energy Facilities Webpage<PROP>Bulk Transmission<PROP>Minnesota<PROP>Transmission Siting & Interconnection<SEP>Minnesota Environmental Quality Board – Environmental Review Rules Guide<PROP>Bulk Transmission<PROP>Minnesota<PROP>Environment<SEP>Minnesota Public Utilities Commission - The Certificate of Need Process Guidance<PROP>Bulk Transmission<PROP>Minnesota<PROP>Transmission Siting & Interconnection<SEP>Minnesota Public Utilities Commission - eDockets System<PROP>Bulk Transmission<PROP>Minnesota<PROP>Transmission Siting & Interconnection<SEP>Minnesota Public Utility Commission – Energy Facility Permitting Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Minnesota<PROP><SEP>Minnesota – Department of Commerce – Energy Environmental Review & Analysis Webpage<PROP>Bulk Transmission<PROP>Minnesota<PROP>Transmission Siting & Interconnection<MANY>Environment<SEP>Minnesota – Department of Natural Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>Minnesota<PROP>Environment<MANY>Biological Resources<SEP>Minnesota – Department of Transportation – Commercial Truck and Passenger Regulations Handbook<PROP>Hydropower<PROP>Minnesota<PROP>General Construction<SEP>Minnesota – Department of Transportation – Oversize/Overweight Permit System<PROP>Hydropower<PROP>Minnesota<PROP>General Construction<SEP>Minnesota – Environmental Quality Board - EQB Monitor<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>Minnesota<PROP><SEP>Minnesota – Joint Application Form for Activities Affecting Water Resources in Minnesota<PROP>Hydropower<PROP>Minnesota<PROP>Environment<MANY>Water Quality<SEP>Minnesota – Local Review of Energy Facilities – A Guide for Governmental Units, Utilities, and Developers<PROP>Bulk Transmission<PROP>Minnesota<PROP>Transmission Siting & Interconnection<SEP>Minnesota – Minn. R. 7001–7027, Minnesota State Air Rules<PROP>Bulk Transmission<PROP>Minnesota<PROP>Environment<MANY>Air Quality<SEP>Minnesota – Minn. Stat. §§ 116D et seq., Environmental Policy<PROP>Bulk Transmission<PROP>Minnesota<PROP>Environment<SEP>Minnesota – Minn. Stat. §§ 216E et seq., Electric Power Facility Permits<PROP>Bulk Transmission<PROP>Minnesota<PROP>Transmission Siting & Interconnection<SEP>Minnesota – Pollution Control Agency – 401 Water Quality Certification Information<PROP>Hydropower<PROP>Minnesota<PROP>Environment<MANY>Water Quality<SEP>Minnesota – Pollution Control Agency – Construction Storm Water General Permit<PROP>Hydropower<PROP>Minnesota<PROP>Land Access<MANY>Environment<MANY>Water Quality<SEP>Minnesota – Pollution Control Agency – Construction Storm Water Permit Overview<PROP>Hydropower<PROP>Minnesota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Minnesota – Pollution Control Agency – Notice of Termination<PROP>Hydropower<PROP>Minnesota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Minnesota – Pollution Control Agency – Online Services System<PROP>Hydropower<PROP>Minnesota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Mississippi – 11-2 Miss. Code R. §§ 1.1–11.3, Air Regulations<PROP>Bulk Transmission<PROP>Mississippi<PROP>Environment<MANY>Air Quality<SEP>Mississippi – 37 Miss. Admin. Code, Pt. 1.7501, R. 03001.100 et seq., Processing Permit Applications<PROP>Bulk Transmission<MANY>Hydropower<PROP>Mississippi<PROP>Land Access<SEP>Mississippi – 37 Miss. Admin. Code, Pt. 1.7501, R. 04002.100 et seq., Right of Way Encroachment Permits<PROP>Bulk Transmission<MANY>Hydropower<PROP>Mississippi<PROP>Land Access<SEP>Mississippi – Department of Environmental Quality – Section 401-404 Explained<PROP>Hydropower<PROP>Mississippi<PROP>Environment<MANY>Water Quality<SEP>Mississippi – Department of Wildlife, Fisheries and Parks – State Wildlife Action Plan<PROP>Hydropower<PROP>Mississippi<PROP>Environment<MANY>Biological Resources<SEP>Missouri Commercial Zone Route Map<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri Department of Natural Resources Application for General Permit Under Missouri Clean Water Law (Form E)<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri Department of Natural Resources Application for Storm Water Permit Under the General Permit: Land Disturbance (Form G)<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri Department of Natural Resources Construction Storm Water General Permit (Permit No. MO-RA00000)<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Missouri Department of Natural Resources Request for Termination of a General Permit (Form H)<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri Department of Natural Resources ePermitting Website<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri Department of Transportation Northeast District – Permit Process<PROP>Bulk Transmission<PROP>Missouri<PROP>Land Access<SEP>Missouri Department of Transportation – General Criteria for Preliminary Submittal<PROP>Bulk Transmission<PROP>Missouri<PROP>Land Access<SEP>Missouri Department of Transportation – Notice of Intent to Perform Work Process<PROP>Bulk Transmission<PROP>Missouri<PROP>Land Access<SEP>Missouri Highways and Transportation Commission Permit to Work on Right of Way<PROP>Bulk Transmission<PROP>Missouri<PROP>Land Access<SEP>Missouri Natural Heritage Database<PROP>Bulk Transmission<PROP>Missouri<PROP>Environment<MANY>Biological Resources<SEP>Missouri Statewide Vehicle Route Map<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri – Missouri Department of Natural Resources Permit Information<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri – Missouri Department of Natural Resources – 401 Water Quality Certification Website<PROP>Hydropower<PROP>Missouri<PROP>Environment<MANY>Water Quality<SEP>Missouri – Missouri Department of Transportation Carrier Express Website<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri – Missouri Department of Transportation Oversize/Overweight Permit Online Application Instructions<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>Missouri – Missouri Department of Transportation – Oversize/Overweight Permit Regulation Handbook<PROP><PROP>Missouri<PROP>General Construction<SEP>Missouri – Mo. Code Regs. Ann. tit. 10 §§ 10-6.010–6.410, Air Quality Standards, Definitions, Sampling and Reference Methods and Air Pollution Control Regulations for the Entire State of Missouri<PROP>Bulk Transmission<PROP>Missouri<PROP>Environment<MANY>Air Quality<SEP>Montana - ARM 17.20 - Major Facility Siting<PROP>Utilities<PROP>Montana<PROP>Power Plant<SEP>Montana - Access Road Easement Policy<PROP>Bulk Transmission<PROP>Montana<PROP>Land Access<SEP>Montana - Application for Right of Way Easement for Utilities Through State Lands<PROP>Geothermal<MANY>Bulk Transmission<PROP>Montana<PROP>Land Access<SEP>Montana - Encroachment Permit Application<PROP>Bulk Transmission<PROP>Montana<PROP>Land Access<SEP>Montana - Instructions for Application for Utilities Across State Trust Lands<PROP>Geothermal<MANY>Bulk Transmission<PROP>Montana<PROP>Land Access<SEP>Montana - Land Use License Application<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Montana<PROP>Land Use<SEP>Montana - MCA 75-20 - Major Facility Siting<PROP>Utilities<PROP>Montana<PROP>Power Plant<SEP>Montana - Right-of-Way Checklist<PROP>Bulk Transmission<PROP>Montana<PROP>Land Access<SEP>Montana 2012 Final Water Quality Integrated Report<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana 2012 Final Water Quality Integrated Report: Appendix A<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana 2012 Report on Selected Heritage Properties<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Cultural Resources<SEP>Montana 310 Permit Database<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana 319 Projects (Nonpoint Source Programs) Wiki<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana 401 Water Quality Certification Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Air Quality Program Laws & Rules Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<MANY>Air Quality<SEP>Montana Association of Conservation Districts Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Board of Water Well Contractors Handbook<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Board of Water Well Contractors Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Building with Wildlife Guide<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Biological Resources<SEP>Montana Bureau of Mines and Geology Website<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<MANY>Geological Resources<SEP>Montana Code 76-2-301 and 302<PROP>Utilities<PROP>Montana<PROP>Land Use<SEP>Montana Construction Dewatering General Permit - Example Authorization<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Construction Dewatering General Permit Application Information<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Cultural Records Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<MANY>Cultural Resources<SEP>Montana Disinfected Water and Hydrostatic Testing General Permit<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Domestic Sewage Treatment Lagoons General Permit<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Domestic Sewage Treatment Lagoons General Permit Fact Sheet<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Domestic Sewage Treatment Lagoons General Permit Information<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Environmental Policy Act Guide<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<SEP>Montana Facilities Which Do Not Discharge Process Wastewater (MDEQ Form 2E)<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Montana Geographic Information Library<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Land Use<MANY>Environment<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Geological Resources<SEP>Montana Ground Water Pollution Control System Information Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Ground Water Pollution Control System Permit Application Forms Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Groundwater Information Center Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Guide to the Streamside Management Zone Law & Rules Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Hazardous Waste Program Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Montana Information for 310 Applicant<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Joint Application for Proposed Work in Montana's Streams (DNRC Form 270)<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Joint Application for Proposed Work in Streams, Lakes and Wetlands Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana MCA 77-4-102, Geothermal Resource Definitions<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana MCA Title 85, Water Use<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana MPDES General Information Form (MDEQ Form 1)<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Natural Resources Conservation Service Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Natural Streambed and Land Preservation Act Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Nonpoint Source FAQs Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Notice of Intent: Domestic Sewage Treatment Lagoons General Permit (MDEQ Form NOI)<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Notice of Intent: Domestic Sewage Treatment Lagoons General Permit Instructions<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Notice of Intent: Sand and Gravel General Permit (MDEQ Form NOI)<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Pending Water Right Application Status Webpage<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Pollutant Discharge Elimination System (MPDES) Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Montana Portable Suction Dredging General Permit - Example Authorization<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Produced Water General Permit - Example Authorization<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Public Water Supply Law and Rules Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Restricted Use Permit Application<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Biological Resources<SEP>Montana Sand and Gravel Operations General Permit - Example Authorization<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana State Antiquities Database<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Montana<PROP>Environment<MANY>Cultural Resources<SEP>Montana Stream Permitting Guide Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Stream Permitting Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Stream Protection Act Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Streamside Management Zone Law Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Aesthetic Resources<SEP>Montana Suction Dredge General Permit Application Information<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Surface Water Application for Beneficial Use (DNRC Form 600 GW)<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Surface Water Application for Beneficial Use (DNRC Form 600 SW)<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Total Maximum Daily Load Development Projects Wiki<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Underground Storage Tanks Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Montana Understanding the Basics of Water Law In Montana Webpage<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Water Quality Permit Application, Nondegradation Authorization, and Permit Fees<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Water Rights Bureau New Appropriations Rule<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Water Rights Bureau Webpage<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Water Rights Form Webpage<PROP>Geothermal<PROP>Montana<PROP>Water Access<SEP>Montana Watershed Protection Section Contacts Webpage<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Montana Watershed Restoration Plans Wiki<PROP>Geothermal<PROP>Montana<PROP>Environment<MANY>Water Quality<SEP>Municipal Powers Act R.S.Q. 2005, c. C-47.1<PROP>Bulk Transmission<PROP>Quebec<PROP>Land Use<SEP>N.M.S. 3-21-1<PROP>Utilities<PROP>New Mexico<PROP>Land Use<MANY>Site Considerations<SEP>N.M.S. 62-1-4<PROP>Utilities<PROP>New Mexico<PROP>Land Use<SEP>NAC 533: Adjudication of Vest Water Rights, Appropriation of Public Waters<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Water Access<SEP>NCSL - State Policy Options: A Report of the National Conference of State Legislatures Task Force on military and Veterans Affairs<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Use Assessment<MANY>Environment<SEP>NDEP - Nevada Construction Stormwater FAQs<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>NDEP BMP Guide<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Nevada<PROP>Environment<MANY>Water Quality<SEP>NDEP BWPC Website<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Nevada<PROP>Environment<MANY>Water Quality<SEP>NDEP BWQP website<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Nevada<PROP>Environment<MANY>Water Quality<SEP>NDEP Forms<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Nevada<PROP>Environment<MANY>Water Quality<SEP>NDMV - Longer Combination Vehicle (LCV) Permit Application<PROP>Geothermal<PROP>Nevada<PROP>General Construction<SEP>NDOT - Application Information for Evaluating Annual Permit<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>NDOT Over Dimensional Permits Instruction 1-08<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>NDOT Over Dimensional Permits Instruction 6-07<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>NDSL Forms<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Nevada<PROP>Land Access<SEP>NEPA and CEQA: Integrating Federal and State Environmental Reviews<PROP>Hydropower<PROP>California<PROP>Environment<MANY>Biological Resources<SEP>NM Installation Requirements for UST Systems<PROP>Geothermal<PROP>New Mexico<PROP>Environment<SEP>NM Underground Storage Tank Registration<PROP>Geothermal<PROP>New Mexico<PROP>Environment<SEP>NMAC Title 19 Natural Resources<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMDOT Application for Permit to Construct an Access or Median Opening on Public Right of Way<PROP>Geothermal<PROP>New Mexico<PROP>Land Access<SEP>NMDOT Application for Permit to Install Utility Facilities Within Public ROW<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Land Access<SEP>NMDOT Utility Permit Application Checklist<PROP>Geothermal<PROP>New Mexico<PROP>Land Access<SEP>NMED - Discharge Permit Application<PROP>Geothermal<PROP>New Mexico<PROP><SEP>NMED Hazardous Waste Bureau website<PROP>Geothermal<MANY>Solar<PROP>New Mexico<PROP>Environment<MANY>Waste & Hazardous Material<SEP>NMED Petroleum Storage Tank Bureau webpage<PROP>Geothermal<PROP>New Mexico<PROP>Environment<MANY>Waste & Hazardous Material<SEP>NMGWQB - Notice of Intent to Discharge<PROP>Geothermal<PROP>New Mexico<PROP><SEP>NMOSE Artesian Well Plan of Operations<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMOSE Basin Guidelines<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMOSE Forms<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMOSE-Change of Ownership of Water Right Application<PROP>Geothermal<PROP>New Mexico<PROP><SEP>NMSA 72-12 Underground Waters<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMSA 72-5 Appropriation and Use of Surface Water<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMSLO Affidavit of Completion of ROW Construction<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Land Access<SEP>NMSLO Application for Exploration/Development Water Easement<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMSLO Application for Permit to Conduct Geophysical Exploration on Unleased State Lands<PROP>Geothermal<PROP>New Mexico<PROP>Exploration<SEP>NMSLO Application for ROW Easement<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Land Access<SEP>NMSLO Application for Water Easement<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMSLO Application for Water Rights Lease<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMSLO Information Packet for Business Lease<PROP>Geothermal<PROP>New Mexico<PROP>Land Access<SEP>NMSLO Right of Entry Request<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Land Access<SEP>NMSLO Surface Division ROW FAQs<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Land Access<SEP>NMSLO Water Lease Damage Bond<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NMSLO Water Rights Agreement<PROP>Geothermal<PROP>New Mexico<PROP>Water Access<SEP>NOAA Hydropower and Fish Passage webpage<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>NPDES Permit Program Website<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>NPDES Permit Writers Manual<PROP>Solar<PROP>Arizona<PROP>Environment<MANY>Water Quality<SEP>NPDES Questions & Answers<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>NPS - National Register of Historic Places website<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>NPS Director's Order<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>NPS Fact Sheet: Hydro-Related Roles, Interests, Activities<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>NPS Handbook for Environmental Impact Analysis<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<SEP>NPS Management Policies 2006<PROP>Hydropower<PROP>US Federal<PROP><SEP>NPS Mission<PROP>Hydropower<PROP>US Federal<PROP><SEP>NPS Pollution Control Program<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>NPS Pollution Control Program Fact Sheet<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>NPS Quick Reference Guide<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>NPS Reference Manual 53: Special Park Uses<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>NRC Solomons RFQ<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>NRS 532: State Engineer<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Water Access<SEP>NRS 533 Adjudication of Vested Water Rights, Appropriation of Public Waters<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>NYISO Open Access Transmission Tariff<PROP>Hydropower<PROP>New York<PROP>Transmission Siting & Interconnection<SEP>NYISO Transmission Expansion and Interconnection Manual<PROP>Hydropower<PROP>New York<PROP>Transmission Siting & Interconnection<SEP>National Association of Tribal Historic Preservation Officers website<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Cultural Resources<SEP>National Bald Eagle Management Guidelines<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>National Conference of State Historic Preservation Officers website<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>National Energy Policy Act (Oct. 24, 1992)<PROP>Hydropower<PROP>US Federal<PROP>General Construction<SEP>National Environmental Policy Act, 42 U.S.C. §§ 4321-4370m<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<MANY>Solar<PROP>US Federal<PROP>Biological Resources<MANY>Cultural Resources<MANY>Environment<MANY>Exploration<MANY>Land Access<MANY>Land Use<MANY>Land Use Assessment<MANY>On Site Evaluation<MANY>Power Plant<MANY>Site Considerations<MANY>Transmission Siting & Interconnection<MANY>Water Quality<MANY>Well Field<MANY>General Construction<MANY>Water Access<MANY>Plant Decommissioning<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>National Environmental Policy Act: Little Information Exists on NEPA Analyses<PROP>Bulk Transmission<PROP>US Federal<PROP><SEP>National Flood Insurance Act<PROP><PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>National Forest Management Act of 1976<PROP><PROP>US Federal<PROP>Land Use<MANY>Land Access<SEP>National Historic Preservation Act, 54 U.S.C. §§ 300101-307108<PROP>Hydropower<PROP><PROP>Land Use<MANY>Land Access<MANY>Power Plant<MANY>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Land Use Assessment<MANY>Water Quality<SEP>National Park Service - Potential Hydroelectric Development at Existing Federal Facilities<PROP>Smart Grid<MANY>Hydropower<PROP>US Federal<PROP><SEP>National Park Service - Recreational Technical Assistance in Hydropower Licensing<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>National Park Service Hydropower Assistance webpage<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>National Park Service Organic Act, 54 U.S.C. §§ 100101 et seq.<PROP>Hydropower<PROP>US Federal<PROP><SEP>National Park Service – National Register of Historic Places Frequently Asked Questions Webpage<PROP><PROP>US Federal<PROP>Site Considerations<SEP>National Policy Memorandum NPM-TRUS-29: Guidance for the Approval of Tribal Leasing Regulations under the HEARTH Act<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Access<MANY>Transmission Siting & Interconnection<SEP>Native American Graves Protection Act<PROP>Hydropower<PROP><PROP>Land Use<MANY>Environment<MANY>Cultural Resources<SEP>Natural Resource Defense Fund - Renewable Energy and Defense Geospatial Database Webpage<PROP><PROP><PROP><SEP>Navy Enhanced Use Lease (EUL) website<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Nebraska Attorney General Opinion 99038 (1999)<PROP>Bulk Transmission<PROP>Nebraska<PROP>Land Access<SEP>Nebraska Department of Road District Map<PROP>Bulk Transmission<PROP>Nebraska<PROP>Land Access<SEP>Nebraska Department of Roads – Application to Occupy Right-of-Way<PROP>Bulk Transmission<PROP>Nebraska<PROP>Land Access<SEP>Nebraska Department of Roads – Permit Application Guidelines<PROP>Bulk Transmission<PROP>Nebraska<PROP>Land Access<SEP>Nebraska Planning Handbook<PROP>Bulk Transmission<PROP>Nebraska<PROP>Land Use<SEP>Nebraska Power Review Board Website<PROP>Bulk Transmission<PROP>Nebraska<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Nebraska Power Review Board – Application for Acquisition or Construction of Transmission Line (Appendix B)<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nebraska Power Review Board – Board Policy No. 2, Reconductoring of Lines<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nebraska Power Review Board – Board Policy No. 5, Qualifying Facilities<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nebraska Power Review Board – Board Policy No. 8, Notice Criteria for Transmission Applications<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nebraska Power Review Board – Consent and Waiver Application (Appendix D)<PROP><PROP>Nebraska<PROP>Land Access<SEP>Nebraska Power Review Board – Orientation Manual<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nebraska Public Service Commission – Application for Authority to Construct, Operate, and Maintain Electric Transmission Line<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nebraska Vacant Building and Excess Land Committee Request Form<PROP>Bulk Transmission<PROP>Nebraska<PROP><SEP>Nebraska Vacant Building and Excess Land Committee: Frequently Asked Question Website<PROP>Bulk Transmission<PROP>Nebraska<PROP>Land Access<SEP>Nebraska – 129 Neb. Admin. Code § 1-001–43-003, Nebraska Air Quality Regulations<PROP>Bulk Transmission<PROP>Nebraska<PROP>Environment<MANY>Air Quality<SEP>Nebraska – 18 N.R.S. §§ 2101 et seq., Community Development Law<PROP>Bulk Transmission<PROP>Nebraska<PROP>Transmission Siting & Interconnection<SEP>Nevada Administrative Code<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Nevada<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>General Construction<MANY>Transmission Siting & Interconnection<SEP>Nevada Agreement for Delegation of Federal PSD Program<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada Air Quality Control Permitting Guidance Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada Air Quality Permitting Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada Application For Renewable Energy System Generators<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>On Site Evaluation<SEP>Nevada Application Modify Water Right<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Application for Extensions of Time (Water Right)<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Application for Permit to Appropriate Water<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Archaeological Association Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Nevada<PROP>Environment<MANY>Cultural Resources<SEP>Nevada Bureau of Air Pollution Control Permit Forms Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada Bureau of Pollution Control Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada Construction Stormwater Factsheet<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>Nevada Department of Conservation and Natural Resources' Nevada Water Law 101 Website<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Water Access<SEP>Nevada Department of Environmental Protection Public Notices<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada Department of Transportation - 2004 Nevada Commercial Vehicle Handbook<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>Nevada Department of Transportation - Occupancy Permits<PROP>Bulk Transmission<PROP>Nevada<PROP>Site Considerations<MANY>Land Access<SEP>Nevada Department of Transportation - Terms and Conditions Relating to Highway Occupancy Permits<PROP>Bulk Transmission<PROP>Nevada<PROP>Site Considerations<SEP>Nevada Department of Wildlife Application for Energy Projects "Fund for the Recovery of Costs"<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<MANY>Biological Resources<SEP>Nevada Department of Wildlife Energy Planning and Conservation Fund Website<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<MANY>Biological Resources<SEP>Nevada Division of Environmental Protection - New Public Water Systems<PROP>Geothermal<MANY>Solar<MANY>Water<PROP>Nevada<PROP>General Construction<MANY>Water Access<SEP>Nevada Division of Environmental Protection online NOI system<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>Nevada Division of Water Resources Forms Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Nevada<PROP>Environment<MANY>Water Quality<SEP>Nevada Fish & Wildlife Habitat Conservation Plans<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Biological Resources<SEP>Nevada Guidelines for Evaluating and Documenting Traditional Cultural Properties Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Nevada<PROP>Environment<MANY>Cultural Resources<SEP>Nevada Industrial Solid Waste Disposal Site Permit Application<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada Lawyer Magazine: Overview of Water Law in Nevada<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Water Access<SEP>Nevada NRS 704.860, Utility Facility Definition<PROP>Geothermal<MANY>Utilities<PROP>Nevada<PROP>Transmission Siting & Interconnection<SEP>Nevada Permitting Renewable Energy Resources<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada Procedures for Filing Application for a Water Right<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Proof of Application of Water to Beneficial Use<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Proof of Application of Water to Beneficial Use Instructions<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Proof of Completion of Work (Water Right)<PROP>Geothermal<PROP>Nevada<PROP>Water Access<SEP>Nevada Renewable Energy Application For Net Metering Customers<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>On Site Evaluation<SEP>Nevada Revised Statutes<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Nevada<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Nevada Rules of Appellate Procedure<PROP>Bulk Transmission<MANY>Utilities<PROP>Nevada<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Nevada Rules of Civil Procedure<PROP>Bulk Transmission<MANY>Utilities<PROP>Nevada<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Nevada Sample Application for Permit Under Utility Environmental Protection Act<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>On Site Evaluation<SEP>Nevada Solid Waste Forms and Guidance Documents Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada State Air Regulations and State Implementation Plan Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada State Certified Tank Handler Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada State Clearinghouse<PROP><PROP>Nevada<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>General Construction<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>Nevada State Historic Preservation Office Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Cultural Resources<SEP>Nevada State Protocol Agreement for Implementing the National Historic Preservation Act<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Cultural Resources<SEP>Nevada Stormwater General Permit NVR100000<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>Nevada Traffic Laws for Size, Weight and Load<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>General Construction<SEP>Nevada Transmission Siting Information<PROP>Bulk Transmission<PROP>Nevada<PROP>Site Considerations<SEP>Nevada Underground Tank Program Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada Washoe County Solid Waste Management Webpage<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Nevada – Nev. Admin. Code §§ 445B.001–899, Air Pollution<PROP>Bulk Transmission<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada – Nev. Rev. Stat. §§ 445B.100–845, Air Pollution<PROP>Bulk Transmission<PROP>Nevada<PROP>Environment<MANY>Air Quality<SEP>Nevada – Nev. Rev. Stat. §§ 704.820 et seq., Construction of Utility Facilities: Utility Environmental Protection Act<PROP>Bulk Transmission<PROP>Nevada<PROP>Transmission Siting & Interconnection<SEP>New Brunswick Department of Energy and Resource Development – Crown Land Easement Application Package<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land Easement and Right-of-Way Fact Sheet<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land Easements Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land Leases Application Package<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land Leases Fact Sheet<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land Leases Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land License of Occupation Application Package<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land License of Occupation Fact Sheet<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Energy and Resource Development – Crown Land License of Occupation Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Department of Environment and Local Government – A Guide to Environmental Impact Assessment in New Brunswick<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>New Brunswick Department of Environment and Local Government – Environmental Impact Assessment Registration Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>New Brunswick Department of Environment and Local Government – Environmental Impact Assessment Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>New Brunswick Department of Transportation and Infrastructure – General Information Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick Transmission and Operator System Appendix A, Electricity Business Rules Definitions<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Transmission Siting & Interconnection<SEP>New Brunswick Transmission and System Operator Appendix A, Electricity Business Rules Definitions<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Transmission Siting & Interconnection<SEP>New Brunswick Transmission and System Operator Division Appendix A, Electricity Business Rules Definitions<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Transmission Siting & Interconnection<SEP>New Brunswick Transmission and System Operator Division Appendix B, Connection Assessment Procedure Form<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Transmission Siting & Interconnection<SEP>New Brunswick – Assessment and Planning Appeal Board Act, R.S.N.B. 2011, c. 114<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Use<SEP>New Brunswick – Assessment and Planning Appeal Board Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Use<SEP>New Brunswick – Clean Environment Act, Appeal Regulation, N.B. Reg. 84-179<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>New Brunswick – Clean Environment Act, R.S.N.B. 1973, c. C-6<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>New Brunswick – Community Planning Act, S.N.B. 2017, c. 19<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Use<SEP>New Brunswick – Crown Lands and Forests Act, S.N.B. 1980, c. C-38.1<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<MANY>Land Use<SEP>New Brunswick – Electricity Act, S.N.B. 2013, c. E-4.6<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Use<MANY>Transmission Siting & Interconnection<SEP>New Brunswick – Environmental Impact Assessment Regulation, N.B. Reg. 87-83<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Environment<SEP>New Brunswick – Highway Act, R.S.N.B. 1973, c. H-5<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick – Highway Corporation Act, S.N.B. 1995, c. N-5.11<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>New Brunswick – Transmission and System Operator Division Electricity Business Rules<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Transmission Siting & Interconnection<SEP>New Brunswick – Transmission and System Operator Division Webpage<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Transmission Siting & Interconnection<SEP>New Energy Frontier: Balancing Energy Development on Federal Lands<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Water<MANY>Wind<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Aesthetic Resources<SEP>New Hampshire – N.H. Code Admin. R. Ann. Env-A 100–4800, Rules Governing the Control of Air Pollution<PROP>Bulk Transmission<PROP>New Hampshire<PROP>Environment<MANY>Air Quality<SEP>New Jersey – N.J. Admin. Code §§ 7:27-1–27-34, Air Pollution Control<PROP>Bulk Transmission<PROP>New Jersey<PROP>Environment<MANY>Air Quality<SEP>New Mexico Antidegradation Policy Implementation Procedure<PROP>Geothermal<PROP>New Mexico<PROP>Environment<MANY>Water Quality<SEP>New Mexico Archaeological Permits Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Environment<MANY>Cultural Resources<SEP>New Mexico Department of Fish and Game Mining Guidelines webpage<PROP>Geothermal<PROP>New Mexico<PROP>Environment<MANY>Biological Resources<SEP>New Mexico Department of Fish and Game Powerline Project Guidelines<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Environment<MANY>Biological Resources<SEP>New Mexico Department of Fish and Game webpage<PROP>Geothermal<PROP>New Mexico<PROP>Environment<MANY>Biological Resources<SEP>New Mexico HB 201 (2012) An Act Relating to Geothermal Resources; Providing for ground water to qualify as a geothermal resource<PROP>Geothermal<PROP>New Mexico<PROP>Well Field<MANY>Water Access<SEP>New Mexico Interconnection Manual<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>New Mexico<PROP>Transmission Siting & Interconnection<SEP>New Mexico Nonpoint Source Management Program<PROP><PROP>New Mexico<PROP><SEP>New Mexico Surface Water Quality Bureau Federal Dredge and Fill Permits webpage<PROP>Geothermal<PROP>New Mexico<PROP>Environment<MANY>Water Quality<SEP>New Mexico – N.M. Code R. §§ 20.2.1–350, Air Quality (Statewide)<PROP>Bulk Transmission<PROP>New Mexico<PROP>Environment<MANY>Air Quality<SEP>New York - 6 C.R.R.-NY VI § 621 et seq.<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York - Dam Safety Forms<PROP>Hydropower<PROP>New York<PROP>Power Plant<SEP>New York - Environmental Conservation Law, General Provisions<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<SEP>New York - Historic Resource Inventory Form<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<SEP>New York - State Environmental Quality Review Act<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP>Land Use<MANY>Environment<SEP>New York - State Historic Preservation Office<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<SEP>New York - Wild Scenic and Recreational Rivers Act, 15-2701 et seq.<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Aesthetic Resources<SEP>New York Department of Environmental Conservation - Guidelines for Design of Dams<PROP>Hydropower<PROP>New York<PROP>Power Plant<SEP>New York Department of Environmental Conservation Construction or Repair of Dams and Impounding Structures<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York Department of Environmental Conservation Excavation or Placement of Fill in Navigable Waters<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York Department of Environmental Conservation Preliminary Notice of Proposed Water Well<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>New York Department of Environmental Conservation Protected Stream or Other Watercourse Webpage<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York Department of Environmental Conservation Water Well Completion Report Website<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>New York Department of Environmental Conservation Water Well Contractor Registration Website<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>New York Department of Environmental Conservation Water Well Contractor Search Wizard Website<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>New York Department of Environmental Conservation – Freshwater and Tidal Wetlands: Application Fees FAQS<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Site Considerations<SEP>New York Department of Environmental Conservation – Hydropower in New York Webpage<PROP>Hydropower<PROP>New York<PROP><SEP>New York Department of Transportation – Information Concerning Special Hauling Permits<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York Division of Environmental Conservation – SEQR Handbook<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Water Quality<MANY>Air Quality<SEP>New York Division of Environmental Permits - SEQR: Guiding the Process<PROP>Hydropower<PROP>New York<PROP>Land Use<MANY>Environment<SEP>New York Independent System Operator – Power Trends 2016, The Changing Energy Landscape<PROP>Hydropower<PROP>New York<PROP><SEP>New York Joint Application Form for Permits to Undertake Activities Affecting Waters<PROP>Hydropower<PROP>New York<PROP>Power Plant<MANY>Environment<MANY>Water Access<MANY>On Site Evaluation<SEP>New York Parks, Recreation and Historic Preservation – Indian Nation Areas of Interest<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<SEP>New York Power Authority, 105 FERC ¶ 61,102 (2003)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>New York Power Authority, 118 FERC ¶ 61,206 (2007)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>New York Public Service Commission – The Certification Review Process for Major Electric and Fuel Gas Transmission Facilities Guide<PROP>Hydropower<PROP>New York<PROP>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<SEP>New York Public Service Proceeding Comment Form<PROP>Hydropower<PROP>New York<PROP><SEP>New York Regulations – Department of Environmental Conservation<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>On Site Evaluation<SEP>New York Regulations – Department of Health<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>New York Regulations – Department of Public Service, Electric Utilities<PROP>Hydropower<PROP>New York<PROP>Power Plant<SEP>New York Regulations – Department of Public Service, Hearings<PROP><PROP>New York<PROP>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<SEP>New York Regulations – Department of Public Service, Matters Relative to All Applications<PROP>Hydropower<PROP>New York<PROP><SEP>New York Regulations – Department of Public Service, Rules of Procedure<PROP>Hydropower<PROP>New York<PROP>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<SEP>New York Regulations – Department of Transportation<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York Regulations – Department of Transportation, Work Permits on State Highways<PROP>Hydropower<PROP>New York<PROP><SEP>New York Regulations – Executive Department<PROP>Hydropower<PROP>New York<PROP>Site Considerations<SEP>New York Regulations – Parks, Recreation and Historic Preservation<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<SEP>New York SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-15-002)<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York State Application for a New Divisible Load Overweight Permit (Perm 61)<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York State Bureau of Management Analysis and Projects – Occupancy Permits<PROP>Hydropower<PROP>New York<PROP>Land Access<SEP>New York State Department of Environmental Conservation Comprehensive Plans Website<PROP>Hydropower<PROP>New York<PROP><SEP>New York State Department of Environmental Conservation Joint Application Form<PROP>Hydropower<PROP>New York<PROP>Environment<SEP>New York State Department of Environmental Conservation Notice of Termination<PROP><PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York State Department of Environmental Conservation – Getting an Environmental Permit Webpage<PROP>Hydropower<PROP>New York<PROP>Environment<SEP>New York State Department of Environmental Conservation – Procedures for Licensing Onshore Major Oil Storage Facilities<PROP>Hydropower<PROP>New York<PROP>General Construction<MANY>Power Plant<SEP>New York State Department of Public Service – NYISO Website<PROP>Hydropower<PROP>New York<PROP>Transmission Siting & Interconnection<SEP>New York State Department of Transportation – Divisible Load Overweight Permit Website<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York State Department of Transportation – Highway Utility Work Permit Website<PROP>Hydropower<PROP>New York<PROP><SEP>New York State Department of Transportation – Highway Work Permit Application for Utility Work (Form PERM 32)<PROP>Hydropower<PROP>New York<PROP><SEP>New York State Department of Transportation – Highway Work Permits Website<PROP>Hydropower<PROP>New York<PROP><SEP>New York State Department of Transportation – Permit Types That Require Additional Attachments<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York State Department of Transportation — Official Description of Designated Qualifying and Access Highways in New York State<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York State Environmental Notice Bulletin<PROP>Hydropower<PROP>New York<PROP>Environment<SEP>New York State Office of General Services – Application for Use of Land Underwater<PROP>Bulk Transmission<MANY>Hydropower<PROP>New York<PROP>Land Access<SEP>New York State Office of General Services: Lands Underwater<PROP>Hydropower<PROP>New York<PROP>Site Considerations<SEP>New York State Office of Parks, Recreation and Historic Preservation - Human Remains Discovery Protocol<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<SEP>New York State Office of Parks, Recreation and Historic Preservation - Project Review Cover Form<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Cultural Resources<SEP>New York State Regulations – Department of Environmental Conservation, Division of Water Resources<PROP>Hydropower<PROP>New York<PROP>Environment<SEP>New York State Regulations – Department of Environmental Conservation, Resource Management Services<PROP>Hydropower<PROP>New York<PROP><SEP>New York State SWPP Preparer Certification Form<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York State Special Hauling Permit Application (Perm 39)<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York State Stormwater General Permit for Construction Activity Notice of Intent<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York State Thruway Authority - Occupancy Permit Application (TA-W41337)<PROP>Hydropower<PROP>New York<PROP>Land Access<SEP>New York State Thruway Authority - Occupancy and Work Permit Accommodation Guidelines<PROP>Hydropower<PROP>New York<PROP>Land Access<SEP>New York State Thruway Authority - Transaction Analysis Process<PROP>Hydropower<PROP>New York<PROP>Land Access<SEP>New York State – Civil Practice Law and Rules<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP><SEP>New York State – Department of Environmental Conservation SPDES Permit Program: Application Procedures<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Water Quality<SEP>New York State – Department of Environmental Conservation, General Regulations<PROP>Hydropower<PROP>New York<PROP><SEP>New York State – General City Law<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP><SEP>New York State – General Municipal Law<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP><SEP>New York State – Town Law<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP><SEP>New York State – Village Law<PROP>Hydropower<PROP>New York<PROP><SEP>New York – Application for Permit for the Construction or Repair of a Dam<PROP>Hydropower<PROP>New York<PROP>Power Plant<SEP>New York – Department of Environmental Conservation Permission to Inspect Property Form<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Biological Resources<SEP>New York – Department of Environmental Conservation Regional Office Directory<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Biological Resources<SEP>New York – Environmental Conservation Law<PROP>Hydropower<PROP>New York<PROP><SEP>New York – Highway Law, Commissioner of Transportation<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP><SEP>New York – Highway Law, State Highways<PROP>Bulk Transmission<MANY>Hydropower<PROP>New York<PROP><SEP>New York – N.Y. Comp. Codes R. & Regs. tit. 6 §§ 595-614, Water Protection<PROP>Hydropower<PROP>New York<PROP><SEP>New York – N.Y. Comp. Codes R. & Regs. tit. 6, §§ III-A–C, Air Resources<PROP>Bulk Transmission<PROP>New York<PROP>Environment<MANY>Air Quality<SEP>New York – Protection of Waters Program<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Biological Resources<SEP>New York – Protection of Waters: Application Procedures<PROP>Utilities<MANY>Hydropower<PROP>New York<PROP>Environment<MANY>Biological Resources<SEP>New York – Public Service Law<PROP>Hydropower<MANY>Bulk Transmission<PROP>New York<PROP>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<SEP>New York – Vehicle and Traffic Law, Safety Responsibility; Equipment Inspection; Size and Weight<PROP>Hydropower<PROP>New York<PROP>General Construction<SEP>New York – Wild, Scenic and Recreational Rivers Permit Program<PROP>Hydropower<PROP>New York<PROP>Environment<MANY>Aesthetic Resources<SEP>Non-Attorney’s Guide to Colorado Water Courts<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Non-Lawyers' Guide to Hearings before the Colorado Ground Water Commission<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>North Carolina – 15A NCAC 02D .0100–.2600, Air Pollution Requirements<PROP>Bulk Transmission<PROP>North Carolina<PROP>Environment<MANY>Air Quality<SEP>North Carolina – 15A NCAC 02Q .0100–.0900, Air Quality Permit Procedures<PROP>Bulk Transmission<PROP>North Carolina<PROP>Environment<MANY>Air Quality<SEP>North Carolina – N.C. Gen. Stat. §§ 113A-1–113-20, Environmental Policy Act<PROP>Bulk Transmission<PROP>North Carolina<PROP>Environment<SEP>North Dakota – Department of Health – Construction Storm Water General Permit<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>North Dakota – Department of Health – Construction Storm Water General Permit Notice of Intent<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>North Dakota – Department of Health – Notice of Termination<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>North Dakota – Department of Health – SWPPP Template<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>North Dakota – Department of Transportation – Example Application<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Transportation – State Transportation Improvement Program<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Transportation – Utility Accommodation Policy<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Transportation – Utility Occupancy Permit Application<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Transportation – Utility Occupancy Webpage<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Transportation – Utility Permit Instructions<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Trust Lands – Example General Route Map<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Trust Lands – Permit Example<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Trust Lands – Right-of-Way Application<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Department of Trust Lands – Right-of-Way Application Procedures Webpage<PROP>Bulk Transmission<PROP>North Dakota<PROP>Land Access<SEP>North Dakota – Game and Fish Department – State Wildlife Action Plan<PROP>Hydropower<PROP>North Dakota<PROP>Environment<MANY>Biological Resources<SEP>North Dakota – Highway Patrol – E-Permits System<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<SEP>North Dakota – Highway Patrol – Permit Policy for Movements of Oversize and Overweight Vehicles and/or Loads<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<SEP>North Dakota – Highway Patrol – Vehicle Legal Size and Weight Guide<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<SEP>North Dakota – Highway Patrol – Weight Limitations Chart<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<SEP>North Dakota – N.D. Admin. Code 33.1-15-01–25, Air Pollution Control<PROP>Bulk Transmission<PROP>North Dakota<PROP>Environment<MANY>Air Quality<SEP>North Dakota — N.D. Century Code §§ 28-32-01 et seq., Administrative Agencies Practice Act<PROP>Hydropower<PROP>North Dakota<PROP>General Construction<SEP>North Dakota, et al. v. EPA, Memorandum Opinion and Order Granting Plaintiffs' Motion for Preliminary Injunction<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Water Access<SEP>North Gualala Water v. State North Resources Control Board<PROP>Hydropower<PROP>California<PROP>Water Access<SEP>Northern Water – About Us<PROP>Hydropower<PROP>US Federal<PROP>Environment<MANY>On Site Evaluation<MANY>Water Quality<SEP>Northwest Power Act<PROP>Hydropower<PROP>US Federal<PROP><SEP>Norton v Southern Utah Wilderness Alliance, 542 US 55<PROP>Geothermal<PROP>US Federal<PROP>Land Use<MANY>Environment<SEP>Notice of Intent (NOI) (CSW-G) to Discharge Storm Water Associated with Construction Activity Greater Than 5 Acres<PROP>Hydropower<PROP>Louisiana<PROP>General Construction<SEP>Notice of Intent for Stormwater Discharges Associated with Construction Activity on Low Risk Sites<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Notice of Intent for Stormwater Discharges Associated with Construction Activity on Moderate Risk Sites<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Notice of Issuance of Stormwater Discharge Permit<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Land Use Assessment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Notification for Underground Storage Tanks (EPA Form 7530-1)<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Notification of Regulated Waste Activity<PROP>Geothermal<PROP>New Mexico<PROP>Environment<SEP>O.A.R. 660-006<PROP>Utilities<PROP>Oregon<PROP>Land Use<MANY>Site Considerations<MANY>Environment<MANY>Biological Resources<MANY>Aesthetic Resources<SEP>O.A.R. 660-033<PROP>Utilities<PROP>Oregon<PROP>Land Use<MANY>Site Considerations<MANY>Environment<MANY>Water Access<MANY>Biological Resources<SEP>ORS 536 - Water Resources Administration<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>ORS 538 - Withdrawal of Certain Waters From Appropriation<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>Office of Indian Energy and Economic Development – Tribal Energy and Environmental Information Website<PROP>Hydropower<PROP><PROP><SEP>Office of Management and Budget Circular No. A-133<PROP>Solar<PROP><PROP>Environment<MANY>Waste & Hazardous Material<SEP>Office of State Lands and Investments - Easements<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Ohio Coastal Management Program Document<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Land Use Assessment<SEP>Ohio Department of Natural Resources Coastal Guidance<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Natural Resources Coastal Management Permits and Leases Webpage<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Natural Resources Coastal Management Program Website<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Land Use Assessment<SEP>Ohio Department of Natural Resources Coastal Permits and Lease Application<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Natural Resources Coastal Permits and Lease Applications Booklet<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Natural Resources – Application to Occupy, Use or Purchase State Canal Lands<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Natural Resources – Leasing Ohio Canal Land Webpage<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Transportation Limitations/Provisions on the Use of a Special Hauling Permit<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Department of Transportation Operational Guide for Vehicles Operating With an Oversize-Overweight Special Hauling Permit<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Department of Transportation Permit Application<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Transportation Permitting Process for Utility Accommodation of Highway Right-of-Way<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio Department of Transportation Special Hauling Permit Application Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Department of Transportation Special Hauling Permit Endorsement to Liability Insurance Policy Form<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Department of Transportation Special Hauling Permits Information Webpage<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Big Darby Creek Watershed Construction Storm Water General Permit<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Construction Stormwater General Permit<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Dischargers Covered Under Storm Water Discharge General Permits Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Division of Surface Water Electronic Business Services Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency General NPDES Permit Notice of Termination<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Notice of Intent Application Form for Requesting Coverage Under an Ohio EPA General Permit Instructions<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Olentangy River Watershed Construction Storm Water General Permit<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Rainfall Erosivity Waiver Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Routine Maintenance Exclusion from Small Construction Activity Permitting Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Protection Agency Storm Water Pollution Prevention Plan (SWPPP) Checklist for Construction Activities<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Environmental Review Appeals Commission Appeal Process Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio Power Siting Board – Standard Application Process Flowchart<PROP>Bulk Transmission<PROP><PROP>Transmission Siting & Interconnection<SEP>Ohio State Highway Access Management Manual<PROP>Bulk Transmission<PROP>Ohio<PROP>Land Access<SEP>Ohio – Ohio Admin. Code 3745-17-01–14, Particulate Matter Standards<PROP>Bulk Transmission<PROP>Ohio<PROP>Environment<MANY>Air Quality<SEP>Ohio – Ohio Admin. Code 3745-31-01–34, Permits-to-Install New Sources and Permit-to-Install and Operate Program<PROP>Bulk Transmission<PROP>Ohio<PROP>Environment<MANY>Air Quality<SEP>Ohio – Ohio Department of Natural Resources Office of Coastal Management – Permits & Leases Website<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Land Use Assessment<SEP>Ohio – Ohio Environmental Protection Agency 401 WQC Pre-Application Meeting Request Form<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency Water Quality Certification and Isolated Wetland Permits Webpage<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – 401 Water Quality Certification Applicant Public Notice Instruction Sheet<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – 401 Water Quality Certification Application Form<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – 401 Water Quality Certification Application Instructions<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – 401 Water Quality Certification Dispute Resolution Guidance<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – Construction Stormwater Program Website<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio – Ohio Environmental Protection Agency – Mid-Project Review (MPR) Guidance<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – Ohio General Circulation Newspaper List<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Environmental Protection Agency – Weekly Review and Public Notices Website<PROP>Hydropower<PROP>Ohio<PROP>Environment<MANY>Water Quality<SEP>Ohio – Ohio Turnpike Overweight & Overdimensional Permit System Webpage<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio – Ohio Turnpike Special Hauling Information Webpage<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio – Ohio Turnpike Special Hauling Permit FAQs Webpage<PROP>Hydropower<PROP>Ohio<PROP>General Construction<SEP>Ohio, et al. v. EPA, Order of Stay<PROP>Hydropower<PROP>US Federal<PROP><SEP>Oklahoma – Okla. Admin. Code §§ 252:100-1-1–47-1, Air Pollution Control<PROP>Bulk Transmission<PROP>Oklahoma<PROP>Environment<MANY>Air Quality<SEP>Ontario Energy Board Act, 1998, S.O. 1998, c. 15, Sched. B<PROP>Bulk Transmission<PROP>Ontario<PROP>Transmission Siting & Interconnection<SEP>Ontario Ministry of Natural Resources and Forestry Policy Directive – PL 4.02.01, Application Review and Land Disposition Process (Procedure)<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Building and Land Use Permit Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Building and Land Use Policy Manual<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Encroachment Permit Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Highway Access Management Guideline<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Highway Corridor Management Online Services Portal<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Highway Corridor Management Permit Applications Service Commitment Webpage<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Highway Corridor Management Permit Wizard<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Ministry of Transportation – Permit Administration Manual<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Public Lands Act, R.S.O. 1990, c. P.43<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Ontario Regulation 116/01, Electricity Projects<PROP>Bulk Transmission<PROP>Ontario<PROP>Environment<MANY>Land Use Assessment<SEP>Ontario – Environmental Assessment Act, R.S.O. 1990, c. E.18<PROP>Bulk Transmission<PROP><PROP>Environment<MANY>Land Use Assessment<SEP>Ontario – Guide to Environmental Assessment Requirements for Electricity Projects<PROP>Bulk Transmission<PROP>Ontario<PROP>Environment<MANY>Land Use Assessment<SEP>Ontario – Planning Act, R.S.O. 1990, c. P.13<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Use<SEP>Ontario – Public Transportation and Highway Improvement Act, R.S.O. 1990, c. P.50<PROP>Bulk Transmission<PROP>Ontario<PROP>Land Access<SEP>Oregon Administrative Rules<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Access<MANY>Site Considerations<SEP>Oregon Air Contaminant Discharge Permits Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Air Quality<SEP>Oregon Air Contaminant Discharge Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Air Quality<SEP>Oregon Application for Onsite Sewage Treatment System<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Certified Water Right Examiners Query Webpage<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>Oregon Coastal Management Program Website<PROP>Geothermal<PROP>Oregon<PROP>Environment<SEP>Oregon Construction Stormwater General Permit<PROP>Geothermal<PROP>Oregon<PROP>General Construction<SEP>Oregon Construction/Installation Permit for Onsite Wastewater Treatment System<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon DEQ Hazardous Waste Fact Sheet<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon Department of Energy Small, Low-Impact Hydropower Website<PROP>Hydropower<PROP>Oregon<PROP><SEP>Oregon Department of Environmental Quality Contacts Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<SEP>Oregon Department of Land Conservation and Department - Forest Land Protectio Program<PROP>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Environment<MANY>Aesthetic Resources<MANY>Site Considerations<MANY>Biological Resources<SEP>Oregon Department of Land Conservation and Development - Farmland Protection Program<PROP><PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Environment<MANY>Site Considerations<MANY>Biological Resources<SEP>Oregon Department of State Lands - Easement Application Form Across State Land or Waterbody<PROP>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Oregon Department of Transportation - Maintenance and Operations Branch<PROP>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Oregon Department of Transportation - Request for Pre-Application Meeting for State Highway Approach<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Oregon Federal and State Compliance for Historic and Archaeological Resources Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Cultural Resources<SEP>Oregon Federal and State Historic Preservation Laws Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Cultural Resources<SEP>Oregon Fees for Underground Injection Control Program Fact Sheet<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon General Industrial Water Pollution Control Facilities Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Guidelines for Stormwater Management Plans for Removal/Fill Permit Applications<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Land Management Division - Easements<PROP>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Oregon Land Use Compatibility Statement for Onsite Wastewater Treatment System Permits<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Land Use Compatibility Statements Website<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Learning About and Applying for Water Rights Webpage<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>Oregon Modification Application Geothermal Wells Form<PROP>Geothermal<PROP>Oregon<PROP>Environment<SEP>Oregon NPDES Permits, Forms, and Information<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon NPDES Storm Water Discharge Permit (DEQ Form 1200-A)<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon National Register and Survey Program Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Cultural Resources<SEP>Oregon Nonpoint Source Program Implementation Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon ORS 537 Appropriation of Water Generally<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>Oregon Onsite Wastewater Management Program Forms by County Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Onsite Wastewater Management Program Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Plugging Record Form<PROP>Geothermal<PROP>Oregon<PROP>Environment<SEP>Oregon Procedure and Criteria for Hazardous Waste Treatment, Storage or Disposal Permits Fact Sheet<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon Removal-Fill Permit Application Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Rulemaking Announcement for Onsite Septic System Program<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Rules of Appellate Procedure<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Oregon<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Oregon Section 401 Removal/Fill Certification Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Siting Process<PROP>Utilities<MANY>Bulk Transmission<PROP>Oregon<PROP>Power Plant<MANY>Site Considerations<SEP>Oregon State Endangered Species List<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Biological Resources<SEP>Oregon Stormwater Permit Application Forms and Permit Fees Website<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Underground Injection Control Program Authorized Injection Systems Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon Underground Injection Control Program Webpage<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon Underground Injection Control Registration Application Fees (DEQ Form UIC 1003-GIC)<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon Underground Injection Control Registration Geothermal Heating Systems (DEQ Form UICGEO-1004(f))<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Oregon Water Quality Permit Program (Stormwater - Industrial Activities) Website<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Water Quality Permit Program (Stormwater Discharge Permits) Website<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Water Quality<SEP>Oregon Water Resource Department Forms Webpage<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>Oregon Water Rights Public Notice Webpage<PROP>Geothermal<PROP>Oregon<PROP>Water Access<SEP>Oregon Willamette River Basin Mitigation Agreement<PROP>Geothermal<PROP>Oregon<PROP>Environment<MANY>Biological Resources<SEP>Oregon – Or. Admin. R. 200–272, Department of Environmental Quality Air Quality Regulations<PROP>Bulk Transmission<PROP>Oregon<PROP>Environment<MANY>Air Quality<SEP>Outer Continental Shelf Lands Act<PROP><PROP>US Federal<PROP>Land Access<SEP>PPL Holtwood, LLC, Offer of Settlement and Explanatory Statement, (2009)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>PUCT - Procedure for Certifying Renewable Energy Credit Generators<PROP>Geothermal<PROP>Texas<PROP>Transmission Siting & Interconnection<SEP>PUCT - Registration Form for Power Generation Companies and Self-Generators<PROP>Geothermal<PROP>Texas<PROP>Transmission Siting & Interconnection<SEP>PUCT DG Interconnection Manual<PROP>Geothermal<PROP>Texas<PROP>Transmission Siting & Interconnection<SEP>PacifiCorp, 105 FERC ¶ 62,207 (2003)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Paleontological Resources Preservation Act<PROP>Buildings<PROP><PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Geological Resources<SEP>Pennsylvania Bulletin<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Water Quality<SEP>Pennsylvania – 25 Pa. Code §§ 121.1–10, General Provisions<PROP>Bulk Transmission<PROP>Pennsylvania<PROP>Environment<MANY>Air Quality<SEP>Pennsylvania – 25 Pa. Code §§ 121.1–145.223, Air Resources<PROP>Bulk Transmission<PROP>Pennsylvania<PROP>Environment<MANY>Air Quality<SEP>Pennsylvania – 25 Pa. Code §§ 123.1–215, Standards for Contaminants<PROP>Bulk Transmission<PROP>Pennsylvania<PROP>Environment<MANY>Air Quality<SEP>Pennsylvania – 25 Pa. Code §§ 127.1–802, Construction, Modification, Reactivation, and Operation of Sources<PROP>Bulk Transmission<PROP>Pennsylvania<PROP>Environment<MANY>Air Quality<SEP>Pennsylvania – Department of Environmental Protection - Application for Limited Power Permit<PROP>Hydropower<PROP>Pennsylvania<PROP>Power Plant<SEP>Pennsylvania – Department of Environmental Protection - Construction Storm Water General Permit<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection - Notice of Termination<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection - Permit Application Consultation Tool<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – Chapter 105 Fee(s) Calculation Worksheet<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – Environmental Assessment Form<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – Environmental Assessment Form Instructions<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – NPDES General Permit Fact Sheet<PROP>Hydropower<MANY>Buildings<PROP>Pennsylvania<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – NPDES General Permit Overview<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – Notice of Intent for Coverage Under the General NPDES Permit<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Environmental Protection – Notice of Intent for Coverage Under the General NPDES Permit Application Instructions<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Pennsylvania – Department of Transportation - Automated Permit Routing/Analysis System<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – APRAS Supplemental Registration Form<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Form M-938<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – General Application for Special Hauling Permit<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Miscellaneous Application for Special Hauling Permit<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Registration Agreement for Special Hauling Permits<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Route Survey<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Super Load Application Package Instructions<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Supplemental Application for Overweight Special Hauling Permit<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Department of Transportation – Surety Bond<PROP>Hydropower<PROP>Pennsylvania<PROP>General Construction<SEP>Pennsylvania – Environmental Council – Hydroelectric Permitting Manual<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Water Quality<SEP>Pennsylvania – Fish and Boat Commission – Policy Manual<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Biological Resources<SEP>Pennsylvania – Fish and Boat Commission – Wildlife Action Plan Webpage<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Biological Resources<SEP>Pennsylvania – Natural Heritage Program – Conservation Explorer Tool<PROP>Hydropower<PROP>Pennsylvania<PROP>Environment<MANY>Biological Resources<SEP>Permit by Rule Guide<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Policy 2003-2 Implementation of CRS 37-92-308 Regarding Substitute Water Supply Plans<PROP>Geothermal<PROP>Colorado<PROP>Water Access<SEP>Policy Statement on Establishing License Terms for Hydroelectric Projects, 161 FERC ¶ 61,078 (2017)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Portland General Electric Co., 117 FERC ¶ 61,112 (2006)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Portland General Electric, 133 FERC ¶ 62,281 (2010)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Practice and Procedure Guide<PROP>Solar<PROP>California<PROP>Site Considerations<SEP>Pre-Construction Notification<PROP>Geothermal<PROP>New Mexico<PROP>Environment<SEP>Presidential Memorandum on Tribal Consultation<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>Procedural Handbook: Grants of Easement for Right-of-Way on Indian Lands<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Proponent’s Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects<PROP>Utilities<MANY>Bulk Transmission<PROP>California<PROP>Land Use<MANY>General Construction<MANY>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<MANY>Waste & Hazardous Material<MANY>Site Considerations<MANY>Transmission Siting & Interconnection<MANY>Biological Resources<MANY>Land Use Assessment<SEP>Public Service Co. of Colorado v. FERC, 754 F.2d 1555, 1565 (10th Cir. 1985)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Public Utilities Regulatory Policy Act, 16 U.S.C. §§ 2601-2645<PROP>Bulk Transmission<MANY>Utilities<PROP><PROP>Transmission Siting & Interconnection<SEP>Public Utility District No. 1 of Douglas County, Washington, 141 FERC ¶ 62,104 (2012)<PROP>Hydropower<MANY>Wind<PROP>US Federal<PROP>Power Plant<SEP>Quebec Department of Municipal Affairs, Regions, and Land Occupancy – Planning and Development Powers in Quebec Summary<PROP>Bulk Transmission<PROP>Quebec<PROP>Land Use<SEP>Quebec – Act Respecting Roads, R.S.Q. 1992, c. V-9<PROP>Bulk Transmission<PROP>Quebec<PROP>Land Access<SEP>Quebec – Authorization by Régie de L’énergie Regulation c. R-6.01, r. 2<PROP>Bulk Transmission<PROP>Quebec<PROP>Transmission Siting & Interconnection<SEP>Quebec – Decree Amending Conditions and Cases Requiring Authorization from Régie de L’énergie 789-2019<PROP>Bulk Transmission<PROP>Quebec<PROP>Transmission Siting & Interconnection<SEP>Quebec – Department of Municipal Affairs, Regions and Land Occupancy – Planning and Development Powers in Quebec Summary<PROP>Bulk Transmission<PROP>Quebec<PROP>Land Use<SEP>Quebec – Environmental Quality Act, R.S.Q., c. Q-2<PROP>Bulk Transmission<PROP>Quebec<PROP>Environment<SEP>Quebec – Land Use Planning and Development Act, R.S.Q. 2003, c. A-19.1<PROP>Bulk Transmission<PROP>Quebec<PROP>Land Use<SEP>Quebec – Regulation respecting the environmental impact assessment and review of certain projects, R.R.Q., c. Q-2, r. 23.1<PROP>Bulk Transmission<PROP>Quebec<PROP>Environment<SEP>Quebec – Rules of Procedure of the Régie de L’énergie c. R-6.01, r. 4.1<PROP>Bulk Transmission<PROP>Quebec<PROP>Transmission Siting & Interconnection<SEP>Quebec – Régie de L’énergie Act R.S.Q. 1996, c. R-6.01<PROP>Bulk Transmission<PROP>Quebec<PROP>Transmission Siting & Interconnection<SEP>Quebec – State Lands Act, R.S.Q. 1999, c. T-8.1<PROP>Bulk Transmission<PROP>Quebec<PROP>Land Use<SEP>Questions and Answers on the New England Flow Policy<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>RCRA Hazardous Waste Part A Permit Application Instructions and Form<PROP>Hydropower<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>RCRA Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23)<PROP>Geothermal<MANY>Solar<PROP>Colorado<PROP>Environment<MANY>Waste & Hazardous Material<SEP>RCRA Notification of Regulated Waste Activity (EPA Form 8700-12)<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Waste & Hazardous Material<SEP>RCRA Uniform Hazardous Waste Manifest (EPA Form 8700-22)<PROP>Geothermal<PROP>Idaho<PROP>Environment<MANY>Waste & Hazardous Material<SEP>RCW 18.104.048<PROP>Buildings<PROP>Washington<PROP>Water Access<SEP>RCW 90.03 Water Code<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>RCW 90.44 Regulation of public groundwaters<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>RCW 90.80 Water Conservancy Boards<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>RRC - Affidavit of Publication for surface disposal<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Water Quality<SEP>RRC - Drilling Permits Online Filing User's Guide webpage<PROP>Geothermal<PROP>Texas<PROP>Well Field<SEP>RRC - Injection/Disposal Well Permitting, Testing, and Monitoring manual<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Water Quality<SEP>RRC - Online Drilling Permit System Login webpage<PROP>Geothermal<PROP>Texas<PROP>Well Field<SEP>RRC - Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Water Quality<SEP>RRC - Surface Waste Management Manual<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Water Quality<SEP>RUS Bulletin 1794-A-600: Preparing an Environmental Report for Categorically Excluded Projects<PROP>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP>Environment<MANY>On Site Evaluation<SEP>RUS Bulletin 1794-A-603: Scoping Guide<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<SEP>RUS Bulletin 1794A-601: Preparing an Environmental Report for an Environmental Assessment<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<SEP>Reclamation Project Act of 1939<PROP>Hydropower<PROP>US Federal<PROP><SEP>Regional Water Board NPDES Program Manager<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Regional Water Quality Control Boards<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Access<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Relicensing Settlement Agreement for the Upper American River Project and the Chili Bar Hydroelectric Project (2007)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Renewable Energy Transmission Roadmap<PROP>Bulk Transmission<MANY>Solar<MANY>Utilities<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>Renewable Energy Vermont Website<PROP>Hydropower<PROP>Vermont<PROP><SEP>Renewable and Distributed Power in California Simplifying the Regulatory Maze – Making the Path for Future<PROP>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Wind<PROP>California<PROP>Transmission Siting & Interconnection<SEP>Report of Waste Discharge application (Form 200)<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>Report of the Task Force on Statewide Transmission Siting and Permitting (Colorado)<PROP>Bulk Transmission<MANY>Utilities<PROP>Colorado<PROP>Transmission Siting & Interconnection<SEP>Requirements for Petitions to Construct Electric and Gas Facilities Rule<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Resource Conservation and Recovery Act, 42 U.S.C. §§ 6901-6992k<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Rhode Island Coastal Resources Management Council Applications Forms and Fees<PROP>Bulk Transmission<MANY>Hydropower<PROP>Rhode Island<PROP>Land Access<MANY>General Construction<SEP>Rhode Island – 250-120 R.I. Code R. §§ 05-0–51, Air Pollution Control<PROP>Bulk Transmission<PROP>Rhode Island<PROP>Environment<MANY>Air Quality<SEP>Rhode Island – tit. 42 R.I. Gen. Laws §§ 98 et seq., Energy Facility Siting Act<PROP>Bulk Transmission<PROP>Rhode Island<PROP>Transmission Siting & Interconnection<SEP>Rivers and Harbors Act, 33 U.S.C. §§ 400-467n<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP><SEP>Rules and Regulations Board of Land Commissioners - Chapter 3<PROP>Bulk Transmission<PROP>Oregon<PROP>Land Access<SEP>Rules and Regulations for Permitting the Development and Appropriation of Geothermal Resources Through the Use of Wells<PROP>Geothermal<PROP>Colorado<PROP>Exploration<MANY>Well Field<SEP>Rural Electrification Act of 1936<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<SEP>SCRA Oversize/Overweight Permit Manual<PROP>Geothermal<PROP>New Mexico<PROP><SEP>SNC Lavalin – Highway Usage Permit Application<PROP>Bulk Transmission<PROP>New Brunswick<PROP>Land Access<SEP>SWRCB General NPDES Permits<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Water Quality<SEP>SWTC v. Arizona Corp. Comn, 142 P3d 1240 (2006)<PROP>Bulk Transmission<PROP>Arizona<PROP>Transmission Siting & Interconnection<SEP>Sacramento Municipal Utility District, 148 FERC ¶ 62,070 (2014)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Safe Drinking Water Act<PROP><PROP>US Federal<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Sample Plan of Development<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>Santa Fe Oversize/Overweight Permit Application<PROP>Geothermal<PROP>New Mexico<PROP><SEP>Saskatchewan Ministry of Environment – A Guide to Developing the Terms of Reference for a Development Under the Environmental Assessment Act<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan Ministry of Environment – Application for Crown Land Disposition Lease or Permit<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan Ministry of Environment – Environment Office Locations Webpage<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan Ministry of Environment – Environmental Assessment Process Webpage<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan Ministry of Environment – Environmental Assessment in Saskatchewan Guidance Under the Environmental Assessment Act<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan Ministry of Environment – Guidelines for an Environmental Assessment Webpage<PROP>Bulk Transmission<MANY>Wind<PROP><PROP><SEP>Saskatchewan Ministry of Environment – Public Participation in Saskatchewan’s Environmental Assessment Process<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan Ministry of Environment – Technical Proposal Guidelines: A Guide to Assessing Projects and Preparing Proposals Under the Environmental Assessment Act<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan Ministry of Environment – Technical Review Guidelines for Environmental Impact Assessments Under the Environmental Assessment Act<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan Ministry of Government Relations – A Guide to the Municipal Planning Process in Saskatchewan<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan Ministry of Government Relations – Citizens Guide to Shaping Council Decisions<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan Ministry of Government Relations – Proponent Handbook: Voluntary Engagement with First Nations and Metis Communities to Inform Duty to Consult<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Well Field<MANY>Environment<SEP>Saskatchewan Ministry of Highways and Infrastructure – Instructions for Applicants for Utility Permit<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan Ministry of Highways and Infrastructure – Roadside Development Permit Applications Webpage<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan Ministry of Highways and Infrastructure – Roadside Technician Area Contacts Map<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan Ministry of Highways and Infrastructure – Utility Permit Application<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan – Crown Resource Land Leases Webpage<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan – Crown Resource Land Regulations, OC 97/2017<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan – District of Katepwa Zoning Bylaw<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan – Environment Business Service Web Portal<PROP>Bulk Transmission<MANY>Geothermal<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan – Environmental Assessment Act, S.S.A. 1980, c. E-10.1<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Environment<SEP>Saskatchewan – Highways and Transportation Act, R.S.S. 1997, C. H-3.01<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan – Planning and Development Act, R.S.S. 2007, c. P-13.2<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan – Provincial Highway Designation Regulations, H-3 Reg. 17<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan – Provincial Lands Act, R.S.S. 2016, c. P-31.1<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Access<SEP>Saskatchewan – Statements of Provincial Interest Regulations, O.C. 172/2012<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan – Town of Biggar Zoning Bylaw<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan – Town of Churchbridge Zoning Bylaw<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Saskatchewan – Town of Outlook Zoning Bylaw<PROP>Bulk Transmission<PROP>Saskatchewan<PROP>Land Use<SEP>Sayles Hydro Associates v. Maughan 985 F.2d 451 (9th Cir. 1993)<PROP>Hydropower<PROP>California<PROP>Water Access<SEP>Secretary of Interior Standards for the Treatment of Historic Properties<PROP>Hydropower<PROP>Vermont<PROP>Site Considerations<SEP>Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>Section 14 of the Rivers and Harbors Act of 1899 (33 USC 408)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Environment<MANY>Land Use Assessment<SEP>Section 9 of the Rivers and Harbors Act of 1899 (33 USC 401)<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>Senate Bill No. 618<PROP>Solar<PROP>California<PROP>Land Use<SEP>Sikes Act<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>Simpson v. Bijou Irrigation Co., 69 P.3d 50 (Colo. 2003)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>Small Business Liability Relief and Brownfields Revitalization Act<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Snow v. Parsons, 28 Vt. 459, 460-64 (1856)<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Social Acceptance of Geothermal Energy in Southern Italy<PROP>Geothermal<PROP><PROP><SEP>Social Acceptance of Geothermal Power Generation in Japan<PROP>Geothermal<PROP><PROP><SEP>Solar Energy Plan of Development Outline<PROP>Solar<PROP><PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Solar PEIS<PROP>Smart Grid<MANY>Solar<PROP>US Federal<PROP><SEP>Solar Progammatic Environmental Impact Statement, Volume 1<PROP>Solar<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Solar Programmatic Environmental Impact Statement Record of Decision<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Solar-Use Easement<PROP>Solar<PROP>California<PROP>Land Use<SEP>Solar-Use Easement Advice<PROP>Solar<PROP>California<PROP>Land Use<SEP>Sole Source Aquifer Demonstration Program<PROP><PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Solid Waste Program Website<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Source Water and Groundwater Withdrawal Permit Application Process Guidance<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>South Carolina Department of Administration – Application for State Land Easement<PROP>Bulk Transmission<PROP>South Carolina<PROP>Land Access<SEP>South Carolina Department of Administration – Division of Facilities Management and Property Services, Easements Webpage<PROP>Bulk Transmission<PROP>South Carolina<PROP>Land Access<SEP>South Carolina Department of Administration – Sample State Land Easement<PROP>Bulk Transmission<PROP>South Carolina<PROP>Land Access<SEP>South Carolina – S.C. Code Ann. Regs. 61-62.1–62.99, Air Regulations and Standards<PROP>Bulk Transmission<PROP>South Carolina<PROP>Environment<MANY>Air Quality<SEP>South Carolina – S.C. Code Ann. §§ 1-11-10 – 1-11-780, Administration of the Government, Department of Administration<PROP>Bulk Transmission<PROP>South Carolina<PROP>Land Access<SEP>South Dakota Department of Environmental and Natural Resources – South Dakota Environmental Policy Act Memorandum<PROP>Bulk Transmission<PROP>South Dakota<PROP>Environment<MANY>On Site Evaluation<MANY>Biological Resources<SEP>South Dakota Department of Transportation – Application for Utility Permit<PROP>Bulk Transmission<PROP>South Dakota<PROP>Land Access<SEP>South Dakota – Department of Transportation – Application for Overhead Pole and Wire Occupancy Permit<PROP>Bulk Transmission<PROP>South Dakota<PROP>Land Access<SEP>South Dakota – Department of Transportation – Application for Permit to Occupy Right-of-Way<PROP>Bulk Transmission<PROP>South Dakota<PROP>Land Access<SEP>South Dakota – S.D. Admin. R. 74-36-01–21, Air Pollution Control Program<PROP>Bulk Transmission<PROP>South Dakota<PROP>Environment<MANY>Air Quality<SEP>Southern Great Plains Crucial Habitat Assessment Tool<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Colorado<MANY>Kansas<MANY>New Mexico<MANY>Oklahoma<MANY>Texas<PROP>Environment<MANY>Biological Resources<SEP>Southern Nevada Health District<PROP>Geothermal<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Special Use Lease<PROP>Geothermal<PROP>Washington<PROP>Exploration<SEP>Spill Prevention and Response Website<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Standardized Permit Guidance<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Environment<MANY>Waste & Hazardous Material<SEP>State Clearinghouse Handbook<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Environment<MANY>Land Use Assessment<SEP>State Electricity Profiles<PROP>Bulk Transmission<MANY>Utilities<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP>Transmission Siting & Interconnection<SEP>State Generation & Transmission Siting Directory<PROP>Bulk Transmission<MANY>Utilities<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP>Site Considerations<MANY>Transmission Siting & Interconnection<SEP>State Land Commission FAQ<PROP>Solar<PROP>California<PROP>Land Use<SEP>State Strategies for Accelerating Transmission Development for Renewable Energy<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>State ex rel. Spinner v. Kenosha County Bd. of Adjustment, 223 Wis. 2d 99, 105-6 (Ct. App. 1998)<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>State of Alaska Department of Transportation and Public Facilities - Application/Renewal for Encroachment Permit<PROP>Bulk Transmission<MANY>Geothermal<MANY>Utilities<PROP>Alaska<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>State of Alaska Department of Transportation and Public Facilities - Utility Permit<PROP>Utilities<MANY>Bulk Transmission<PROP>Alaska<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>State v. Kenosha County Bd. of Adjustment, 218 Wis. 2d (1998)<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>Step-by-Step Guide 2006<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Site Considerations<SEP>Stream Alteration General Permit<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Stream Alteration Individual Permit<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Stream Alteration Permits<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Streamlined Permitting Process for Renewable Energy Resources in Nevada<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Strobel v. Kerr Salt Co., 58 N.E. 142 (N.Y. 1900)<PROP>Hydropower<PROP>New York<PROP>Water Access<SEP>Successfully Streamlining Low-Impact Hydropower Permitting: Colorado’s Model for the Entire Country<PROP>Hydropower<PROP>Colorado<PROP>Power Plant<SEP>Suggested Practices for Avian Protection on Power Lines<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>Superfund Amendment and Reauthorization Act of 1986<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<MANY>Waste & Hazardous Material<SEP>Surface Transportation Assistance Act<PROP>Hydropower<PROP>US Federal<PROP><SEP>Sustainable Fisheries Act of 1996<PROP>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>Sustainable Groundwater Management Act of 2014<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>Symbiotics, LLC, 110 FERC ¶ 61,235 (2005)<PROP>Hydropower<PROP>US Federal<PROP>Site Considerations<SEP>Synder v. Waukesha County Zoning Bd. of Adjustment, 74 Wis. 2d at 475 (1976)<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>TCEQ - Map of Texas Groundwater Conservation Districts<PROP>Geothermal<PROP>Texas<PROP>Well Field<SEP>TCEQ - Texas Nonpoint Source Management Program Manual<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Water Quality<SEP>TCEQ Regional Offices<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>TCEQ Water Forms<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>TEEIC Laws and Regulations Applicable to Energy Transmission Development Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Land Access<SEP>TERA Application and Review Process Flowchart<PROP>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>TGLO - Application to Perform Seismic Work on State-Owned Land<PROP>Geothermal<PROP>Texas<PROP>Exploration<SEP>TGLO - Application to Prospect<PROP>Geothermal<PROP>Texas<PROP>Exploration<SEP>TGLO - Seismic Permitting webpage<PROP>Geothermal<PROP>Texas<PROP>Exploration<SEP>TNRC 33 - Management of Coastal Public Land<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP><PROP><SEP>TWDB Groundwater Conservation Districts website<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>Take Marine Mammals Permit Application Form 3-200-43<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Take of Eagles Permit 3-200-16<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Technical Assistance to Brownfields Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Technical Report of the Wild and Scenic Rivers Coordinating Council<PROP>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Environment<MANY>Aesthetic Resources<SEP>Template Implementing Agreement<PROP>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Temporary EPA ID Number Request<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Tennessee – Department of Environment and Conservation - Water Resources Dataviewer<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Aquatic Resource Alteration Permit Webpage<PROP>Hydropower<PROP>Tennessee<PROP>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Aquatic Resource Alteration Permit and 401 Water Quality Certification Application<PROP>Hydropower<PROP>Tennessee<PROP>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Construction Storm Water General Permit<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Construction Storm Water General Permit NOI<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Erosion and Sediment Control Handbook<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Inspection Certification Form<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Tennessee – Department of Environment and Conservation – Notice of Termination<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Tennessee – Department of Transportation – Authorized Permit Agency List<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<SEP>Tennessee – Department of Transportation – Oversize/Overweight FAQs<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<SEP>Tennessee – Department of Transportation – Route Survey Form<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<SEP>Tennessee – Department of Transportation – Single Trip Permit Request Form<PROP>Hydropower<MANY>Hydrogen<PROP>Tennessee<PROP>General Construction<SEP>Tennessee – Department of Transportation – Steps to Obtain a TN OS & OW Permit<PROP>Hydropower<PROP>Tennessee<PROP>General Construction<SEP>Tennessee – Tenn. Comp. R. & Regs. 1200-03-01–37, Division of Air Pollution Control<PROP>Bulk Transmission<PROP>Tennessee<PROP>Environment<MANY>Air Quality<SEP>Tennessee – Wildlife Resources Agency – Fishing Guide<PROP>Hydropower<PROP>Tennessee<PROP>Environment<MANY>Biological Resources<SEP>Tennessee – Wildlife Resources Agency – State Wildlife Action Plan<PROP>Hydropower<PROP>Tennessee<PROP>Environment<MANY>Biological Resources<SEP>Testing the Effectiveness of an Avian Flight Diverter for Reducing Avian Collissions with Distribution Power Lines in the Sacramento Valley, California<PROP>Bulk Transmission<MANY>Utilities<PROP>California<PROP>Transmission Siting & Interconnection<MANY>Environment<MANY>Biological Resources<SEP>Tex. Water Code, Title 2, Chapter 11 Water Rights<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>Texas Beachfront Construction Webpage<PROP>Geothermal<PROP>Texas<PROP>Environment<SEP>Texas Department of Transportation - Certification for Utility Accommodation<PROP>Bulk Transmission<PROP>Texas<PROP>Land Access<SEP>Texas Department of Transportation - Right of Way Forms webpage<PROP>Bulk Transmission<PROP>Texas<PROP>Land Access<SEP>Texas GLO Coastal Forms<PROP>Geothermal<PROP>Texas<PROP>Land Access<SEP>Texas GLO Highway Right of Way Leasing Forms<PROP>Geothermal<PROP>Texas<PROP>Land Access<SEP>Texas GLO Oil and Gas Sealed Bid Forms<PROP>Geothermal<PROP>Texas<PROP>Land Access<SEP>Texas GLO Rights of Way Forms<PROP>Geothermal<MANY>Smart Grid<PROP>Texas<PROP>Land Access<SEP>Texas General Land Office Local Permitting Authorities Webpage<PROP>Geothermal<PROP>Texas<PROP>Environment<SEP>Texas Petroleum Storage Tanks Webpage<PROP>Geothermal<PROP>Texas<PROP>Environment<SEP>Texas River Authority Website Links<PROP>Geothermal<PROP>Mississippi<MANY>Texas<PROP>Water Access<SEP>Texas Surface Water Quality Standards Webpage<PROP>Geothermal<PROP>Texas<PROP>Environment<MANY>Water Quality<SEP>Texas TNRC 141.003, Definitions for Geothermal Resources<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>Texas TWC 11, Water Rights<PROP>Geothermal<PROP>Texas<PROP>Water Access<SEP>Texas – 30 Tex. Admin. Code §§ 1.1–352.1431, Texas Commission on Environmental Quality Regulations<PROP>Bulk Transmission<PROP>Texas<PROP>Environment<MANY>Air Quality<SEP>Texas – 43 Tex. Admin. Code §§ 1.1-1.2, Organization and Responsibilities<PROP>Bulk Transmission<MANY>Geothermal<PROP>Texas<PROP>Land Access<SEP>Texas – 43 Tex. Admin. Code §§ 11.50-11.58, Access Connections to State Highways<PROP>Bulk Transmission<MANY>Geothermal<PROP>Texas<PROP>Land Access<SEP>The Bridge Act of 1906 (33 U.S.C. 491 - 498)<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>The Bureau of Land Management’s Well Information System (WIS) How-To Guide<PROP>Geothermal<PROP>US Federal<PROP>Exploration<MANY>Well Field<SEP>The City of Colorado Springs v. Yust, 126 Colo., 289 (1951)<PROP>Hydropower<PROP>Colorado<PROP>Water Access<SEP>The Design, Construction, and Operation of Long-Distance High-Voltage Electricity Transmission Technologies<PROP>Bulk Transmission<MANY>Utilities<PROP><PROP>Transmission Siting & Interconnection<MANY>Environment<MANY>Cultural Resources<MANY>Biological Resources<MANY>Land Use Assessment<MANY>Water Quality<MANY>Air Quality<MANY>Geological Resources<MANY>Aesthetic Resources<SEP>The Development of Small Hydroelectric Projects in Vermont<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Environment<MANY>Water Quality<SEP>The Environmental Protection Agency: Clean Water Act Section 319 Website<PROP>Geothermal<MANY>Hydropower<PROP>Colorado<PROP>Environment<MANY>Water Quality<SEP>The Fish and Wildlife Service Manual, Part 340 FW 3: Rights-of-Way and Road Closings<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>The Fish and Wildlife Service Manual, Part 603 FW 2<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>The General Bridge Act of 1946 (33 U.S.C. 525 - 533)<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>The International Bridge Act of 1972 (33 U.S.C. 535 et seq.)<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>The Law of Water<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>The Low Risk Site Handbook for Erosion Prevention and Sediment Control<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>The Magnuson-Stevens Fishery Conservation and Management Act (16 U.S.C. 1801 - 1891(d))<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<MANY>Land Use Assessment<SEP>The Marine Mammal Protection Act of 1972<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>The Noise Control Act of 1972 (42 U.S.C. 4901 et seq.)<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Aesthetic Resources<MANY>Land Use Assessment<SEP>The Role of the FERC’s Dam Safety Program with Small/Low Impact Hydropower Development<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>The U.S. Electric Transmission Grid: Essential Infrastructure in need of Comprehensive Legislation<PROP>Bulk Transmission<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 U.S.C. 61)<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP><SEP>The Vermont Shoreland Protection Act: A Handbook for Shoreland Development<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<MANY>Land Use Assessment<MANY>Water Quality<SEP>Title 10 USC 2667 Leases: non-excess property of military departments and Defense Agencies<PROP>Bulk Transmission<MANY>Solar<PROP>US Federal<PROP>Land Access<SEP>Title 10 USC 2684a Agreements to Limit Encroachments and Other Constraints on Military Training, Testing, and Operations<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>Title 10 USC 2917 Development of Geothermal Energy on Military Lands<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 11 Alaska Administrative Code Chapter 93 Water Management<PROP>Geothermal<PROP>Alaska<PROP>Water Access<SEP>Title 15 USC 3416 Judicial Review<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Plant Decommissioning<SEP>Title 16 U.S.C. 1278(a) Restrictions on Water Resources Projects<PROP>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Aesthetic Resources<SEP>Title 16 U.S.C. 824 - Declaration of policy, application of subchapter<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>US Federal<PROP>General Construction<MANY>Transmission Siting & Interconnection<SEP>Title 16 U.S.C. 824p<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Power Plant<MANY>Environment<MANY>Aesthetic Resources<SEP>Title 16 USC 1536 Interagency Cooperation<PROP>Geothermal<PROP>US Federal<PROP>Environment<SEP>Title 16 USC 1539 Exceptions<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Biological Resources<SEP>Title 16 USC 1600 Congressional Findings<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<SEP>Title 16 USC 2705 Simplified and Expeditious Licensing Procedures<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Title 16 USC 470a Historic Preservation Program<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 16 USC 5 Rights-of-way Through Parks or Reservations for Power and Communications Facilities<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Transmission Siting & Interconnection<SEP>Title 16 USC 703 Migratory Bird Treaty Act of 1918<PROP>Geothermal<PROP>US Federal<PROP>Environment<SEP>Title 16 USC 79 Rights-of-way for Public Utilities<PROP>Geothermal<MANY>Utilities<PROP>US Federal<PROP>Land Use<MANY>Transmission Siting & Interconnection<SEP>Title 16 USC 818 Public Lands Included in Project - Reservation of Lands From Entry<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 16 USC 823a Conduit Hydroelectric Facilities<PROP>Hydropower<PROP><PROP>Power Plant<SEP>Title 16 USC 823d Alternative Conditions and Prescriptions<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Title 16 USC 824a Interconnection and Coordination of Facilities, Emergencies, Transmission to Foreign Countries<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Site Considerations<MANY>Transmission Siting & Interconnection<SEP>Title 16 USC 824p Siting of Interstate Electric Transmission Facilities<PROP>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP>Site Considerations<MANY>Transmission Siting & Interconnection<SEP>Title 16 USC 825l Review of Orders<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Title 16 USC Chapter 35 - Endangered Species<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Title 18 CFR 385 Rules of Practice and Procedure<PROP>Geothermal<MANY>Hydrogen<MANY>Hydropower<PROP>US Federal<PROP>Plant Decommissioning<SEP>Title 18 CFR 4.102 Surrender of Exemption<PROP>Hydropower<PROP>US Federal<PROP>Plant Decommissioning<SEP>Title 18 CFR 4.95 Surrender of Exemption<PROP>Hydropower<PROP>US Federal<PROP>Plant Decommissioning<SEP>Title 18 CFR 6.2 Surrender of License<PROP>Hydropower<PROP>US Federal<PROP>Plant Decommissioning<SEP>Title 18 USC 641 Public Money, Property or Records<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Geological Resources<SEP>Title 23 CCR Waters<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>Title 23 USC 109 Standards<PROP>Geothermal<PROP>US Federal<PROP>Site Considerations<SEP>Title 25 U.S.C. 3504 - Leases, Business Agreements and Rights of Way Involving Energy Development or Transmission<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Title 25 USC 2218 Approval of Leases, Rights-of-way, and sales of natural resources<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Title 25 USC 323 Rights-of-way for all purposes across any Indian lands<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Title 25 USC 324 Consent of Certain Tribes; Consent of Individual Indians<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Title 25 USC 325 Payment and disposition of compensation<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Title 25 USC 3504 Leases, business agreements, and rights-of-way involving energy development or transmission<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Title 30 USC 1001 Geothermal Resources Definitions<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 30 USC 226 Lease of Oil and Gas Lands<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 33 USC 401 Construction of Bridges, Causeways, Dams or Dikes Generally; Exemptions<PROP>Geothermal<PROP>US Federal<PROP>Site Considerations<SEP>Title 33 USC 403 Obstruction of Navigable Waters Generally; Wharves; Piers, etc.; Excavations and Filling in<PROP>Geothermal<PROP>US Federal<PROP>Site Considerations<SEP>Title 33 USC 407 Deposit of Refuse in Navigable Waters Generally<PROP>Geothermal<PROP>US Federal<PROP>Environment<SEP>Title 40 CFR 1502 Environmental Impact Statement<PROP>Bulk Transmission<MANY>Geothermal<MANY>Smart Grid<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>Title 40 Code of Federal Regulations Part 71 Federal Operating Permit Programs<PROP>Geothermal<PROP>US Federal<PROP>Environment<MANY>Air Quality<SEP>Title 40 USC 102 Public Buildings, Property, and Works: Definitions<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Title 41 Alaska Statutes Chapter 6 Water Use Act<PROP>Geothermal<PROP>Alaska<PROP>Water Access<SEP>Title 42 USC 4332 Cooperation of Agencies, Reports, Availability of Information, Recommendations, International and National Coordination of Efforts<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Environment<SEP>Title 43 CFR 1600-1610 Planning, Programming, Budgeting<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 1601 Planning<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 1610 Resource Management Planning<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 2801.10<PROP>Hydropower<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3201.10 What Lands are Available for Geothermal Leasing?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3201.11 What Lands are Not Available for Geothermal Leasing?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3202.10 Who May Hold a Geothermal Lease?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3203.12 What Fees Must I Pay to Nominate Lands?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3204.10 What Payment Must I Submit With My Noncompetitive Lease Application?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3204.11 How May I Acquire a Noncompetitive Lease for Lands That Were Not Sold at a Competitive Lease Sale?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3204.5 How Can I Obtain a Noncompetitive Lease?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 CFR 3206.12 What are the Minimum and Maximum Lease Sizes?<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 U.S.C. 1764 General Requirements for Rights of Way<PROP>Solar<PROP>US Federal<PROP>Land Access<SEP>Title 43 USC 1331 Definitions for Subchapter III - Outer Continental Shelf Lands<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 USC 1702 Definitions<PROP>Geothermal<MANY>Bulk Transmission<MANY>Solar<MANY>Wind<PROP>US Federal<PROP>Land Use<SEP>Title 43 USC 387 Removal of Sand, Gravel, etc.; Leases, Easements, etc.<PROP>Geothermal<PROP>US Federal<PROP>Land Use<SEP>Title 43 USC 961 Rights-of-way Through Public Lands, Indian, and Other Reservations for Power and Communications Facilities<PROP>Geothermal<MANY>Utilities<PROP>US Federal<PROP>Land Use<MANY>Transmission Siting & Interconnection<SEP>Title 43 USC 961 Rights-of-way through public lands, Indian, and other reservations for power and communications facilities<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>Title 44 Part 60 Criteria for Land Management and Use<PROP>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Environment<MANY>Air Quality<SEP>Title 46 Alaska Statutes Chapter 15 Water Use Act<PROP>Geothermal<PROP>Alaska<PROP>Water Access<SEP>Title 48 CFR 1 Federal Acquisition Regulations System<PROP>Geothermal<PROP>US Federal<PROP>Environment<SEP>Title 49 USC 40103 Sovereignty and Use of Airspace<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Site Considerations<SEP>Title 49 USC 44718 Structures Interfering With Air Commerce<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Site Considerations<SEP>Title 7 USC 4201 General Provisions<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Environment<SEP>Title V Operation Permit Application Webpage<PROP>Geothermal<PROP>Alaska<PROP>Environment<MANY>Air Quality<SEP>Toxic Substances Control Act, 15 U.S.C. §§ 2601 - 2697<PROP>Buildings<MANY>Bulk Transmission<MANY>Solar<MANY>Utilities<MANY>Water<MANY>Wind<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>General Construction<MANY>Transmission Siting & Interconnection<MANY>Environment<MANY>On Site Evaluation<MANY>Biological Resources<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Transmission Siting and Permitting<PROP>Bulk Transmission<PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>Transmission Siting in Western United States: Overview and Recommendations Prepared as Information to the Western Interstate Energy Board<PROP>Bulk Transmission<PROP>Arizona<MANY>California<MANY>Colorado<MANY>Idaho<MANY>Montana<MANY>Nebraska<MANY>New Mexico<MANY>Oregon<MANY>Utah<MANY>Washington<MANY>Wyoming<PROP>Transmission Siting & Interconnection<SEP>Transmission Siting in the Western United States<PROP>Bulk Transmission<PROP>Alaska<MANY>California<MANY>Colorado<MANY>Idaho<MANY>Montana<MANY>Nevada<MANY>New Mexico<MANY>Oregon<MANY>Utah<MANY>Washington<MANY>Wyoming<PROP>Site Considerations<SEP>Transmission Vegetation Management NERC Standard FAC-003-2 Technical Reference<PROP>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP>Transmission Siting & Interconnection<MANY>Environment<MANY>Biological Resources<SEP>Transportation Research Board Highway Capacity Manual<PROP>Geothermal<MANY>Hydropower<PROP>Alaska<PROP>Land Access<SEP>Tribal Energy and Environmental Information<PROP>Solar<PROP>California<PROP>Land Access<SEP>Tribal Energy and Environmental Information Clearinghouse - Laws and Regulations Applicable to Geothermal Energy Development webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>Tribal Energy and Environmental Information Clearinghouse webpage<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Cultural Resources<SEP>TxDOT Access Management Manual<PROP>Bulk Transmission<PROP>Texas<PROP>Land Access<SEP>U.S Department of Energy – An Assessment of Energy Potential at Non-Powered Dams in the United States Report<PROP>Hydropower<PROP>US Federal<PROP><SEP>U.S. Army Corps of Engineers - Application for Department of Army Permit (Form 4345)<PROP>Geothermal<MANY>Hydropower<MANY>Solar<PROP><PROP>Environment<MANY>Land Use Assessment<SEP>U.S. Army Corps of Engineers – ENG Form 4345<PROP>Hydropower<PROP>Missouri<PROP><SEP>U.S. Army Corps of Engineers – Hydropower Resource Assessment at Non-Powered USACE Sites Report<PROP>Hydropower<PROP>US Federal<PROP><SEP>U.S. Army Corps of Engineers – Nationwide Permit Information Webpage<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>U.S. Department of Energy – 2014 Hydropower Market Report<PROP>Hydropower<PROP>Washington<PROP><SEP>U.S. Department of Energy – 2016 Hydropower Vision Report<PROP>Hydropower<PROP>US Federal<PROP><SEP>U.S. Department of the Interior - Managing the NEPA Process, National Park Service<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<SEP>U.S. EPA Region 10<PROP>Geothermal<PROP>Idaho<PROP>Environment<SEP>U.S. Energy Information Administration Electric Power Annual Report<PROP>Hydropower<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP><SEP>U.S. Energy Information Administration – Alaska State Profile<PROP>Hydropower<PROP>Alaska<PROP><SEP>U.S. Energy Information Administration – Indiana State Profile and Energy Estimates<PROP>Hydropower<PROP>Indiana<PROP><SEP>U.S. Energy Information Administration – Kentucky State Energy Profile<PROP>Hydropower<PROP>Kentucky<PROP><SEP>U.S. Energy Information Administration – Kentucky State Profile and Energy Estimates<PROP>Hydropower<PROP>Kentucky<PROP><SEP>U.S. Energy Information Administration – New York State Energy Profile<PROP>Hydropower<PROP>New York<PROP><SEP>U.S. Energy Information Administration – Ohio State Profile and Energy Estimates<PROP>Hydropower<PROP>Ohio<PROP><SEP>U.S. Energy Information Administration – Pennsylvania State Profile and Energy Estimates<PROP>Hydropower<PROP>Pennsylvania<PROP><SEP>U.S. Energy Information Administration – Tennessee State Profile and Energy Estimates<PROP>Hydropower<PROP>Tennessee<PROP><SEP>U.S. Energy Information Administration – Washington State Energy Profile<PROP>Hydropower<PROP>Washington<PROP><SEP>U.S. Energy Information Administration – West Virginia State Profile and Energy Estimates<PROP>Hydropower<PROP>West Virginia<PROP><SEP>U.S. Energy Information Administration, 2015 Colorado State Profile<PROP>Hydropower<PROP>Colorado<PROP><SEP>U.S. Energy Mapping System<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<PROP>Arizona<MANY>Alabama<MANY>Alaska<MANY>Arkansas<MANY>California<MANY>Colorado<MANY>Connecticut<MANY>Delaware<MANY>Florida<MANY>Georgia<MANY>Hawaii<MANY>Idaho<MANY>Illinois<MANY>Indiana<MANY>Iowa<MANY>Kansas<MANY>Kentucky<MANY>Louisiana<MANY>Maine<MANY>Maryland<MANY>Massachusetts<MANY>Michigan<MANY>Minnesota<MANY>Mississippi<MANY>Missouri<MANY>Montana<MANY>Nebraska<MANY>Nevada<MANY>New Hampshire<MANY>New Jersey<MANY>New Mexico<MANY>New York<MANY>North Carolina<MANY>North Dakota<MANY>Ohio<MANY>Oklahoma<MANY>Oregon<MANY>Pennsylvania<MANY>Rhode Island<MANY>South Carolina<MANY>South Dakota<MANY>Tennessee<MANY>Texas<MANY>Utah<MANY>Vermont<MANY>Virginia<MANY>Washington<MANY>West Virginia<MANY>Wisconsin<MANY>Wyoming<PROP>Transmission Siting & Interconnection<SEP>U.S. Environmental Protection Agency - Spill Prevention, Control, and Countermeasure FAQ Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<MANY>Waste & Hazardous Material<SEP>U.S. Environmental Protection Agency – Developing Your Storm Water Pollution Prevention Plan<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>U.S. Fish and Wildlife Service and National Marine Fisheries Service - Endangered Species Act Consultation Handbook<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<MANY>Biological Resources<SEP>U.S. General Services Administration - Form SF299<PROP>Bulk Transmission<MANY>Geothermal<MANY>Utilities<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>UC 73-3 - Water Appropriation<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>UDOT - Statewide Utility License Agreements<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Utah<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>UEPA Guide for Applicants - Electric Facilities<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<SEP>UEPA Guide for Applicants – Electric Facilities<PROP>Geothermal<MANY>Solar<PROP>Nevada<PROP>Environment<SEP>UPDES General Permit for Discharges from Construction Activities (Permit No. UTRC00000)<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>General Construction<SEP>UPDES Storm Water Permits: General Construction Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>General Construction<SEP>US Army Corps of Engineers Website<PROP>Geothermal<PROP>US Federal<PROP>Environment<MANY>Water Quality<SEP>US Fish and Wildlife Service Hydropower Licensing webpage<PROP>Hydropower<PROP>US Federal<PROP>Land Access<MANY>Environment<SEP>USACE 2012 Nationwide Permits<PROP>Hydropower<PROP><PROP><SEP>USACE EC 1165-2-216 Policy and Procedural Guidance for Processing Requests to Alter USACE Civil Works Projects Pursuant to 33 USC 408<PROP>Hydropower<PROP><PROP>Power Plant<MANY>Environment<MANY>Land Use Assessment<SEP>USACE Engineer Regulation 1110-2-1454 Corps Responsibilities for Non-Federal Hydroelectric Power Development under the Federal Power Act<PROP>Hydropower<PROP>US Federal<PROP>Land Access<SEP>USCG NEPA Handbook<PROP>Bulk Transmission<MANY>Utilities<PROP>US Federal<PROP><SEP>USDA - NRCS Farmland Conversion Impact Rating for Corridor Type Projects - Form NRCS-CPA-106<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>USDA - NRCS Land Evaluation and Site Assessment: Guidebook<PROP>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>USDA NRCS<PROP>Solar<PROP>California<PROP>Land Use<SEP>USDOI - Memorandum 37005<PROP><PROP>US Federal<PROP>Transmission Siting & Interconnection<SEP>USFS Electric Transmission Line Easement Form FS-2700-31<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>USFS West Wide Programmatic Environmental Impact Statement Record of Decision<PROP>Bulk Transmission<PROP>US Federal<PROP>Land Access<SEP>United States Army Corps of Engineers - Army Permit Application Instructions<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP><PROP>Environment<MANY>Land Use Assessment<SEP>United States Army Corps of Engineers - Procedures for Implementing the National Environmental Policy Act (ER 200-2-2)<PROP>Hydropower<PROP><PROP>Environment<SEP>United States Coast Guard Bridge Administration Manual<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>United States Coast Guard Bridge Permit Application Guide<PROP>Geothermal<MANY>Solar<PROP>US Federal<PROP>Environment<MANY>Land Use Assessment<SEP>United States Department of Agriculture Predicting Soil Erosion by Water: A Guide to Conservation Planning With the Revised Universal Soil Loss Equation (RUSLE)<PROP>Hydropower<PROP>Missouri<PROP>General Construction<SEP>United States Department of the Interior - Directors Order 53 - Special Park Uses<PROP>Bulk Transmission<MANY>Geothermal<MANY>Utilities<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>United States Department of the Interior - RM-53 - Reference Manual - Special Park Uses<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<MANY>Hydropower<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>United States Environmental Protection Agency – National Pollutant Discharge Elimination (NPDES) Construction Stormwater Discharges Webpage<PROP>Hydropower<PROP>US Federal<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>United States Fish and Wildlife Service - Endangered Species Act of 1973<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>United States Fish and Wildlife Service - Habitat Conservation Plans Under the Endangered Species Act<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>United States Forest Service - Forest Service Environmental Appeals Responses<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>United States Forest Service - Forest Service NEPA Procedures and Guidance<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>United States Forest Service - Forest Service Schedule of Proposed Actions<PROP>Geothermal<MANY>Bulk Transmission<PROP>US Federal<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Utah - T-223 Application for Right-of-Way Encroachment Permit<PROP>Geothermal<MANY>Bulk Transmission<PROP>Utah<PROP>Land Access<SEP>Utah - UC 54-14 - Utility Facility Review Board Act<PROP>Bulk Transmission<PROP>Utah<PROP>Land Access<SEP>Utah - UC 54-2 - Public Utilities Definitions<PROP>Utilities<MANY>Bulk Transmission<PROP>Utah<PROP>Land Access<SEP>Utah - Utah Dept. of Transportation - Accommodation of Utilities and the Control and Protection of State Highway Rights of Way<PROP>Bulk Transmission<PROP>Utah<PROP>Land Access<SEP>Utah Air Guidance Documents Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Air Quality<SEP>Utah Antidegradation FAQ<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utah Antidegradation Review Form<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utah Antidegradation Review Implementation Guidance<PROP>Geothermal<MANY>Solar<MANY>Water<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utah Application to Appropriate Water<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah Code Annotated<PROP>Geothermal<MANY>Utilities<MANY>Bulk Transmission<PROP>Utah<PROP>Land Use<MANY>Land Access<MANY>Site Considerations<SEP>Utah Code Title 73, Chapter 3, Appropriation<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah DEQ Air Permitting Branch Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Air Quality<SEP>Utah DEQ Energy Pre-Design Program<PROP>Geothermal<PROP>Utah<PROP>Land Use<MANY>Land Access<MANY>Exploration<MANY>Well Field<MANY>General Construction<MANY>Environment<MANY>Water Access<MANY>Site Considerations<MANY>Transmission Siting & Interconnection<SEP>Utah DEQ Website<PROP>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utah Department of Environmental Quality Forms Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<SEP>Utah Department of Environmental Quality Hazardous Waste Permits Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Utah Division of Environmental Response and Remediation Underground Storage Tank Branch Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Utah Division of Water Rights Information Webpage<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah Full Proof of Beneficial Use of Water<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah Geothermal Institutional Handbook<PROP>Geothermal<PROP>Utah<PROP><SEP>Utah Geothermal Presentation Bloomquist<PROP>Geothermal<PROP>Utah<PROP><SEP>Utah Nonpoint Source Pollution Management Plan<PROP>Geothermal<MANY>Solar<MANY>Bulk Transmission<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utah Proof of Beneficial Use of Water Application<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah Rules of Appellate Procedure<PROP>Geothermal<MANY>Solar<MANY>Utilities<MANY>Bulk Transmission<PROP>Utah<PROP>Land Use<MANY>Land Access<MANY>Power Plant<MANY>Site Considerations<SEP>Utah Sensitive Species List Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Cultural Resources<SEP>Utah Simple Proof of Beneficial Use of Water Application<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah State Historic Preservation Office Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Cultural Resources<SEP>Utah UC 54-18, Siting of High Voltage Power Line Act<PROP>Geothermal<MANY>Utilities<PROP>Utah<PROP>Transmission Siting & Interconnection<SEP>Utah UC 54-2-1, Public Utilities Definitions<PROP>Geothermal<MANY>Utilities<PROP>Utah<PROP>Transmission Siting & Interconnection<SEP>Utah Underground Injection Control Program Webpage<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Utah Underground Storage Tank Installation Permit<PROP>Geothermal<PROP>Utah<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Utah Water Quality Standards Workgroup Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utah Water Right Information Webpage<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah Water Rights Fee Schedule<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah Water Rights Flowchart<PROP>Geothermal<PROP>Utah<PROP>Water Access<SEP>Utah – Utah Admin. Code r. R307-101–842, Environmental Quality, Air Quality<PROP>Bulk Transmission<PROP>Utah<PROP>Environment<MANY>Air Quality<SEP>Utah's Public Notice Website<PROP>Geothermal<MANY>Solar<PROP>Utah<PROP>Environment<MANY>Water Quality<SEP>Utility Accommodation Permit Application<PROP>Bulk Transmission<PROP>Minnesota<PROP>Land Access<SEP>Utility Policy Guidebook<PROP>Bulk Transmission<PROP>Iowa<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<MANY>Transmission Siting & Interconnection<SEP>Vermont Act 250<PROP><PROP>Vermont<PROP>Land Use<SEP>Vermont Agency for Natural Resources Hydropower Facility Licensing Factsheet<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Vermont Agency of Commerce and Community Development’s Criteria for Evaluating the Effect of Proposed Telecommunications Facilities, Transmission Lines, and Wind Power Facilities on Historic Resources<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Cultural Resources<SEP>Vermont Agency of Natural Resources Community Energy Dashboard<PROP>Hydropower<PROP>Vermont<PROP>Land Access<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Agency of Natural Resources Department of Environmental Conservation Section 401 Water Quality Certification Practice<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Agency of Natural Resources Flood Hazard Area & River Corridor Permit Guidance<PROP>Hydropower<PROP>Vermont<PROP>Land Access<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Agency of Natural Resources Floodplain Manager Regions<PROP>Hydropower<PROP>Vermont<PROP>Land Access<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Agency of Natural Resources Permitting Energy Generation Projects<PROP>Hydropower<PROP>Vermont<PROP>General Construction<SEP>Vermont Agency of Natural Resources Policy: Use of State Lands<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Vermont Agency of Natural Resources Procedure for Determining Acceptable Minimum Stream Flows<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Agency of Transportation Access Management Program Guidelines<PROP>Hydropower<PROP>Vermont<PROP>Land Access<MANY>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Agency of Transportation EPSC Protocol<PROP>Water<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Agency of Transportation Highway Permit Application Information<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Land Use Assessment<SEP>Vermont Agency of Transportation Right of Way Manual<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Agency of Transportation Work Within Highway Rights-of-Way Guidance<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Application for Individual Section 401 Water Quality Certification<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Community Energy Dashboard Website<PROP>Hydropower<PROP>Vermont<PROP><SEP>Vermont Conditionally Exempt Generator Handbook: A Hazardous Waste Management Guide for Smaller Vermont Business<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Vermont Construction and Operation of Net Metering Systems Rule<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Department of Energy Conservation<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Environment<MANY>Water Quality<SEP>Vermont Department of Environmental Conservation Environmental Notice Bulletin<PROP>Hydropower<PROP>Vermont<PROP>Environment<SEP>Vermont Department of Environmental Conservation, Watershed Management Division Surface Water Management Strategy<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Vermont Department of Environmental Conservation, Watershed Management Division Surface Water Management Strategy Website<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Vermont Drinking Water and Groundwater Protection Division Permit Fees<PROP>Hydropower<PROP>Vermont<PROP><SEP>Vermont Environmental Notice Bulletin<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont FPR: Land and Water Conservation Fund<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Vermont Flood Hazard Area & River Corridor General Permit<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Flood Hazard Area and River Corridor General Permit Application<PROP>Hydropower<PROP>Vermont<PROP>Exploration<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Flood Hazard Area and River Corridor Individual Permit Application<PROP>Hydropower<PROP>Vermont<PROP>Land Access<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Flood Hazard Area and River Corridor Protection Procedure<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Flood Hazard Area and River Corridor Rule<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont Flood Hazard and River Corridor General Permit Notice-Reporting Without Application Category Form<PROP>Hydropower<PROP>Vermont<PROP>Site Considerations<MANY>Environment<MANY>Land Use Assessment<SEP>Vermont General Stormwater Discharge to Waters that are Not Principally Impaired by Stormwater Runoff Permit Instructions<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont General Wetland Permit (3-9025) Instructions<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<SEP>Vermont Groundwater Withdrawal Report<PROP><PROP>Vermont<PROP>Water Access<SEP>Vermont Hazardous Waste Handler Site ID Form<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Vermont Hazardous Waste Management Regulations<PROP>Bulk Transmission<MANY>Hydropower<PROP>Vermont<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Vermont Historic Preservation Act Rules<PROP>Hydropower<PROP>Vermont<PROP>Site Considerations<SEP>Vermont Historic Preservation Project Review Cover Form<PROP>Hydropower<PROP>Vermont<PROP>Site Considerations<SEP>Vermont Individual Lake Encroachment Permit<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Individual Stormwater Discharge Permit Application<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Vermont Instructions for Preparing the VT Hazardous Waste Handler Site ID Form<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Vermont Land Use: Essentials of Local Land Use Planning and Regulation<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Vermont Minor Amendment Application for Groundwater<PROP>Hydropower<PROP>Vermont<PROP>Water Access<SEP>Vermont NPDES Stormwater Permit Project Risk Evaluation<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Vermont Natural Resources Board: Act 250 Permit and License Information<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Vermont Permit and License Information, Work in a State Highway Right of Way<PROP>Hydropower<PROP>Vermont<PROP>Land Access<SEP>Vermont Permit and License Information: NPDES Stormwater General Permits for Construction Sites<PROP>Hydropower<PROP>Vermont<PROP>General Construction<SEP>Vermont Public Service Board Rule<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Public Utility Commission - Net-Metering Rule 5.100<PROP>Bulk Transmission<MANY>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Rules and Instructions Governing Overweight and Overdimension Vehicle Permits<PROP>Hydropower<PROP>Vermont<PROP>General Construction<SEP>Vermont Section 401 Water Quality Certification Program<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Environment<MANY>Water Quality<SEP>Vermont Shoreland Protection Act<PROP><PROP>Vermont<PROP>Land Use<MANY>Environment<MANY>Water Quality<SEP>Vermont Small Hydropower Assistance Program Application<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Water Quality<SEP>Vermont Small Hydropower Assistance Program Overview<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Water Quality<SEP>Vermont Small Hydropower Assistance Program Screening Criteria Summary and Application Instructions<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Water Quality<SEP>Vermont Small Hydropower Assistance Program Site-Specific Determinations Summary<PROP>Hydropower<PROP>Vermont<PROP>Site Considerations<SEP>Vermont Small Hydropower Assistance Program Summary<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Vermont Small Hydropower Assistance Program Website<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>On Site Evaluation<MANY>Cultural Resources<MANY>Water Quality<SEP>Vermont Source Testing Review<PROP>Hydropower<PROP>Vermont<PROP>Site Considerations<MANY>Environment<MANY>Water Access<MANY>Biological Resources<MANY>Water Quality<SEP>Vermont Standards and Specifications for Erosion Prevention and Sediment Control<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Vermont State Lands Administration: Application Page<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Vermont Stormwater Management Manual Volume I<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Stormwater Management Manual Volume II<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Stormwater Management Rule<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Stormwater Management Rule for Stormwater-Impaired Waters<PROP>Hydropower<PROP>Vermont<PROP>General Construction<MANY>Power Plant<MANY>Environment<MANY>Water Quality<MANY>Waste & Hazardous Material<SEP>Vermont Stream Alteration Rule<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Land Use Assessment<MANY>Water Quality<SEP>Vermont Underground Injection Control Rule<PROP>Hydropower<PROP>Vermont<PROP><SEP>Vermont Waste Transportation Permit and License Information<PROP>Hydropower<PROP>Vermont<PROP>Land Use<SEP>Vermont Water Quality Certification Application for Hydroelectric Facilities<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Water Quality Standards<PROP>Hydropower<PROP>Vermont<PROP>Power Plant<MANY>Environment<MANY>Water Quality<SEP>Vermont Watershed Management Rivers Program Website<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Land Use Assessment<MANY>Water Quality<SEP>Vermont Wetland General Permit (3-9025)<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Quality<SEP>Vermont Wetland Permit/Determination Application<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<SEP>Vermont Wetland Program Individual Permit Application Instructions<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<SEP>Vermont Wetland Rules<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Land Use Assessment<MANY>Water Quality<SEP>Vermont Wetlands Contact and Inquiry Portal<PROP>Hydropower<PROP>Vermont<PROP>Land Use<MANY>Environment<MANY>Water Quality<SEP>Vermont – 12-031-001 Vt. Code R. §§ 5-101–1109, Air Pollution Control<PROP>Bulk Transmission<PROP>Vermont<PROP>Environment<MANY>Air Quality<SEP>Virginia – 9 Va. Admin. Code §§ 5-5–540, State Air Pollution Control Board<PROP>Bulk Transmission<PROP>Virginia<PROP>Environment<MANY>Air Quality<SEP>Virginia – Virginia State Corporation Commission Transmission Line Staff Guidance on Ordinary vs. Non-Ordinary Extension Projects<PROP>Bulk Transmission<PROP>Virginia<PROP>Transmission Siting & Interconnection<SEP>WAC 173-160-151<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>WSDE Air Operating Permit Application and Instructions<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>WSDE Air Operating Permits Register Entries webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>WSDE Change or Transfer a Water Right Forms<PROP>Water<PROP>Washington<PROP>Water Access<SEP>WSDE Class V Wells that Automatically Meet Non-Endangerment Standard<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>WSDE Nationwide Permit webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>WSDE New Water Right Forms<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>WSDE Online System for Registering UIC Wells webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>WSDE Permit Application Forms webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>WSDE Underground Injection Control Well Registration Form<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>WSDE Underground Storage Tank Program webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>WSDE Water Resources website<PROP>Geothermal<PROP>Washington<PROP>Water Access<SEP>WSDNR Forms<PROP>Geothermal<PROP>Washington<PROP>Exploration<MANY>Well Field<SEP>WSDNR Oil and Gas Forms<PROP>Geothermal<PROP>Washington<PROP>Land Access<SEP>WSDNR Rights-of-Way Forms<PROP>Geothermal<PROP>Washington<PROP>Land Access<SEP>Warren-Alquist Energy Resources Conservation and Development Act<PROP>Geothermal<MANY>Solar<PROP>California<PROP>Site Considerations<SEP>Washington - Joint Aquatic Resources Permit Application<PROP>Hydropower<PROP>Washington<PROP>Land Access<SEP>Washington Air Quality Notice of Construction Permit Regulatory Handbook<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>Washington Coastal Zone Management Program Document<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Washington Coastal Zone Management Regulatory Handbook<PROP>Geothermal<PROP>Washington<PROP>Environment<SEP>Washington Coastal Zone Management Webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<SEP>Washington Department of Commerce Short Course on Local Planning Resource Guide<PROP>Hydropower<PROP>Washington<PROP>Land Use<SEP>Washington Department of Ecology - Application for Change/Transfer of a Water Right<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology - Proof of Appropriation of Water<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology - Water Right Pre-Application Consultation Form<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology Certified Water Right Examiner Program Website<PROP>Water<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology State Environmental Policy Act Online Handbook<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<SEP>Washington Department of Ecology – Application for a Reservoir Permit<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Apply for New Water Right Webpage<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Apply to Change or Transfer a Water Right or Claim Webpage<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Changing or Transferring an Existing Water Right<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Coastal Zone Management Federal Consistency Webpage<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Washington Department of Ecology – Determination of Consistency with Washington’s Coastal Zone Management Program for Federal Agency Activities Form<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Washington Department of Ecology – Federal Permits Home<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Washington Department of Ecology – Inventory of Dams<PROP>Hydropower<PROP>Washington<PROP><SEP>Washington Department of Ecology – New Water Right Webpage<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Underground Storage Tanks Webpage<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Washington Department of Ecology – Water Resources Program Policy, Consumptive and Non-Consumptive Water Use<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Water Right Change Webpage<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Water Right and Water Right Change Reports of Examination Webpage<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Ecology – Water Rights Processing Procedures<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Fish and Wildlife – Aquatic Protection Permitting System<PROP>Hydropower<PROP>Washington<PROP>Environment<SEP>Washington Department of Fish and Wildlife – Hydraulic Project Approval Simplified Application<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Department of Fish and Wildlife – Hydroelectric Power Webpage<PROP>Hydropower<PROP>Washington<PROP>Environment<SEP>Washington Department of Natural Resources – Forest Practices Illustrated Guide to Forest Practices Rules<PROP>Hydropower<PROP>Washington<PROP>Land Access<SEP>Washington Energy Facility Site Evalutation Council - Generalized Siting Process<PROP>Utilities<MANY>Bulk Transmission<PROP>Washington<PROP>Site Considerations<SEP>Washington Energy Facility Site Evalutation Council - Siting and Review Process<PROP>Utilities<MANY>Bulk Transmission<PROP>Washington<PROP>Land Use<MANY>Site Considerations<MANY>Environment<SEP>Washington Environmental Permit Handbook - 401 Water Quality Certification<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>Washington Environmental Permit Handbook - Air Operating Permit<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>Washington Environmental Permit Handbook - Dangerous Waste Treatment Storage Disposal Facility New Permit<PROP>Bulk Transmission<MANY>Geothermal<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Washington Environmental Permit Handbook - Geothermal Drilling Permit<PROP>Geothermal<PROP>Washington<PROP>Exploration<MANY>Well Field<SEP>Washington Environmental Permit Handbook - NPDES Construction Stormwater General Permit<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>Washington Environmental Permit Handbook - NPDES General Permit Coverage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>Washington Environmental Permit Handbook - NPDES Individual Permit Coverage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>Washington Environmental Permit Handbook - Underground Injection Control Registration webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Water Quality<SEP>Washington Governor’s Office for Regulatory Innovation and Assistance – Aquatic Use Authorization<PROP>Hydropower<PROP>Washington<PROP>Land Access<SEP>Washington Governor’s Office for Regulatory Innovation and Assistance – Coastal Zone Management (CZM) Federal Consistency Schematic<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Washington Governor’s Office for Regulatory Innovation and Assistance – Shoreline Conditional Use Permit and Variance Schematics<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington Governor’s Office for Regulatory Innovation and Assistance – Shoreline Substantial Development Permit Schematic<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Land Use Assessment<SEP>Washington Governor’s Office of Regulatory Innovation and Assistance – Underground Storage Tank Facility Compliance Tag/Permit<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Washington Governor’s Office of Regulatory Innovation and Assistance – Underground Storage Tank Notification Requirements<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Washington Joint Aquatic Resources Permit Application<PROP><PROP>Washington<PROP><SEP>Washington Notice of Construction Application under New Source Review (Form ECY 070-410)<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>Washington Pollution Control Hearings Board webpage<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>Washington Priority Habitats and Species on the Web<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Department of Archaeology and Historic Preservation Archaeological Permitting Webpage<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Cultural Resources<SEP>Washington State Department of Ecology - Underground Storage Tank 30-Day Notice Form<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Washington State Department of Ecology Application for Change/Transfer of a Water Right<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington State Department of Ecology Designated Uses for Waters of the State<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Department of Ecology Instream Flow Laws and Rules Webpage<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington State Department of Ecology Water Right Fee Estimator Website<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington State Department of Fish and Wildlife Draft Fishway Guidelines for Washington State<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Department of Fish and Wildlife Draft Hydroelectric Project Assessment Guidelines<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Department of Fish and Wildlife Draft Mitigation Policy<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Energy Facility Site Evaluation Council – Siting Review Process Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Transmission Siting & Interconnection<SEP>Washington State Environmental Policy Act<PROP><PROP>Washington<PROP>Environment<SEP>Washington State Environmental Policy Act Form Templates<PROP>Bulk Transmission<MANY>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<SEP>Washington State Priority Habitats and Species List<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Species of Concern Lists<PROP>Geothermal<PROP>Washington<PROP>Environment<MANY>Biological Resources<SEP>Washington State Tribal Directory<PROP>Hydropower<PROP>Washington<PROP>Environment<MANY>Water Access<MANY>Cultural Resources<MANY>Water Quality<SEP>Washington W.A.C. - §§ 173-360A et seq., Underground Storage Tank Regulations<PROP>Hydropower<PROP>Washington<PROP>Land Use<MANY>Power Plant<SEP>Washington – Department of Ecology - Application for a Water Right Permit<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington – Wash. Admin. Code §§ 173-360A et seq., Underground Storage Tank Regulations<PROP>Geothermal<MANY>Hydropower<PROP>Washington<PROP>Environment<MANY>Waste & Hazardous Material<SEP>Washington – Wash. Admin. Code §§ 173-400–495, Air Quality Regulations<PROP>Bulk Transmission<PROP>Washington<PROP>Environment<MANY>Air Quality<SEP>Washington – Wash. Rev. Code §§ 77.55 et seq., Construction Projects in State Waters<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Washington – Wash. Rev. Code §§ 90.03 et seq., Water Code<PROP>Hydropower<PROP>Washington<PROP>Water Access<SEP>Water Districts and Associations in California<PROP>Geothermal<MANY>Solar<MANY>Hydropower<PROP>California<PROP>Water Access<SEP>Water Law and Management in Oklahoma<PROP>Hydropower<PROP>Oklahoma<PROP>Water Access<SEP>West Virginia – Department of Environmental Protection – 401 Water Quality Certification Application<PROP>Hydropower<PROP>West Virginia<PROP>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – 401 Water Quality Certification Application Instructions<PROP>Hydropower<PROP>West Virginia<PROP>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Construction Stormwater General Permit<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Construction Stormwater General Permit NOI<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Construction Stormwater General Permit NOI Instructions<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Construction Stormwater General Permit Site Registration Application Form<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Construction Stormwater General Permit Site Registration Application Form Instructions<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Electronic Submission System<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Interactive Maps for Tier 3 Streams<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Notice of Termination<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Environmental Protection – Public Notice Sign Template<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>West Virginia – Department of Transportation – Construction List<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<SEP>West Virginia – Department of Transportation – Oversize/Overweight Permit Information<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<SEP>West Virginia – Department of Transportation – WVDOT at GotPermits.com<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<SEP>West Virginia – Department of Transportation – Weight and Clearance Restriction List<PROP>Hydropower<PROP>West Virginia<PROP>General Construction<SEP>West Virginia – Division of Natural Resources – Fishing and Boating Guide<PROP>Hydropower<PROP>West Virginia<PROP>Environment<MANY>Biological Resources<SEP>West Virginia – Division of Natural Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>West Virginia<PROP>Environment<MANY>Biological Resources<SEP>West Virginia – W. Va. Code R. § 45-01–44, Air Quality<PROP>Bulk Transmission<PROP>West Virginia<PROP>Environment<MANY>Air Quality<SEP>Westgov.org<PROP>Utilities<MANY>Bulk Transmission<PROP>Idaho<PROP>Land Use<MANY>Site Considerations<MANY>Transmission Siting & Interconnection<SEP>Wetland Permit Application Fees 2015<PROP>Hydropower<PROP>Vermont<PROP>Environment<MANY>Water Access<MANY>Water Quality<SEP>Wild and Scenic Rivers Act, 16 U.S.C. §§1271-1287<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Hydropower<PROP>US Federal<PROP>Environment<MANY>Aesthetic Resources<SEP>Williamson Act<PROP><PROP>California<PROP>Land Use<SEP>Wisconsin Coastal Management Program<PROP>Hydropower<PROP>Wisconsin<PROP>Environment<MANY>Land Use Assessment<SEP>Wisconsin Cooperative Agreement Between Department of Natural Resources and the Public Service Commission<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Transmission Siting & Interconnection<SEP>Wisconsin Department of Administration - 2011 Local Land Use Regulations and Comprehensive Status Report<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>Wisconsin Department of Natural Resources – A Citizen Guide to the Role of the Wisconsin Environmental Policy Act in DNR Decision-Making<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Environment<SEP>Wisconsin Department of Transportation Utility Permit Staff Directory<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Wisconsin Department of Transportation – Highway Maintenance Manual<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Wisconsin Department of Transportation – Utility Permit Application (Form DT 1553)<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Wisconsin Department of Transportation – Utility Permit Website<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Wisconsin Environmental Policy Act<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Transmission Siting & Interconnection<MANY>Environment<SEP>Wisconsin Public Service Commission Docket Website<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Power Plant<MANY>Transmission Siting & Interconnection<SEP>Wisconsin Public Service Commission – Application Filing Requirements for Transmission Line Projects in Wisconsin<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Transmission Siting & Interconnection<SEP>Wisconsin Public Service Commission – Right-of-Ways and Easements for Electric Facility Construction in Wisconsin<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Wisconsin Public Service Corporation, 104 FERC ¶ 61,295 (2003)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Wisconsin Zoning Board Handbook<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>Wisconsin – 227 Wis. Stat. §§ 227.01 et seq., Administrative Procedure and Review<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Access<SEP>Wisconsin – 59 Wis. Stat. §§ 59.69 et seq., Counties<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>Wisconsin – Coastal Management Council – Wisconsin Coastal Management Program: A Strategic Vision for the Great Lakes<PROP>Hydropower<PROP>Wisconsin<PROP>Environment<MANY>Land Use Assessment<SEP>Wisconsin – Comprehensive Planning Law (66 Wis. Stat. §§ 66.1001 et seq.)<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Land Use<SEP>Wisconsin – Department of Natural Resources – Construction Storm Water General Permit<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Wisconsin – Department of Natural Resources – Notice of Termination<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Wisconsin – Department of Natural Resources – State Wildlife Action Plan<PROP>Hydropower<PROP>Wisconsin<PROP>Environment<MANY>Biological Resources<SEP>Wisconsin – Department of Natural Resources – ePermits Login Page<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Wisconsin – Department of Natural Resources – ePermitting System Instructions<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<MANY>Environment<MANY>Water Quality<SEP>Wisconsin – Department of Transportation – Commercial Permit Service List<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<SEP>Wisconsin – Department of Transportation – Oversize/Overweight Application Forms Webpage<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<SEP>Wisconsin – Department of Transportation – Single Trip Permit General Conditions<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<SEP>Wisconsin – Department of Transportation – Weight Restrictions Programs Webpage<PROP>Hydropower<PROP>Wisconsin<PROP>General Construction<SEP>Wisconsin – Wis. Admin. Code NR §§ 400–99, Environmental Protection Air Pollution Control<PROP>Bulk Transmission<PROP>Wisconsin<PROP>Environment<MANY>Air Quality<SEP>Wisconsin – Wis. Stat. §§ 182.017 et seq., Transmission lines; privileges; damages<PROP><PROP>Wisconsin<PROP>Transmission Siting & Interconnection<SEP>Www.deq.mt.gov/MFS/LawRules/Circular2<PROP><PROP>Montana<PROP>Site Considerations<SEP>Wyoming Department of Environmental Quality Website<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<PROP>Wyoming<PROP>Environment<MANY>Transmission Siting & Interconnection<SEP>Wyoming Department of State Parks and Cultural Resources and Division of State Parks and Historic Sites - Rules and Regulations, Chapter 1<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Wyoming Dept. of Transportation - Utility Accommodation Regulation Manual<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Wyoming Dept. of Transportation Access Manual<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Access<MANY>Land Use<MANY>Site Considerations<SEP>Wyoming Dept. of Transportation Utility Permit Application Form M-54<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Wyoming Game and Fish Department Geospatial Data<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Utilities<MANY>Wind<MANY>Hydropower<PROP>Wyoming<PROP>Environment<MANY>Biological Resources<SEP>Wyoming Interagency Spatial Database & Online Management<PROP>Bulk Transmission<MANY>Geothermal<MANY>Solar<MANY>Wind<MANY>Hydropower<PROP>Wyoming<PROP>Environment<MANY>Biological Resources<SEP>Wyoming Rules of Civil Procedure<PROP>Bulk Transmission<MANY>Utilities<PROP>Wyoming<PROP>Land Use<MANY>Site Considerations<MANY>Land Access<SEP>Wyoming – 020-0002 Wyo. Code R. § 1–14, Air Quality<PROP>Bulk Transmission<PROP>Wyoming<PROP>Environment<MANY>Air Quality<SEP>York Haven Hydroelectric Project Offer of Settlement (2014)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>York Haven Power Co., LLP, 153 FERC ¶ 62,233 (2014)<PROP>Hydropower<PROP>US Federal<PROP>Power Plant<SEP>Yukon - First Nations Land Claims Settlement Act, S.C. 1994, c. 34<PROP>Bulk Transmission<PROP>Yukon<PROP>Transmission Siting & Interconnection<SEP>Yukon Environmental and Socio-economic Assessment Board – Designated Office Evaluation Process Flowchart<PROP>Bulk Transmission<MANY>Solar<PROP>Yukon<PROP>Environment<SEP>Yukon Environmental and Socio-economic Assessment Board – Environment and Socio-economic Assessment Process Webpage<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon Environmental and Socio-economic Assessment Board – Executive Committee Screening Process Flowchart<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon Environmental and Socio-economic Assessment Board – Executive Committee Screening Rules, Directive No. 1<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon Environmental and Socio-economic Assessment Board – Rules for Evaluations Conducted by Designated Offices<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon Environmental and Socio-economic Assessment Board – Rules for Screening Conducted by the Executive Committee<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon Utilities Board Rules of Practice<PROP>Bulk Transmission<PROP>Yukon<PROP>Transmission Siting & Interconnection<SEP>Yukon – Application for Land Use Change<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Application for Land Use Permit<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Application for Yukon Lands<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Area Development Act, R.S.Y. 2002, c.10<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Assessable Activities, Exceptions, and Executive Committee Projects Regulations, S.O.R./2005-379<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon – Development Permit Application Form<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Development Permit Process Info Sheet<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Discretionary Use Permit Application Form<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Energy Project Certificate and Energy Operation Certificate Application Regulation, O.I.C. 2007/50<PROP>Bulk Transmission<PROP>Yukon<PROP>Transmission Siting & Interconnection<SEP>Yukon – Environmental Assessment and Socio-economic Assessment Act, R.S.Y. 2003, c. 7<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon – Federal Courts Act, R.S.C. 1985, c. F-7<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon – Financial Administration Act, R.S.Y. 2002, c.87<PROP>Bulk Transmission<MANY>Geothermal<PROP>Yukon<PROP>Land Access<SEP>Yukon – Guide to Land Application Appeal Process<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Guide to the Land Application Process<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Highways Act, R.S.Y. 2002, c.108<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Highways Regulation, O.I.C. 2002/174<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Land Use Regulation, O.I.C. 2003/51<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Lands Act, R.S.Y. 2002, c. 132<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Lands Regulations, O.I.C. 1983/192<PROP>Bulk Transmission<PROP><PROP>Land Access<SEP>Yukon – Minor Variance Info Sheet<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Municipal Act, R.S.Y. 2002, c.154<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – North Yukon Regional Land Use Plan<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Public Utilities Act, R.S.Y. 2002, c. 186<PROP>Bulk Transmission<PROP>Yukon<PROP>Transmission Siting & Interconnection<SEP>Yukon – Surface Rights Board Act, S.C. 1994, c. 43<PROP>Bulk Transmission<PROP>Yukon<PROP>Environment<SEP>Yukon – Territorial Lands (Yukon) Act, S.Y. 2003, c.17<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Yukon Environmental and Socio-economic Assessment Act, S.C. 2003, c.7<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Access<SEP>Yukon – Yukon Planning Regions Webpage<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use<SEP>Yukon – Zoning Appeal Board Regulations, C.O. 1976/225<PROP>Bulk Transmission<PROP>Yukon<PROP>Land Use