Applicant Cal Energy +
ApprovalConditions Cal Energy requested approval of a Plan of
Cal Energy requested approval of a Plan of Production, Utilization and Disposal early in the project, claiming that they didn’t want approval to drill wells, only to have a power plant denied in the end. Optional well sites – were analyzed in NEPA. Cal Energy was looking to drill 6 to 8 wells, but did not know which locations would eventually be drilled. Future locations were dependent on results of the latest wells. Clearing large areas around each well – although each well pad was designed for 5 acres, NEPA and supporting clearances (biologic, T&E, cultural) were designed for 40 acres, to facilitate the ability to move the pad in any direction one pad-size.
ove the pad in any direction one pad-size.  +
CompletionNotes 7/29/2014 Exact application dates and fina
7/29/2014 Exact application dates and final EIS dates are approximated. Only the month and year of the application and final EIS dates are known. The date tool does not allow entry of dates before 2004, and so will not calculate timeframe based on dates given for 1992 and 1994. Timeframe should be approximately 730 days (two years). MB
be approximately 730 days (two years). MB  +
EnergyTechnology Geothermal energy  +
EnvironmentalAnalysisType EIS +
ExplorationTechnique Exploration Drilling + , Exploratory Boreholes + , Production Wells + , Thermal Gradient Holes +
GeothermalArea Newberry Caldera Geothermal Area +
GeothermalDevelopmentPhases Geothermal/Exploration + , Geothermal/Well Field + , Geothermal/Power Plant +
LeadAgency U.S. Forest Service + , Bureau of Land Management +
NEPA-Name EIS for Geothermal Power Plants in the Deschutes National Forest  +
NEPA ApplicationDate July 1, 1992  +
NEPA Application Type POU  + , POD  +
NEPA Completion Notes 7/29/2014 Exact application dates and fina
7/29/2014 Exact application dates and final EIS dates are approximated. Only the month and year of the application and final EIS dates are known. The date tool does not allow entry of dates before 2004, and so will not calculate timeframe based on dates given for 1992 and 1994. Timeframe should be approximately 730 days (two years). MB
be approximately 730 days (two years). MB  +
NEPA Consultant Bonneville Power +
NEPA FinalEA-EISDate July 1, 1994  +
NEPA Proposed Action In July 1992, Cal Energy proposes a Plan o
In July 1992, Cal Energy proposes a Plan of Exploration, Development and Production: *Drilling or coring up to 4 TG wells to a max depth of 5,500 feet *Drilling exploration production test wells up to 9,000 feet at 14 locations *Drill and complete production wells sufficient to supply steam for a 33 MW power plant The Cal Energy proposal also included a Plan of Utilization and Disposal to construct a 33 MW geothermal power plant, associated pipelines and transmission lines. The USFS, BLM, and Bonneville Power commence an EIS covering all the above listed plans in Fall 1992. The FEIS was issued in July 1994. Cal Energy spudded well 88-21 TCH in May 1995. Well 88-21 TCH was completed in July 1995 at 4676’ and BHT of 410°F. Cal Energy also spudded well 76-15 TCH in July 1995. This well was completed in November 1995 at 5360’ and BHT of 350°F. In 1996, Cal Energy vacated Newberry, claiming the resource was “hot dry rock”.
claiming the resource was “hot dry rock”.  +
Name NEPA Process for Geothermal Power Plants in the Deschutes National Forest  +
OpenEI/PageDescription : NEPA document related to geothermal resource areas   +
OpenEI/PageKeyword Geothermal  + , Newberry Caldera Geothermal Area  +
Place Oregon: Energy Resources +
ProposedAction In July 1992, Cal Energy proposes a Plan o
In July 1992, Cal Energy proposes a Plan of Exploration, Development and Production: *Drilling or coring up to 4 TG wells to a max depth of 5,500 feet *Drilling exploration production test wells up to 9,000 feet at 14 locations *Drill and complete production wells sufficient to supply steam for a 33 MW power plant The Cal Energy proposal also included a Plan of Utilization and Disposal to construct a 33 MW geothermal power plant, associated pipelines and transmission lines. The USFS, BLM, and Bonneville Power commence an EIS covering all the above listed plans in Fall 1992. The FEIS was issued in July 1994. Cal Energy spudded well 88-21 TCH in May 1995. Well 88-21 TCH was completed in July 1995 at 4676’ and BHT of 410°F. Cal Energy also spudded well 76-15 TCH in July 1995. This well was completed in November 1995 at 5360’ and BHT of 350°F. In 1996, Cal Energy vacated Newberry, claiming the resource was “hot dry rock”.
claiming the resource was “hot dry rock”.  +
Has query
"Has query" is a predefined property that represents meta information (in form of a subobject) about individual queries and is provided by Semantic MediaWiki.
NEPA Process for Geothermal Power Plants in the Deschutes National Forest + , NEPA Process for Geothermal Power Plants in the Deschutes National Forest + , NEPA Process for Geothermal Power Plants in the Deschutes National Forest + , NEPA Process for Geothermal Power Plants in the Deschutes National Forest + , NEPA Process for Geothermal Power Plants in the Deschutes National Forest + , NEPA Process for Geothermal Power Plants in the Deschutes National Forest +
Has processing error
"Has processing error" is a predefined property provided by Semantic MediaWiki and represents errors that appeared in connection with improper value annotations or input processing.
NEPA Process for Geothermal Power Plants in the Deschutes National Forest +
Categories NEPA Doc , Geothermal energy
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
21:00:57, 29 July 2014  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.