Browse wiki

From Open Energy Information

MHK Projects/ITRI WEC
Collaborators CSBC Corporation + , Taiwan: Energy Resources +
Coordinates 25.1522°, 121.7783°Latitude: 25.152354814016
Longitude: 121.77842617035
  +
Device Nameplate Capacity (MW) 0.02  +
Device Units Sold? No  +
Estimated End Date 2015/12/31  +
MHK Project Timeline and Milestones 2013 September 20 kW deploy 2015 20 kW grid connect  +
Main Overseeing Organization Bureau of Energy +
Number of Build Out Units Deployed 1  +
Number of Devices Deployed 1  +
Permit/License Buildout (MW) 0.02  +
Place Keelung + , Taiwan: Energy Resources +
Project City Keelung +
Project Country Taiwan: Energy Resources +
Project Details 1. Based on the sea condition of north-eas
1. Based on the sea condition of north-east costal area. 2. A prototype 6 m 20 kW device scaled up based on the previous 2.25 m 1 kW device. 3. Structure analysis based on 50 years wave and current data. 4. Spec.:D 6m, Stroke 2.1m Total Weight: 63.7 Mt Total Length : 17.9 m PTO: Hydraulic system Power Generation Efficiency: Estimated 40%
Power Generation Efficiency: Estimated 40%  +
Project Footprint 0.05  +
Project Installed Capacity (MW) 0.02  +
Project Nearest Body of Water Pacific Ocean  +
Project Phase Phase 3  +
Project Phase Date 2013/09/30  +
Project Resource Wave  +
Project Start Date 2008/01/01  +
Project State/Province Taiwan: Energy Resources +
United States Permit No  +
Was This Project DOE Funded? No  +
Categories Marine and Hydrokinetic Technology Projects
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
07:04:14, 3 September 2013  +
hide properties that link here 
MHK Technologies/ITRI WEC + Project(s) where this technology is utilized
 
Enter the name of the page to start browsing from.