Browse wiki

From Open Energy Information

Interconnection Standards (Hawaii)
DSIRE/DtAdd 2003-08-21  +
DSIRE/Id HI01R  +
DSIRE/LstUpdt September 27, 2012  +
Incentive/Active true  +
Incentive/ApplDsc Commercial  + , Fed. Government  + , Industrial  + , Nonprofit  + , Residential  + , Schools  + , State Government  +
Incentive/ApplicUtils Investor-owned utilities  +
Incentive/Auth2Code HI PUC Docket No. 2010-0015, Decision and Order  +
Incentive/Auth2DtEnact 2011-11-29  +
Incentive/Auth2Link http://www.dsireusa.org/documents/Incentives/HI01Rd.pdf  +
Incentive/Auth3Code Decision and Order No. 24159  +
Incentive/Auth3DtEnact 2008-04-18  +
Incentive/Auth3Link http://www.dsireusa.org/documents/Incentives/HI01Rb.pdf  +
Incentive/Auth4Code Decision and Order No. 24238  +
Incentive/Auth4DtEnact 2008-05-22  +
Incentive/Auth4Link http://www.dsireusa.org/documents/Incentives/HI01Ra.pdf  +
Incentive/Auth5Code HI PUC Order No. 19773  +
Incentive/Auth5DtEff 2002-11-15  +
Incentive/Auth5DtEnact 2002-11-15  +
Incentive/Auth5Link http://www.dsireusa.org/documents/Incentives/HI01Rc.pdf  +
Incentive/AuthCode HRS § 269-101 et seq.  +
Incentive/AuthDtEnact 6/25/2001 (subsequently amended)  +
Incentive/AuthLink http://www.capitol.hawaii.gov/hrscurrent/Vol05_Ch0261-0319/HRS0269/HRS_0269-0101.htm  +
Incentive/ContAddr 465 South King Street, Room 103  +
Incentive/ContDept Hawaii Public Utilities Commission  +
Incentive/ContEmail Hawaii.PUC@hawaii.gov  +
Incentive/ContName Public Information - Hawaii PUC  +
Incentive/ContPhone (808) 586-2020  +
Incentive/ContPlace Honolulu, Hawaii  +
Incentive/ContWebsite http://www.hawaii.gov/budget/puc  +
Incentive/ContZip 96813  +
Incentive/DsireLstSubModSummaryUpdt December 9, 2011  +
Incentive/DsireSyncDate 2011-04-30 15:10:09  +
Incentive/EnergyCat Renewable Energy Incentive Programs  +
Incentive/ExtDiscSwtch Required  +
Incentive/ImplSector State/Territory  +
Incentive/InsurReqs Generally required  +
Incentive/Name Interconnection Standards  +
Incentive/NetMtrReqd No  +
Incentive/StdAgrmnt Yes  +
Incentive/Summary Hawaii has established simplified intercon
Hawaii has established simplified interconnection rules for small renewables and separate rules for all other distributed generation (DG). For inverter-based systems up to 10 kilowatts (kW) in capacity (and inverter-based DG under 250 kW on islands other than Kauai), there is a simple application process for interconnection. Systems must use inverters compliant with IEEE 1547 and UL 1741. For other smaller systems, there are simplified interconnection procedures for net metered systems powered by solar, wind, biomass and hydroelectric up to 50 kW on Kauai and 100 kW in capacity on the other islands. The state's largest electric utility, Hawaiian Electric Company (HECO), which owns Hawaii Electric Light Company (HELCO) and Maui Electric Company (MECO), uses a set of simple interconnection guidelines. HECO also uses a simple, net-metering agreement. A manual, lockable disconnect switch is required for net-metered systems, and mutual indemnification is required. The state's only other utility, Kauai Island Utility Cooperative (KIUC), has a similar set of rules for net metering and interconnection. In May 2010, A Public Utilities Commission (PUC) decision and order created a standard three-party interconnection agreement. Two dockets were opened in 2006 to streamline interconnection procedures: (1) PUC Docket No. 2006-0497 (Hawaiian Electric Co., Hawaii Electric Light Co., and Maui Electric Co.,); and (2) PUC Docket No. 2006-0498 (KIUC). The PUC issued a decision and order for each of these dockets in April and May 2008, and more streamlined procedures for interconnection were adopted. KIUC provides a fast-track process for small generating facilities under two megawatts (MW), while larger systems must undergo more extensive review. In November 2011, the Public Utilities Commission issued a decision and order to improve Hawaii's interconnection standards. The order approved a supplemental review process and other measures to limit the scope of systems that must conduct an Interconnection Requirements Study (IRS). In the past, a system would automatically have to conduct an IRS if the project did not meet certain technical screening criteria. In particular, the 15% circuit penetration threshold often triggered an IRS. With the new rules, if certain technical screening criteria are not met, the utility will conduct a supplemental review if a customer chooses to proceed with interconnection. The supplemental review will determine if simplified interconnection can take place, if interconnection requirements beyond simplified interconnection are needed, or if an IRS is needed. The new rules have set timelines in the interconnection process, including a timeline for dispute resolution. Under the new rules, a meeting to resolve a dispute must be scheduled within 15 days of a written request being submitted.
days of a written request being submitted.  +
Incentive/SysCapLimit No limit specified  +
Incentive/TechDsc Biomass + , CHP/Cogeneration + , Fuel Cells + , Geothermal Electric + , Hydroelectric energy + , Landfill Gas + , Microturbines + , Municipal Solid Waste + , Other Distributed Generation Technologies + , Photovoltaics + , Solar Thermal Electric + , Wind +
Incentive/Type Interconnection +
OpenEI/PageDescription Interconnection Standards: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Hawaii  + , Interconnection  +
Place Hawaii: Energy Resources +
Categories Incentive with Contacts , Incentive with Authorities , Rules Regulations Policies Incentive Programs
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
15:24:20, 12 February 2015  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.