Browse wiki

From Open Energy Information

Idaho Power - Interconnection Guidelines (Idaho)
DSIRE/DtAdd 2003-06-18  +
DSIRE/Id ID04R  +
DSIRE/LstUpdt November 1, 2006  +
Incentive/Active false  +
Incentive/ApplDsc Commercial  + , Industrial  + , Residential  +
Incentive/ApplDscOther Developer  +
Incentive/ApplicUtils Yes  +
Incentive/Cont2Addr 472 W. Washington  +
Incentive/Cont2Addr2 PO Box 83720  +
Incentive/Cont2Dept Idaho Public Utilities Commission  +
Incentive/Cont2Email rick.sterling@puc.idaho.gov  +
Incentive/Cont2Name Rick Sterling  +
Incentive/Cont2Phone (208) 334-0351  +
Incentive/Cont2Place Boise, Idaho  +
Incentive/Cont2Website http://www.puc.state.id.us/  +
Incentive/Cont2Zip 83720-0074  +
Incentive/ContAddr P.O. Box 70  +
Incentive/ContDept Idaho Power Company  +
Incentive/ContEmail rbishop@idahopower.com  +
Incentive/ContName Rowena Bishop  +
Incentive/ContPhone (208) 388-2658  +
Incentive/ContPlace Boise, Idaho  +
Incentive/ContWebsite http://www.idahopower.com  +
Incentive/ContZip 83707  +
Incentive/DsireSyncDate 2011-04-30 15:16:22  +
Incentive/EnergyCat Renewable Energy Incentive Programs  +
Incentive/ExtDiscSwtch Yes  +
Incentive/ImplSector Utility  +
Incentive/InsurReqs Not specified  +
Incentive/Name Idaho Power - Interconnection Guidelines  +
Incentive/NetMtrReqd Yes (utility guidelines)  +
Incentive/Summary Idaho has not established uniform intercon …
Idaho has not established uniform interconnection rules and procedures for net-metered systems or for large distributed-generation (DG) systems. However, through their respective net-metering tariffs, each of the state's three investor-owned utilities -- Avista Utilities, Idaho Power and Rocky Mountain Power -- has established outlines for the interconnection of small renewable-energy systems. Idaho Power's interconnection guidelines cover net-metered systems up to 100 kilowatts (kw) and larger DG systems. Idaho Power's rules are broken down by system capacity, and include provisions for systems under 25 kW; systems between 25 kW and 100 kW; systems between 100 kW and 1 megawatt (MW), and systems larger than 1 MW. The rules are intended to be simple for systems under 100 kW -- particularly for net-metered systems under 25 kW. Idaho Power's interconnection guidelines include these provisions: * Dedicated transformers could be required (but likely will not be required for systems under 100 kW). * A manual, lockable disconnect switch is required for all systems. * All electrical specifications, such as voltage ranges, harmonics and power factor, are based on current UL, IEEE and NEC standards. * Control relays are required for systems with an inverter that doesn't comply with IEEE 1547. * Acceptance testing is not required for UL-listed inverters. * Systems under 25 kW must be inspected once every three years if the project uses interconnection equipment that meets nationally recognized standards and if the system is approved by Idaho Power in advance. All other projects must be inspected annually. * The owners of systems that are not net-metered must pay the Idaho Power a monthly operation and maintenance charge. Idaho Power's interconnection web site, shown above, inlcudes applications and tariffs for net metering, and a four-step process for generators less up to 20 MW, and documents relevant to interconnecting systems exceeding 20 MW.
o interconnecting systems exceeding 20 MW.  +
Incentive/SysCapLimit 100 kW for net-metered systems; no limit specified for qualifying facilities that are not net-metered  +
Incentive/TechDsc Solar Thermal Electric + , Photovoltaics + , Wind + , Biomass + , Hydroelectric energy + , Fuel Cells + , CHP/Cogeneration + , Other Distributed Generation Technologies +
Incentive/Type Interconnection +
OpenEI/PageDescription Idaho Power - Interconnection Guidelines: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Idaho  + , Interconnection  +
Place Idaho: Energy Resources +
Website http://www.idahopower.com/aboutus/business/generationinterconnect/default.htm  +
Categories Rules Regulations Policies Incentive Programs , Incentive with Contacts
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
06:43:59, 24 May 2011  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.