Guam - Net Metering (Guam)
DSIRE/DtAdd 2008-01-25  +
DSIRE/Id GU02R  +
DSIRE/LstUpdt February 19, 2013  +
Incentive/Active true  +
Incentive/AggrCapLimit Not addressed  +
Incentive/ApplDsc Agricultural  + , Commercial  + , Industrial  + , Institutional  + , Nonprofit  + , Residential  + , Schools  +
Incentive/ApplicUtils Guam Power Authority  +
Incentive/Auth2Code Guam Public Law 30-141  +
Incentive/Auth2DtEff 2010-05-17  +
Incentive/Auth2DtEnact 2010-05-17  +
Incentive/Auth2Link http://www.guamlegislature.com/Public_Laws_30th/P.L. 30-141 Bill No. 320-30 (COR).pdf  +
Incentive/AuthCode Guam Public Law 27-132  +
Incentive/AuthDtEnact 2004-12-30  +
Incentive/AuthLink http://www.guamlegislature.com/Public_Laws_27th/P.L. 27-132.pdf  +
Incentive/ContAddr 548 North Marine Corps Drive  +
Incentive/ContDept Guam Energy Office  +
Incentive/ContFax (671) 649-1215  +
Incentive/ContName General Contact  +
Incentive/ContPhone (671) 646-4361  +
Incentive/ContPlace Tamuning, GU  +
Incentive/ContWebsite http://www.guamenergy.com  +
Incentive/ContZip 96913  +
Incentive/DsireSyncDate 2011-04-30 15:07:22  +
Incentive/EnergyCat Renewable Energy Incentive Programs  +
Incentive/ImplSector State/Territory  +
Incentive/MtrAggr Not addressed  +
Incentive/Name Guam - Net Metering  +
Incentive/NetExcGen Determined by PUC  +
Incentive/RECOwn Not addressed  +
Incentive/Summary <b><i>Guam's Public Utilities …
<b><i>Guam's Public Utilities Commission (PUC) reviewed net metering and interconnection during a regular meeting in February 2009 (Docket 08-10). Please contact the [http://www.guampuc.com/ Guam PUC] for the results of that docket review.</i></b> In 2004, Guam enacted legislation requiring the Guam Power Authority (GPA) to allow net metering for customers with fuel cells, microturbines, wind energy, biomass, hydroelectric, solar energy or hybrid systems of these renewable energy technologies. In 2010, Guam amended net metering and raised the system capacity limits to 25 kilowatts (kW) for residential systems and 100 kW for non-residential systems.* GPA must provide customer-generators with a bi-directional energy meter and may, at its own expense, install additional meters. GPA may not charge customer-generators any fees above and beyond those it charges to other customers in the same rate class that do <i>not</i> use a net-metered energy system. Net-metered systems must meet all applicable safety and power quality standards established by the National Electric Code, Underwriters Laboratories (UL) and the Institute of Electrical and Electronic Engineers (IEEE). The utility may not require customer-generators whose systems meet these standards to meet further requirements, install additional controls or purchase supplemental liability insurance. Customer-generators may be billed on a monthly basis, or with their written consent, on a quarterly, semi-annual or annual period. If a system has produced net excess generation at the end of the billing period the customer-generator is entitled to compensation at a rate to be determined by the Guam Public Utility Commission (PUC). The PUC was required to adopt rules to implement net metering within 120 days of the effective date of the authorizing legislation. As of April 2008, the PUC has not adopted rules for net metering but is considering them through their work on an Integrated Resource Plan. <i>* Note: the original net metering law system capacity limit was 25 kW, regardless of customer class.</i>
W, regardless of customer class.</i>  +
Incentive/SysCapLimit Residential: 25 kW<br /> Non-residential: 100 kW  +
Incentive/TechDsc Biomass + , Fuel Cells + , Hydroelectric energy + , Microturbines + , Photovoltaics + , Small Hydroelectric + , Small Wind + , Wind +
Incentive/Type Net Metering +
OpenEI/PageDescription Guam - Net Metering: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Guam  + , Net Metering  +
Place Guam: Energy Resources +
Categories Rules Regulations Policies Incentive Programs , Incentive with Contacts , Incentive with Authorities
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
15:19:14, 12 February 2015  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.