Browse wiki

From Open Energy Information

Energy Efficiency Rebate Program - Commercial (Virginia)
Incentive/Active false  +
Incentive/Amt Energy audit: 250<br /> Programmable thermostat: 55<br /> All other technologies: 20% total cost (including equipment and labor)  +
Incentive/ApplDsc Commercial  + , Industrial  + , Agricultural  +
Incentive/ContAddr Washington Building  +
Incentive/ContAddr2 1100 Bank Street, 8th floor  +
Incentive/ContDept Virginia Department of Mines, Minerals, and Energy  +
Incentive/ContDiv Virginia Division of Energy  +
Incentive/ContName DMME General Information  +
Incentive/ContPhone (804) 692-3218  +
Incentive/ContPlace Richmond, Virginia  +
Incentive/ContWebsite http://www.mme.state.va.us  +
Incentive/ContZip 23219-3638  +
Incentive/EnergyCat Renewable Energy Incentive Programs  + , Energy Efficiency Incentive Programs  +
Incentive/EquipReqs Central AC: SEER >= 16, EER >=13 (sp
Central AC: SEER >= 16, EER >=13 (split system); SEER >=14, EER >=12 (packaged)<br /> Air source heat pump: HSPF >=8.5, EER>=12.5, SEER>=15 (split system); HSPF>=8, EER>=12, SEER>=14 (packaged)<br /> Natural Gas or Propane Furnace: AFUE >= 95<br /> Oil Furnace: AFUE >= 90<br /> Gas, propane, oil hot water boiler: AFUE >= 90<br /> Gas, propane, oil tankless water heater: Energy Factor >= 0.82 or a thermal efficiency of at least 90%<br /> High efficiency gas storage tank water heater: Energy Star label (Energy Factor .62 or higher)<br /> Electric heat pump water heater: Energy Star label (or equivalent): Energy Factor >= 2.0<br /> Geothermal heat pumps: Energy Star or equivalent<br /> Insulation: must meet 2009 IECC + amendments<br /> Windows, doors, skylights: must have U factor <= 0.30 and SHGC <= 0.30 and be certified by NFRC.<br /> Programmable thermostat: Energy Star.
> Programmable thermostat: Energy Star.  +
Incentive/ExpireDtString Funds available until exhausted.  +
Incentive/ImplSector State/Territory  +
Incentive/InstallReqs Energy audit: Must be performed by a BPI o
Energy audit: Must be performed by a BPI or RESNET certified contractor.<br /> In general, a manufacturer's certificate statement is required and equipment must be new and replacing older, less efficient, in-use equipment.<br /> Geothermal heat pumps: contractor must calculate estimated energy benefits.<br /> Insulation: contractor must calculate the expected energy benefits<br /> Commercial lighting upgrades, High Efficiency Motors and Drives replacements, and Compressed air or steam system upgrades: Must consume 20% less energy than older equipment being replaced.
nergy than older equipment being replaced.  +
Incentive/MaxInc 4,000 if no energy audit performed; 4,250 if audit performed. Maximum applies to any one energy efficiency improvement or combination of improvements.  +
Incentive/Name Energy Efficiency Rebate Program - Commercial  +
Incentive/ProgAdmin Virginia Department of Mines, Minerals, and Energy  +
Incentive/ProgBudget $8 million  +
Incentive/Summary '''''As of March 26, 2010, the Virginia De
'''''As of March 26, 2010, the Virginia Department of Mines, Minerals, and Energy is no longer accepting reservations. This program is fully subscribed and the information here is for informational purposes only.''''' The Virginia Department of Mines, Minerals, and Energy (DMME) are providing rebates for a variety of energy efficiency upgrades. In all cases, the energy efficient equipment must replace older, less efficient, in-use equipment. The second round of funding has up to $6.5 million for rebates for commercial, agricultural, and "light industrial" businesses that invest in energy efficiency improvements, retrofits, or replacement of old inefficient equipment with approved energy efficient equipment in their businesses. For a list of energy efficiency technologies and services eligible for rebates, review DMME's [http://www.dmme.virginia.gov/DE/ARRA-Public/EEMeasuresRequirements.shtml list]. The application is a two-step process. Businesses MUST first submit a reservation application to be eligible for a rebate. Equipment purchased on or after June 26, 2009 is eligible. In most cases, applicants will be required to submit a Manufacturer's Certification Statement and in some cases, the contractor will be required to calculate estimated or expected energy savings of the efficiency upgrades. Applicants should read DMME's [http://www.dmme.virginia.gov/DE/ARRA-Public/EEGenTermsConditions.shtml Terms and Conditions] carefully as well as see the Frequently Asked Questions, which provide additional guidance.
stions, which provide additional guidance.  +
Incentive/TechDsc Water Heaters + , Lighting + , Chillers + , Furnaces + , Boilers + , Heat pumps + , Central Air conditioners + , Heat recovery + , Steam-system upgrades + , Compressed air + , Programmable Thermostats + , Energy Mgmt. Systems/Building Controls + , Duct/Air sealing + , Building Insulation + , Windows + , Doors + , Motors + , Motor VFDs + , Custom/Others pending approval + , CHP/Cogeneration + , Ground Source Heat Pumps +
Incentive/TechDscOther Energy Audits  +
Incentive/Type State Rebate Program +
OpenEI/PageDescription Energy Efficiency Rebate Program - Commercial: energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Virginia  + , State Rebate Program  + , Virginia Department of Mines  + , Minerals  + , and Energy  +
Place Virginia: Energy Resources +
Website http://www.dmme.virginia.gov/DE/ARRA-Public/SEPRebate.shtml  +
Has processing error
"Has processing error" is a predefined property provided by Semantic MediaWiki and represents errors that appeared in connection with improper value annotations or input processing.
Energy Efficiency Rebate Program - Commercial (Virginia) +
Categories Financial Incentive Programs , Incentive with Contacts
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
04:08:02, 7 October 2012  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.