Applicant Ormat Technologies Inc +
ApprovalConditions See attached file of Conditions of Approval.  +
BLM LeaseNumber NVN-083929 + , NVN-083930 + , NVN-083931 + , NVN-083932 +
CompletionNotes Data entry complete.  +
EnergyTechnology Geothermal energy  +
EnvironmentalAnalysisType EA +
ExplorationTechnique Drilling Techniques + , Development Drilling +
GeothermalArea Dead Horse Wells Geothermal Area +
GeothermalDevelopmentPhases Geothermal/Well Field + , Geothermal/Power Plant +
LeadAgency Bureau of Land Management +
ManagingDistrictOffice BLM Carson City District Office +
ManagingFieldOffice BLM Stillwater Field Office +
MineralManager Bureau of Land Management +
NEPA-Name Wild Rose Geothermal Project EA for Geothermal/Well Field, Geothermal/Power Plant  +
NEPA ApplicationDate February 3, 2012  +
NEPA Application Type POO  + , POU  + , POD  +
NEPA Completion Notes Data entry complete.  +
NEPA Consultant EMPSi +
NEPA Decision Media:WildRoseDR signed.pdf +
NEPA DecisionDocumentDate October 5, 2012  +
NEPA Document File:WildRoseDR-COAs.pdf +
NEPA FONSI Media:WildRoseFONSI-signed.pdf +
NEPA FinalEA-EISDate October 5, 2012  +
NEPA LeadAgencyDocNumber DOI-BLM-NV-C010-2012-0050-EA  +
NEPA PreliminaryEA-EISDate July 11, 2012  +
NEPA Proposed Action Drill and test up to 4 wells, 15 - 35 MW new power plant facility and substation, construction and operation of production and injection wells, pipelines asses roads, etc, construct and operate a 120 kV gen-tie and switching station.  +
NEPA Resource Analysis - Present, Potentially Affected Geothermal/Invasive, Nonnative Species + , Geothermal/Migratory Birds + , Geothermal/Geology and Minerals + , Geothermal/Wildlife Resources + , Geothermal/BLM Sensitive Species + , Geothermal/Range Resources +
NEPA Resource Applicant Mitigation Water would be applied to the ground during the construction and utilization of the drill pads, access roads, and other disturbed areas as necessary to control dust.  + , *Any areas containing cultural resources
*Any areas containing cultural resources of significance would be avoided, or the potential for impacts mitigated in a manner acceptable to the BLM. Ormat employees, contractors, and suppliers would be reminded that all cultural resources are protected and if uncovered shall be left in place and reported to the Ormat representative and/or their supervisor. *A buffer of approximately 30 to 50 meters would be established around eligible and unevaluated cultural sites that lie very close to project activities. When initial construction is close to the buffered areas, an archaeological monitor would be present to insure that eligible and unevaluated cultural sites are not disturbed.
aluated cultural sites are not disturbed.   +
, 1. To prevent the spread of invasive, non-
1. To prevent the spread of invasive, non-native species, all contractors will be required to power-wash their vehicles and equipment, including body and undercarriage, prior to entering BLM-administered lands. 2. Prior to construction, Ormat will submit to BLM an invasive plant management plan to monitor and control noxious weeds. At a minimum, the plan would incorporate the following measures: *Existing weed infestations would be treated prior to disturbance. The location of the weeds would be communicated to the Stillwater Field Office weed coordinator, and treatment methods and herbicides used would be discussed prior to treatment. Infestations would be either avoided or treated prior to disturbance *Herbicides would be applied per label instructions. *All personnel applying herbicides would either be certified by the BLM and/or the State of Nevada, or they would be supervised by a BLM or State of Nevada Certified Applicator. *Bureau or other personnel applying herbicides would use personal protective equipment while spraying or handling herbicides *Herbicide application operations would be suspended when wind speed exceeds 6 miles per hour or when precipitation is imminent. *Some treatment areas could be signed, if needed, indicating the herbicide used and the date of treatment. Areas which that are isolated and/or receive very little use by human beings would not be signed. *During herbicide treatments, a pre-application sweep of the area would be completed (i.e., looking for nesting birds). Any areas that become infested with weeds during construction would be mapped and treated. 3. Any infestations of noxious weed species discovered during construction or operation would be treated prior to disturbance. The location of the weeds would be communicated to the Stillwater Field Office weed coordinator, and treatment methods and herbicides used would be discussed prior to treatment.
sed would be discussed prior to treatment.  +
, *If Gen-tie Option 2 is selected, Ormat w
*If Gen-tie Option 2 is selected, Ormat would avoid construction activities within the Nugent Wash Canyon area during lambing and the winter season (November 1 – May 1). *All power poles will utilize BLM-approved raptor deterrents. *If the Nevada Department of Wildlife determines that anti-perch and anti- nesting devices are warranted, Ormat Technologies Inc. and the applicable energy company will retrofit transmission line components within six months of a Nevada Department of Wildlife request. *The proposed transmission line would also provide raptor protection in compliance with the standards described in the “Suggested Practices for Raptor Protection on Power Lines, The State of the Art in 2006” (APLIC 2006). *Sumps that do not contain liquids harmful to wildlife would be graded to allow wildlife to escape or have escape ramps installed. Ormat would employ immediate reclamation (e.g., liquid management/solidification) as soon as sumps are no longer necessary. The following standards would be adopted to permit wildlife to escape: **Pits/Ponds/Tanks with Wall Grades Allowing Wildlife to Escape: ***Ensure at least two sides or installed shoots are sloped 4:1 (horizontal:vertical) or flatter. Even with appropriate grading, wildlife slipping may be an issue (e.g., clay based drilling material) precluding successful escape. If sure-footing or slipping issues may exist, consider installing geo-mesh. If geo-mesh is utilized, it should occur in 2 corners (at least 8 feet wide) and the maximum distance between any two geomesh locations should not exceed 200 feet; and/or ***Escape Ramps - Install when Sump Walls are > 3:1 grading (e.g. 2:1) and/or when Synthetic Liners are Installed; and ***Install escape ramps in 2 corners; should be coated with geo-mesh; maximum distance between any two ramps should not exceed 200 feet.
any two ramps should not exceed 200 feet.   +
, All construction and operating equipment w
All construction and operating equipment would be equipped with applicable exhaust spark arresters. Fire extinguishers would be available on the active sites. Water that is used for construction and dust control would be available for firefighting. Personnel would be allowed to smoke only in designated areas, and they would be required to follow applicable BLM regulations regarding smoking.
licable BLM regulations regarding smoking.  +
, Following project construction, areas of disturbed land no longer required for operations would be reclaimed to promote the reestablishment of native plant and wildlife habitat.  + , Construction noise would be minimized through practices which avoid or minimize actions which may typically generate greater noise levels, or generate distinctive impact noise.  + , *Cut and fill activities have been minimi
*Cut and fill activities have been minimized through the selection of the power plant site and pipeline routes. Offsite storm water would be intercepted in ditches and channeled to energy dissipaters as necessary to minimize erosion around the power plant. To minimize erosion from storm water runoff, access roads would be maintained consistent with the best management practices applicable to development roads. BLM best management practices for storm water would be followed, as applicable, on public lands. *Water wells would be cased to a depth below the lowest groundwater aquifer to prevent co-mingling of fluids, in compliance with appropriate sections of the NRS 534A.010 through NRS 534A.090 and all other applicable local, state, and federal regulations. *A spill or discharge contingency plan would be implemented to mitigate the impact of potential sources of accidental spills or discharges
ources of accidental spills or discharges   +
NEPA Resource Comment The proposed action will avoid all historic properties.  + , The proposed action will not impact any traditional cultural properties, significant religious or sacred sites, or other known sites of cultural importance.  + , After consulting with the BLM wildlife biologist and the USFWS website for Nevada, no T & E species are known to exist in the project area.  + , No hazardous wastes occur in the proposed project area and all solid wastes would be disposed off-site (see Section 2.1.7.2).  + , The proposed action is located near the Gabbs Wilderness Study Area, but will not affect wilderness character.  +
NEPA Resource Imposed Mitigation To minimize air pollution emissions from c
To minimize air pollution emissions from construction activities and construction and drill rig diesel engines, the following BMPs for fugitive dust and diesel exhaust would be implemented during operational activities:  Surfacing access roads with aggregate materials, wherever appropriate;  Using dust abatement techniques, such as watering on unpaved, unvegetated surfaces to minimize airborne dust, as needed (the source of water to be used for dust abatement is described in Section 2.1.4.8);  Posting and enforcing speed limits to reduce fugitive dust (speed limit of 15 miles per hour, as necessary);  Applying dust abatement techniques (such as watering, requiring loader buckets to be emptied slowly, minimizing drop heights, etc.) to earth-moving, excavating, trenching, and grading activities; and  Minimizing equipment and vehicle idling times during construction activities.
ling times during construction activities.  +
, When initial construction is close to the
When initial construction is close to the buffered areas, an archaeological monitor would be present to insure that eligible and unevaluated cultural sites are not disturbed. Additionally, Ormat employees, contractors, and suppliers would be reminded that all cultural resources are protected and if uncovered shall be left in place and reported to the Ormat representative and/or their supervisor. The following cultural resource protection measures would be implemented by Ormat:  Avoid known eligible and potentially eligible cultural resource sites through design, construction, and operation of the project.  A 100-foot buffer zone would be established around eligible and potentially eligible cultural resource sites to help provide protection to the sites. The Proposed Action would not encroach into the established 100-foot buffer zone.  The project facilities would be operated in a manner consistent with the engineered design to prevent problems associated with run-off that could affect adjacent cultural sites. This includes the use of acceptable erosion control methods that are applicable to the site conditions.  Where the installation of project facilities could impact eligible or potentially eligible cultural sites, Ormat would retain a qualified archaeologist to serve as a cultural monitor during construction of the facility in order to avoid potential effects to cultural site(s). The BLM would decide when cultural monitors are necessary.  Limit vehicle and equipment travel to established roads and roads that are part of the Proposed Action.  Any accidental discovery of cultural resources, items of cultural patrimony, sacred objects, or funerary items would require that all activity in the vicinity of the find ceases, and Terri Knutson, Field Manager, Stillwater Field Office, 5665 Morgan Mill Road Carson City, Nevada 89701, be notified immediately by phone (775-885-6000) with written confirmation to follow. The location of the find would not be publicly disclosed, and any human remains must be secured and preserved in the place until a Notice to Proceed is issued by the authorized officer.
oceed is issued by the authorized officer.  +
, *Construction of a power plant, gen-tie,
*Construction of a power plant, gen-tie, well connection pipelines, and surface disturbance from roads, parking, and laydown areas would result in permanent, direct loss of cold desert scrub habitat. This could disturb any birds nesting nearby. In order to prevent these disruptions pre-construction nesting bird surveys would be performed. *Netting, or other appropriate mitigation, would be installed over or near reserve pits to prevent access and mortality of migratory birds.
access and mortality of migratory birds.   +
, *All drill rig and well test facility lig
*All drill rig and well test facility lights would be limited to those required to safely conduct the operations and would be shielded and/or directed in a manner that focuses direct light to the immediate work area. *All newly constructed structures would be below 85 feet tall and the energy plant, pipelines, wellheads, pump motors and motor control buildings would each be painted consistent with BLM visual guidelines to blend with the area and minimize visibility. The fence constructed around each of the production well sites would also be painted an appropriate color to blend with the area.
appropriate color to blend with the area.   +
, *Should operations be proposed which woul
*Should operations be proposed which would result in potential conflict between the two parties, the BLM would attempt to assist the two parties to reduce or eliminate the conflict. *Relocating well sites and access routes in the project area could create the same surface conflicts with locatable mining claim exploration activities. However, Ormat and the mining claimant or operator would negotiate to reduce or eliminate conflicts that may arise from any relocated geothermal activity.
e from any relocated geothermal activity.   +
, 1. Reserve pits and all sumps containing p
1. Reserve pits and all sumps containing potentially harmful liquids to wildlife would be fenced and netted. Fencing would be 42 inches tall with the bottom 24 inches having holes smaller than 2 inches (e.g., stucco/chicken wire, safety, etc.) placed tight to the ground, per Nevada Department of Wildlife guidelines. Nevada Department of Wildlife would be consulted in the event that sumps are attracting and resulting in wildlife mortalities; netting, screening, bird balling, flagging, and/or placing reflectors may be necessary. 2. Introducing liquids harmful (e.g., toxic or temperature or physical properties of substance) to wildlife (e.g., during flow testing) would be conducted at times likely to result in the fewest wildlife issues. For example, Ormat would avoid flow testing during the peak of the bird migration season.
ing the peak of the bird migration season.  +
NEPA Resources Geothermal/Air Quality + , Areas of Critical Environmental Concern + , Geothermal/Cultural Resources + , Geothermal/Environmental Justice + , Geothermal/Prime or Unique Farmlands + , Geothermal/Floodplains + , Geothermal/Invasive, Nonnative Species + , Geothermal/Migratory Birds + , Geothermal/Native American Concerns + , Geothermal/Threatened and Endangered Species + , Geothermal/Wastes Hazardous or Solid + , Geothermal/Wetlands and Riparian Zones + , Geothermal/Wild and Scenic Rivers + , Geothermal/Wilderness + , Geothermal/Visual Resources + , Geothermal/Geology and Minerals + , Geothermal/Wildlife Resources + , Geothermal/BLM Sensitive Species + , Geothermal/Range Resources + , Geothermal/Fire Resources + , Geothermal/Vegetation + , Geothermal/Noise + , Geothermal/Water Quantity +
NEPA RevisedApplicationDate February 14, 2012  +
NEPA SerialNumber NVN-084239X  +
NEPA SerialRegisterPage Media:NVN-084239X-SRP-Unit.pdf +
Name DOI-BLM-NV-C010-2012-0050-EA  +
OpenEI/PageDescription : NEPA document related to geothermal resource areas   +
OpenEI/PageKeyword Geothermal  + , Dead Horse Wells Geothermal Area  +
Place California: Energy Resources +
ProposedAction Drill and test up to 4 wells, 15 - 35 MW new power plant facility and substation, construction and operation of production and injection wells, pipelines asses roads, etc, construct and operate a 120 kV gen-tie and switching station.  +
SurfaceManager Bureau of Land Management +
Has query
"Has query" is a predefined property that represents meta information (in form of a subobject) about individual queries and is provided by Semantic MediaWiki.
DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA +
Has processing error
"Has processing error" is a predefined property provided by Semantic MediaWiki and represents errors that appeared in connection with improper value annotations or input processing.
DOI-BLM-NV-C010-2012-0050-EA + , DOI-BLM-NV-C010-2012-0050-EA +
Categories NEPA Doc , Geothermal energy
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
23:25:48, 22 March 2016  +
Has subobject
"Has subobject" is a predefined property representing a container construct and is provided by Semantic MediaWiki.
DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Air_Quality + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Areas_of_Critical_Environmental_Concern + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Cultural_Resources + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Environmental_Justice + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Prime_or_Unique_Farmlands + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Floodplains + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Invasive,_Nonnative_Species + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Migratory_Birds + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Native_American_Concerns + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Threatened_and_Endangered_Species + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Wastes_Hazardous_or_Solid + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Wetlands_and_Riparian_Zones + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Wild_and_Scenic_Rivers + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Wilderness + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Visual_Resources + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Geology_and_Minerals + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Wildlife_Resources + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_BLM_Sensitive_Species + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Range_Resources + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Fire_Resources + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Vegetation + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Noise + , DOI-BLM-NV-C010-2012-0050-EA#NEPAImpact_with_Water_Quantity +
hide properties that link here 
DOI-BLM-NV-C010-2013-0037-DNA + NEPA TieredDoc
 
Enter the name of the page to start browsing from.