NEPA Resource Analysis Present, Potentially Affected  +
NEPA Resource Imposed Mitigation Soil Management Plan. A Soil Management Pl
Soil Management Plan. A Soil Management Plan will be developed and implemented for construction of the proposed Project. The objective of the Soil Management Plan is to provide guidance for the proper handling, onsite management, and disposal of impacted soil that might be encountered during construction activities. The plan will include practices that are consistent with California Title 8, Occupational Safety and Health Administration (Cal-OSHA) regulations, as well as appropriate remediation standards that are protective of the planned use. The Plan will provide guidelines for identification of impacted soil, assessing impacted soil, soil excavation, impacted soil storage, verification sampling, and impacted soil characterization and disposal. In the event that potentially contaminated soils are encountered within the footprint of construction, soils will be tested and stockpiled. The appropriate Certified Unified Program Agency (CUPA) will determine whether further assessment is warranted.
e whether further assessment is warranted.  +
NEPA Resources Geothermal/Soils +
hide properties that link here 
Barren Ridge Renewable Transmission + Has subobject
"Has subobject" is a predefined property representing a container construct and is provided by Semantic MediaWiki.
 
Enter the name of the page to start browsing from.