BLM-NV-WN-ES-08-01-1310, NV-020-08-01#NEPAImpact_with_Soils
NEPA Resource Analysis Present, Potentially Affected  +
NEPA Resource Applicant Mitigation Cut and fill activities have been minimize
Cut and fill activities have been minimized through the selection of the power plant site and pipeline routes. Off-site storm water would be intercepted in ditches and channeled to energy dissipaters as necessary to minimize erosion around the power plant. To minimize erosion from storm water runoff, access roads would be maintained consistent with the best management practices for road construction applicable to development roads. BLM best management practices for storm water would be followed, as applicable, on public lands.
followed, as applicable, on public lands.  +
NEPA Resources Geothermal/Soils +
hide properties that link here 
BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + Has subobject
"Has subobject" is a predefined property representing a container construct and is provided by Semantic MediaWiki.
 
Enter the name of the page to start browsing from.