Browse wiki

From Open Energy Information

Appropriation or Use of Waters, Reservoirs, and Dams (Maryland)
DSIRE/LstUpdt September 15, 2014  +
EZFeed/Relevant Yes  +
Incentive/Active true  +
Incentive/AddlPlaceSelector State-Level  +
Incentive/AddlPlaceStateLevel Maryland  +
Incentive/ApplDsc Agricultural  + , Commercial  + , Construction  + , Industrial  + , Investor-Owned Utility  + , Municipal/Public Utility  + , Rural Electric Cooperative  + , Utility  +
Incentive/Auth2Code COMAR 26.17.04  +
Incentive/Auth2Link http://www.dsd.state.md.us/comar/SubtitleSearch.aspx?search=26.17.04.*  +
Incentive/Auth3Code COMAR 26.17.06  +
Incentive/Auth3Link http://www.dsd.state.md.us/comar/SubtitleSearch.aspx?search=26.17.06.*  +
Incentive/Auth4Code COMAR 26.17.07  +
Incentive/Auth4Link http://www.dsd.state.md.us/comar/SubtitleSearch.aspx?search=26.17.07.*  +
Incentive/AuthCode Environment Article, 5-501 et seq., Annotated Code of Maryland  +
Incentive/AuthLink http://www.lexisnexis.com/hottopics/mdcode/  +
Incentive/ContAddr 1800 Washington Boulevard  +
Incentive/ContDept Maryland Department of the Environment  +
Incentive/ContPhone (410) 537-3000  +
Incentive/ContPlace Baltimore, Maryland  +
Incentive/ContZip 21230  +
Incentive/ImplSector State/Province  +
Incentive/Name Appropriation or Use of Waters, Reservoirs, and Dams (Maryland)  +
Incentive/PolicyType Other Policy  +
Incentive/Summary It is state policy to control the use and
It is state policy to control the use and appropriation of ground and surface waters of the state. A permit from the Department of the Environment is required prior to the construction or operation of any plant, building, or structure that will appropriate or use any waters of the state. The applicant must provide the Department that the proposed water withdrawal will not jeopardize the State's natural water resources. Some exemptions – including for domestic water use, agricultural use of less than 10,000 gallons per day on average, and groundwater use of 5,000 gallons of water per day or less – apply. Permits from the Department are likewise required prior to the construction, alteration, or repair of any reservoir, dam, or waterway obstruction. Some exemptions apply. This legislation contains additional information on exemptions, required information notices and public hearings, Department considerations in acting on permit applications, measuring and reporting of water use, compliance, and additional regulations.
e, compliance, and additional regulations.  +
Incentive/TechDsc Coal with CCS + , Hydroelectric energy + , Hydroelectric (Small) + , Nuclear +
Incentive/Type Environmental Regulations +
Incentive/Website http://www.mde.state.md.us/programs/Water/Water_Supply/Pages/waterresourcemanagement.aspx  +
OpenEI/PageDescription Appropriation or Use of Waters, Reservoirs, and Dams (Maryland): energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Maryland  + , Environmental Regulations  +
Place Maryland: Energy Resources +
Categories EZFeed Policies , Incentive with Contacts , Incentive with Authorities
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
01:53:43, 13 February 2015  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.