Application Filing Requirements for Wind-Powered Electric Generation Facilities (Ohio)
DSIRE/LstUpdt September 15, 2014  +
EZFeed/Relevant Yes  +
Incentive/Active true  +
Incentive/AddlPlaceSelector State-Level  +
Incentive/AddlPlaceStateLevel Ohio  +
Incentive/AddlPlaceStates Ohio: Energy Resources +
Incentive/ApplDsc Commercial  + , Developer  + , Investor-Owned Utility  + , Municipal/Public Utility  + , Rural Electric Cooperative  + , Utility  +
Incentive/ContAddr 180 East Broad Street  +
Incentive/ContDept Ohio Power Siting Board  +
Incentive/ContEmail contactOPSB@puc.state.oh.us  +
Incentive/ContPhone 866-270-6772  +
Incentive/ContPlace Columbus, Ohio  +
Incentive/ContWebsite http://www.opsb.ohio.gov/opsb/  +
Incentive/ContZip 43215  +
Incentive/ImplSector Utility  +
Incentive/Name Application Filing Requirements for Wind-Powered Electric Generation Facilities (Ohio)  +
Incentive/PolicyType Other Policy  +
Incentive/ProgAdmin Ohio Public Utilities Commission  +
Incentive/Summary Chapter 4906-17 of the Ohio Administrative …
Chapter 4906-17 of the Ohio Administrative Code states the Application Filing Requirements for wind-powered electric generating facilities in Ohio. The information requested in this rule shall be used to assess the environmental effects of the proposed facility. An applicant for a certificate to site a wind-powered electric generation facility shall provide a project summary and overview of the proposed project. In general, the summary should be suitable as a reference for state and local governments and for the public. The applicant shall conduct a project area site selection study prior to submitting an application for a wind-powered electric generation facility. The study shall be designed to evaluate all practicable project area sites for the proposed facility. Information on the location, major features, and the topographic, geologic, and hydrologic suitability of the proposed project area site and any proposed alternative project area site(s) shall be submitted by the applicant. For detailed requirements for the project summary and siting study, please see: http://www.puc.state.oh.us/emplibrary/files/legal/rules/chapters/4906-17.doc
ary/files/legal/rules/chapters/4906-17.doc  +
Incentive/TechDsc Wind energy +
Incentive/Type Siting and Permitting +
Incentive/UserSource http://www.puc.state.oh.us/emplibrary/files/legal/rules/chapters/4906-17.doc  +
Incentive/Website http://www.opsb.ohio.gov/opsb/index.cfm/Rules/  +
OpenEI/PageDescription Application Filing Requirements for Wind-Powered Electric Generation Facilities (Ohio): energy incentive program.  +
OpenEI/PageKeyword Energy Incentives  + , Ohio  + , Siting and Permitting  + , Ohio Public Utilities Commission  +
Place Ohio: Energy Resources +
Categories EZFeed Policies , Incentive with Contacts
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
01:53:09, 13 February 2015  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.