Alcoa Power Generating Inc., 110 FERC ¶ 61,056 (2005)
Abstract The Commission rejected a cost-sharing set
The Commission rejected a cost-sharing settlement provision for the relicense of a 380-MW hydropower project on the Little Tennessee and Cheoah Rivers in North Carolina.The Commission reasoned that only the licensee is under its jurisdiction, and only responsible for performing all of the license requirements. As such, the Commission could not enforce the proposed recreational enhancement cost-sharing provisions. The Commission required the licensee to resubmit recreational plans specifying those recreational enhancements the licensee was responsible for.
ncements the licensee was responsible for.  +
Citation [[Alcoa Power Generating Inc., 110 FERC ¶ 61, 056 (2005)]] (2005).  +
Document type Legal  +
LegalDocType Other  +
Name Alcoa Power Generating Inc., 110 FERC ¶ 61,056 (2005)  +
PublicationDate 2005  +
RAPID-topic Power Plant  +
ReferenceGenre Hydropower  +
Has query
"Has query" is a predefined property that represents meta information (in form of a subobject) about individual queries and is provided by Semantic MediaWiki.
Alcoa Power Generating Inc., 110 FERC ¶ 61,056 (2005) + , Alcoa Power Generating Inc., 110 FERC ¶ 61,056 (2005) +
Has processing error
"Has processing error" is a predefined property provided by Semantic MediaWiki and represents errors that appeared in connection with improper value annotations or input processing.
Alcoa Power Generating Inc., 110 FERC ¶ 61,056 (2005) +
Categories References , Hydropower References , RAPID Toolkit Library
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
14:55:59, 13 June 2018  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.