Air-Cooled Condensers in Next-Generation Conversion Systems Geothermal Lab Call Project
Geothermal/Awardees Idaho National Laboratory  +
Geothermal/DOEFundingLevel 810,000  +
Geothermal/FundingOpportunityAnnouncemt DE-PS36-09GO99017  +
Geothermal/FundingSource American Recovery and Reinvestment Act of 2009  +
Geothermal/LocationOfProject Idaho Falls, ID +
Geothermal/Objectives Identify and recommend methods to mitigate the disadvantages of air-cooling in the power cycles of the next generation of geothermal power plants.  +
Geothermal/PrincipalInvestigator Gregory Mines  +
Geothermal/ProjectDesc As the geothermal industry moves to use ge
As the geothermal industry moves to use geothermal resources that are more expensive to develop, there will be increased incentive to use more efficient power plants. Because of increasing demand on finite supplies of water, this next generation of more efficient plants will likely need to reject heat sensibly to the ambient (air-cooling). This will be especially true in western states having higher grade Enhanced Geothermal Systems (EGS) resources, as well as most hydrothermal resources. If one had a choice, an evaporative heat rejection system would be selected because it would provide both cost and performance advantages. The evaporative system, however, consumes a significant amount of water during heat rejection that would require makeup. Though they use no water, air-cooling systems have higher capital costs, reduced power output (heat is rejected at a higher temperature), lower power sales due to higher parasitics (fan power), and greater variability in power output (because of large variation in the dry-bulb temperature).
ge variation in the dry-bulb temperature).  +
Geothermal/ProjectTypeTopic1 Laboratory Call for Submission of Applications for Research, Development and Analysis of Geothermal Technologies  +
Geothermal/ProjectTypeTopic2 Air-Cooling  +
Geothermal/TargetsMilestones The project objective will be accomplished
The project objective will be accomplished through a series of engineering studies that will be performed for the candidate plants with different resource scenarios. There are three resource scenarios; <br />- Air-Cooled Binary (Completion by FY10 1st Quarter) <br />- Air-Cooled Flash Steam (Completion by FY10 3rd Quarter) <br />- Air-Cooled Condenser designs for Mixed Working Fluids (Completion by FY11 4th Quarter) In each of the studies performed, results will be documented and recommendations made as to whether further research is warranted to validate the projected benefits.
ranted to validate the projected benefits.  +
Geothermal/TotalProjectCost 810,000  +
Name Air-Cooled Condensers in Next-Generation Conversion Systems  +
Place Idaho: Energy Resources +
Has query
"Has query" is a predefined property that represents meta information (in form of a subobject) about individual queries and is provided by Semantic MediaWiki.
Air-Cooled Condensers in Next-Generation Conversion Systems Geothermal Lab Call Project +
Categories Geothermal ARRA Funded Projects , Geothermal Lab Call Projects
Modification date
"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by Semantic MediaWiki.
18:19:42, 22 July 2011  +
hide properties that link here 
  No properties link to this page.
 
Enter the name of the page to start browsing from.