RAPID/Hydropower/Florida/Pre-Existing Land Use
< RAPID | Hydropower | Florida
Florida Hydropower Pre-Existing Land Use Assessment(13-FL)
In Florida, a hydropower developer should consider the project’s location to determine the land use designation and to comply with potential federal and state development restrictions. Currently, the RAPID Toolkit does not have state specific content regarding pre-existing land use assessments for hydropower development in Florida.
Determine Which State and Federal Permits Apply
Use this overview flowchart and following steps to learn which federal and state permits apply to your projects.
Narrow your results (by hydropower project type)
allContact Information
Edit
U.S. Army Corps of Engineers
Section 408 Regulatory Contacts
Visit Website
Feedback | Add a Contact
List of Reference Sources
{{}}