Property Type Text
Description Used by the RAPID toolkit state level permitting forms.

Pages using the property "InterconnectRequest"

Showing 19 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

R
RAPID/Hydropower/Alaska/Transmission +Alaska does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Arkansas/Transmission +Arkansas does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/California/Transmission +An interconnection customer who wants to connect a generating facility to the California ISO grid must apply and meet the requirements set out by the [[California Independent System Operator]].  +
RAPID/Hydropower/Colorado/Transmission +Both the state and local governments are involved in the transmission permitting process. A developer may need to comply with state and local permitting requirements.  +
RAPID/Hydropower/Illinois/Transmission +Illinois does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Indiana/Transmission +Indiana does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Iowa/Transmission +Iowa does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Kentucky/Transmission +"No utility shall begin the construction or installation of any property, equipment, or facility to establish an electrical interconnection with a merchant electric generating facility in excess of ten megawatts (10MW) until the plans and specifications for the electrical interconnection have been filed with the commission" [[Kentucky - KY. Rev. Stat. Ann. §278.212 et seq., Filing Plans for Electrical Interconnection, (2002)|KY. Rev. Stat. Ann. §278.212(1) (2002)]]  +
RAPID/Hydropower/Minnesota/Transmission +Minnesota does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Mississippi/Transmission +Mississippi does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Missouri/Transmission +Missouri does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/New York/Transmission +A hydropower developer must file an Interconnection Request with the [[New York Independent System Operator]] (NYISO) in order to connect a new generating facility, or merchant transmission facility to the New York State (NYS) Transmission System. A developer may also need to file an Interconnection Request with NYISO for material modifications to an existing large facility or modifications to an existing Interconnection Request. [[NYISO Transmission Expansion and Interconnection Manual]].  +
RAPID/Hydropower/North Dakota/Transmission +North Dakota does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Ohio/Transmission +Ohio does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Pennsylvania/Transmission +Pennsylvania does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Tennessee/Transmission +Tennessee does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/Vermont/Transmission +Vermont does not currently have a state specific interconnection request process.  +
RAPID/Hydropower/West Virginia/Transmission +West Virginia does not currently have a state specific interconnection request process  +