Property Name CertThreshold
Property Type Text
Description Used by the RAPID toolkit state level permitting forms.

Pages using the property "CertThreshold"

Showing 18 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

R
RAPID/Hydropower/Alaska/Power Plant +Any public utility before commencing with utility operations or receiving compensation for providing services to customers.  +
RAPID/Hydropower/Alaska/Transmission +The [[Federal Energy Regulatory Commission]] (FERC) has jurisdiction over the primary transmission lines for most hydroelectric projects. However, a public utility may need to obtain a Certificate of Public Convenience and Necessity from the [[Regulatory Commission of Alaska]] before the construction or operation of a transmission line extension projects located outside of a FERC license boundary.  +
RAPID/Hydropower/California/Transmission +Any proposed hydropower project for the construction of a transmission line of 200 kV or more.  +
RAPID/Hydropower/Colorado/Power Plant +Any public utility before constructing or operating a transmission line extension project, interconnected group net-metered hydroelectric power systems, and conduit projects less than five megawatts may need to obtain a CPCN. [[Colorado - C.R.S. 40-5-101 et seq., Utilities-New Construction – Extension]].  +
RAPID/Hydropower/Colorado/Transmission +Public utilities before construction and extension of transmission facilities in the state.  +
RAPID/Hydropower/Illinois/Transmission +A public utility (developer) constructing any new plant, equipment, property, or facility. [[Illinois Public Utilities Act (220 I.L.C.S §§ 5 et seq.)|220 I.L.C.S § 5/8-406]].  +
RAPID/Hydropower/Indiana/Transmission +If the developer is a "new electric transmission owner" it must receive authority from the [[Indiana Utility Regulatory Commission]] to operate as a public utility when constructing new transmission lines.  +
RAPID/Hydropower/Iowa/Transmission +A "person [must] not construct, erect, maintain, or operate a transmission line, wire or cable" without first obtaining a Franchise from the [[Iowa Utilities Board]].  +
RAPID/Hydropower/Minnesota/Transmission +A person constructing any high-voltage transmission line with a capacity of 200 kV or more and longer than 1,500 feet, or greater than 10 miles of its length is located in the State of Minnesota.  +
RAPID/Hydropower/Mississippi/Transmission +To “construct, acquire, extend, or operate equipment” manufacturing, generating, transmitting, or distributing electricity for public sale. [[Mississippi – Miss. Code Ann. §§ 77-3-14 et seq., Certificates of public convenience and necessity required for construction of electrical generating and transmitting facilities|Miss. Code Ann. § 77-3-14(1)]].  +
RAPID/Hydropower/Missouri/Transmission +An electrical corporation constructing an electric plant. [[Missouri – Mo. Rev. Stat. §§ 393.010 et seq., Gas, Electric, Water, Heating and Sewer Companies|Mo. Rev. Stat. § 393.170.1]].  +
RAPID/Hydropower/New York/Power Plant +Electric corporations before beginning construction of an electric plant.  +
RAPID/Hydropower/North Dakota/Transmission +Before constructing transmission lines with a capacity of 115 kV or greater and is longer than one mile. [[North Dakota – N.D. Century Code §§ 49-03 et seq., Electric Utility Franchise|N.D.C.C. § 49-03-01(2)]].  +
RAPID/Hydropower/Ohio/Transmission +Before construction of a "major utility facility," including electric transmission lines and associated facilities with a design capacity of 125 kV or more. [[Ohio – Ohio Rev. Code §§ 4906.01 et seq., Power Siting|Ohio Rev. Code. § 4906.01]].  +
RAPID/Hydropower/Tennessee/Transmission +A person, public utility, or corporation, operating, constructing, or extending a transmission line. [[Tennessee – Tenn. Code Ann. §65-4-201 et seq., Certificate of Public Convenience and Necessity|Tenn. Code Ann. §65-4-201(a)]].  +
RAPID/Hydropower/Vermont/Power Plant +A developer before beginning construction of transmission line extension projects, outside of FERC's jurisdiction, interconnected group net-metered hydroelectric power systems, and project's that sell retail electricity within Vermont may need to obtain a CPG.  +
RAPID/Hydropower/Vermont/Transmission +Before construction or operation of transmission line extension projects, or a group net-metered hydroelectric power system interconnections.  +
RAPID/Hydropower/Wisconsin/Transmission +Before constructing transmission lines with a capacity greater than 100 kV.  +