U
23

Property:CertThreshold

From Open Energy Information

Property Name CertThreshold
Property Type Text
Description Used by the RAPID toolkit state level permitting forms.

Pages using the property "CertThreshold"

Showing 23 pages using this property.

View (previous 25 | next 25) (20 | 50 | 100 | 250 | 500)

R
RAPID/Hydropower/Alaska/Power Plant +To construct a transmission line extension project outside the [[Federal Energy Regulatory Commission]] project boundary.  +
RAPID/Hydropower/Alaska/Transmission +To construct transmission line extension projects outside the [[Federal Energy Regulatory Commission]] project boundary.  +
RAPID/Hydropower/California/Transmission +Certificate of Public Convenience and Necessity: to construct of a transmission line of 200 kV or more. Permit to Construct: to construct a powerline between 50kV and 200kV.  +
RAPID/Hydropower/Colorado/Power Plant +To construct or operate a transmission line extension project, interconnected group net-metered hydroelectric power system, or a conduit project less than five (5) MW. [[Colorado - C.R.S. 40-5-101 et seq., Utilities-New Construction – Extension| CRS 40-5-102, Certificate of Public Convenience and Necessity]].  +
RAPID/Hydropower/Colorado/Transmission +To construct a transmission line extension project outside the original [[Federal Energy Regulatory Commission]] boundary. [[Code of Colorado Regulations 4 CCR 723-3, Rules Regulating Electric Utilities|4 CCR 723-3-3206, Construction or Extension of Transmission Facilities]].  +
RAPID/Hydropower/Illinois/Transmission +To construct any new plant, equipment, property, or facility.  +
RAPID/Hydropower/Indiana/Transmission +To construct transmission lines with a capacity of 100kV or more. [[Indiana – Indiana Code §§ 8-1-38 et seq., Transmission Reliability|Indiana Code § 8-1-38]].  +
RAPID/Hydropower/Iowa/Transmission +To construct transmission lines with a capacity of 69kV or more across public or private lands in the state. [[Iowa – Iowa Code §§ 478 et seq., Electric Transmission Lines]].  +
RAPID/Hydropower/Kentucky/Transmission +To construct transmission facilities and extend transmission lines with a capacity greater than 138 kV or longer than 5,280 feet.  +
RAPID/Hydropower/Louisiana/Transmission +To construct transmission facilities furnishing electricity within the state with a capacity of 100kV, longer than one mile in length, and with an estimated construction cost greater than $20 million. [[Louisiana – Louisiana Public Service Commission General Order (2013)|Louisiana Public Service Commission General Order (2013), No. R-26018, at 9-10]].  +
RAPID/Hydropower/Minnesota/Transmission +To construct a high-voltage transmission line with a capacity of 200 kV or more and longer than 1,500 feet, or high voltage transmission line with a capacity of 100 kV and longer than 10 miles. [[Minnesota – Minn. Stat. §§ 216B et seq., Public Utilities|Minn. Stat. §216B.2421(2)(2)-(3)]].  +
RAPID/Hydropower/Mississippi/Transmission +To “construct, acquire, extend, or operate equipment” manufacturing, generating, transmitting, or distributing electricity for public sale. [[Mississippi – Miss. Code Ann. §§ 77-3-14 et seq., Certificates of public convenience and necessity required for construction of electrical generating and transmitting facilities|Miss. Code Ann. § 77-3-14(1)]].  +
RAPID/Hydropower/Missouri/Transmission +To construct an "electric plant" including “. . . all real estate, fixtures and personal property operated, controlled, owned, used or to be used for or in connection with or to facilitate the generation, transmission, distribution, sale or furnishing of electricity.” [[Missouri – Mo. Rev. Stat. §§ 386.010 et seq., Public Service Commission|Mo. Rev. Stat. § 386.020(14)]]; [[Missouri – Mo. Rev. Stat. §§ 393.010 et seq., Gas, Electric, Water, Heating and Sewer Companies|Mo. Rev. Stat. § 393.170.1]].  +
RAPID/Hydropower/New York/Power Plant +To construct an electric plant.  +
RAPID/Hydropower/New York/Transmission +To construct a "major utility transmission facility" including electric transmission lines with a capacity of 125 kV or more and at least one mile long and/or a transmission line with a capacity of greater than 100 kV, but less than 125 kV and at least ten miles long, including associated equipment. [[New York – Public Service Law| N.Y. Pub. Serv. Law §120(2), Siting of Major Transmission Facilities]].  +
RAPID/Hydropower/North Dakota/Transmission +To construct transmission lines with a capacity of 115 kV or more and longer than one mile. [[North Dakota – N.D. Century Code §§ 49-03 et seq., Electric Utility Franchise|N.D.C.C. § 49-03-01(2)]].  +
RAPID/Hydropower/Ohio/Transmission +To construct a "major utility facility," including electric transmission lines and associated facilities with a design capacity of 125 kV or more. [[Ohio – Ohio Rev. Code §§ 4906 et seq., Power Siting|Ohio Rev. Code § 4906.01]].  +
RAPID/Hydropower/Pennsylvania/Transmission +To construct facilities or equipment for the production, generation, transmission, and distribution of electricity for public use. [[Pennsylvania – 66 PA. Const. Stat. §101 et seq., General Provisions (1978)|66 PA. Const. Stat §102 (1978)]].  +
RAPID/Hydropower/Tennessee/Transmission +To construct or operate a "line, plant, or system" for the public sale of electricity. [[Tennessee – Tenn. Code Ann. §65-4-201 et seq., Certificate of Public Convenience and Necessity|Tenn. Code Ann. §65-4-208(a)]].  +
RAPID/Hydropower/Vermont/Power Plant +To begin construction of a transmission line extension project, outside of FERC's jurisdiction, interconnected group net-metered hydroelectric power systems, and project's that sell retail electricity within Vermont.  +
RAPID/Hydropower/Vermont/Transmission +To construct or operate a generation or transmission facility at any capacity. [[Title 30 Chapter 5 |30 V.S.A. § 248 et seq.]]  +
RAPID/Hydropower/West Virginia/Transmission +To construct a high voltage transmission line with a capacity greater than 200 kV. [[West Virginia – W. VA. Code §24-2-11a et seq., Requirement for Certificate of Public Convenience and Necessity before Beginning Construction on High Voltage Transmission Line (1973)|W. VA. Code §24-2-11a(a) (1973)]].  +
RAPID/Hydropower/Wisconsin/Transmission +To construct a large generation facility with a capacity of 100 MW or more and/or high-voltage transmission lines with a capacity greater than 100 kV. [[Wisconsin – 196 Wis. Stat. §§ 196.01 et seq., Regulation of Public Utilities|196 Wis. Stat.§ 196.491]].  +