Alberta Utility Commission Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

From Open Energy Information


OpenEI Reference LibraryAdd to library

Permitting/Regulatory Guidance - Guide/Handbook: Alberta Utility Commission Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Abstract
Rule 007 outlines the Alberta Utilities Commission application requirements for power plants, substations, transmission lines, industrial system designations and hydro developments.

Author 
Alberta Utility Commission






Published 
Alberta Utilities Commission, 03/21/2018



DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for Alberta Utility Commission Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Citation

Alberta Utility Commission. 03/21/2018. Alberta Utility Commission Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments. Alberta Utilities Commission. Rule 007: Applications for Power Plants, Substation, Transmission Lines, Industrial System Designations and Hydro Developments. 1-61p. Guide/Handbook sent to (!)