Difference between revisions of "Wyo. Stat. § 1-26 - Eminent Domain"

From Open Energy Information

(Created page with "{{Reference |Name=Wyo. Stat. § 1-26 - Eminent Domain |Document_type=Legal |InfographicType= |ThesisDissertation= |LegalType=Legal Document |LegalDocType=Statute |GuidanceType...")
 
Line 37: Line 37:
 
|CourtName=
 
|CourtName=
 
|LegalYear=2014
 
|LegalYear=2014
|LegalCitation=Wyo. Stat. § 1-26  
+
|LegalCitation=Wyo. Stat. § 1-26
 
|WebPublicationPlace=
 
|WebPublicationPlace=
 
|WebPublisher=
 
|WebPublisher=
Line 59: Line 59:
 
|ReferenceGenre=Bulk Transmission, Utilities
 
|ReferenceGenre=Bulk Transmission, Utilities
 
|RAPID=Yes
 
|RAPID=Yes
|RAPIDlocation=
+
|RAPIDlocation=Wyoming
|RAPIDtopic=
+
|RAPIDtopic=Land Use, Siting, Land Access
 
|RAPIDsubtopic=
 
|RAPIDsubtopic=
 
}}
 
}}

Revision as of 11:45, 7 November 2014


OpenEI Reference LibraryAdd to library

Legal Document- Statute: Wyo. Stat. § 1-26 - Eminent Domain

Abstract
This chapter outlines Department of Transportation eminent domain procedure.






Published 
N/A

Year Signed or Took Effect 
2014

Legal Citation 
Wyo. Stat. § 1-26


DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for Wyo. Stat. § 1-26 - Eminent Domain
Citation

Wyo. Stat. § 1-26 - Eminent Domain (2014).




"Siting" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.