Search by property

From Open Energy Information

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "NEPA Resource Imposed Mitigation" with value "4.1.6.1 Mitigation Measures- To ensure there are no adverse impacts on the Steamboat Ditch and the culturally significant parts of the Sinter Quarry, the following mitigation measures are proposed: *Monitoring by an archaeologist during all ground disturbance activities. *Placing facilities along already existing roads and disturbed areas *Instructing work crews on Nevada and federal Antiquities Laws". Since there have been only a few results, also nearby values are displayed.

Showing below up to 4 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

    • DOE-EA-1116  + (4.1.6.1 Mitigation Measures- To ensure the
      4.1.6.1 Mitigation Measures- To ensure there are no adverse impacts on the Steamboat Ditch and the culturally significant parts of the Sinter Quarry, the following mitigation measures are proposed: *Monitoring by an archaeologist during all ground disturbance activities. *Placing facilities along already existing roads and disturbed areas *Instructing work crews on Nevada and federal Antiquities Laws
      ews on Nevada and federal Antiquities Laws)
    • DOE-EA-1116#NEPAImpact_with_Cultural_Resources  + (4.1.6.1 Mitigation Measures- To ensure the
      4.1.6.1 Mitigation Measures- To ensure there are no adverse impacts on the Steamboat Ditch and the culturally significant parts of the Sinter Quarry, the following mitigation measures are proposed: *Monitoring by an archaeologist during all ground disturbance activities. *Placing facilities along already existing roads and disturbed areas *Instructing work crews on Nevada and federal Antiquities Laws
      ews on Nevada and federal Antiquities Laws)
    • DOE-EA-1116  + (The following mitigation measures would be
      The following mitigation measures would be employed to reduce or avoid potential impacts to the Steamboat Buckwheat. *Stockpiling soils, storing equipment, and parking construction vehicles would be maintained in a designated staging area which already lack significant stands of vegetation. *Prior to construction activities, on-site Steamboat Buckwheat habitat would be fenced by a qualified biologist, and construction workers would be instructed to avoid the plants.