  • "Deep Rose, LLC (Deep Rose) of Ridgecrest,
    "Deep Rose, LLC (Deep Rose) of Ridgecrest, California has proposed the construction of a well pad, access road, water line, support facilities (i.e. truck turnout areas and water storage areas), and the drilling and testing of up to four geothermal exploratory wells in Inyo County. After the initial well, subsequent wells may or may not be drilled based on the subsurface geological investigations. "
    he subsurface geological investigations. "  +
  • (From Section 2.1 of ROD) The Proposed Act
    (From Section 2.1 of ROD) The Proposed Action includes a 235-mile transmission line with telecommunication and appurtenant facilities in White Pine, Nye, Lincoln, and Clark Counties, a substation near Robinson Summit in White Pine County, a loop-in of the existing Falcon-Gonder 345 kV transmission line at the new Robinson Summit Substation, expansion of the existing Falcon Substation in Eureka County, addition of new equipment inside the existing Harry Allen Substation in Clark County, and access roads to all facilities collectively referred to as the ON Line Project. The Proposed Action transmission line includes Segments 6C, 8, 9B, 9A, 9D, and 11.
    cludes Segments 6C, 8, 9B, 9A, 9D, and 11.  +
  • 2-meter temperature probe survey  +
  • <br> Davenport and AltaRock (Propone
    <br> Davenport and AltaRock (Proponents) propose to create an EGS Demonstration Project involving new technology, techniques, and advanced monitoring protocols for the purpose of testing the feasibility and viability of enhanced geothermal systems for renewable energy production. The Project would utilize an existing well pad and existing deep geothermal well on federal geothermal lease OR40497 held by Davenport Newberry Holdings LLC. Nearby there would be 20 microseismic monitoring stations. All of these sites are on nationalforest system lands. Eleven of the sites would be on federal geothermal leases administered by the BLM, and 9 would be on lands that are administered by USFS (Table 1). If approved, drilling and installation of the downhole microseismic monitoring stations for the Project would begin in early 2012.
    for the Project would begin in early 2012.  +
  • <br> GRI is proposing to design, con
    <br> GRI is proposing to design, construct, and operate geothermal well pads and wells, geothermal fluid pipelines, and their associated access roads. These facilities would be connected to the previously proposed geothermal power plant for the Patua Phase I project or to a new nominal 60MW net geothermal power generation facility, to be located on one of two privately owned sections of land within the Unit. The power plant could be located adjacent to the existing Patua Phase I power plant, or in Section 29, T20N R26E. The elements of the proposed action include: *Reclamation‐managed lands **Drill 3 new temperature gradient holes (TGHs) (no vegetation removal required) **Construct 14 new well pads and drill multiple wells (57 acres disturbance) **Construct approximately 10.5 miles of geothermal fluid pipeline and access roads (159 acres of temporary disturbance and 159 acres of permanent disturbance) **Construction of 1.51 miles of new transmission line if a power plant is built south of Alt 50 (18.3 acres disturbance, assuming a 100‐foot corridor) *BLM‐managed lands **Drill 1 new TGH (no vegetation removal required) **Construct five new well pads and drill multiple wells (22 acres disturbance) **Construct approximately 2.2 miles of geothermal fluid pipeline and new access road (40 acres of temporary disturbance and 40 acres of permanent disturbance) *Private land **Construct approximately 1.1 miles of new access road and geothermal fluid pipeline (33 acres of temporary disturbance and 33 acres of permanent disturbance) **Construct nominal 60 MW net geothermal power generation facility and generation substation (29 acres permanent disturbance) **Construction of 0.8 miles of new transmission line if a power plant is built south of Alt 50 (9.7 acres permanent disturbance, assuming a 100‐foot corridor plus 32 acres of temporary disturbance for staging)
    cres of temporary disturbance for staging)  +
  • <br> Ormat is proposing to conduct a
    <br> Ormat is proposing to conduct a geothermal exploration project in Churchill County, Nevada on public lands managed by the BLM (see Figure 1 and Figure 2). Specifically, the Tungsten Mountain Geothermal Exploration Project (Project) includes: *Constructing up to 27 exploration well drill pads; *Drilling and completing an exploration well to a depth of about 7,000 feet from each of the constructed drill pads; *Flow-testing each exploration well to obtain samples of geothermal fluids and to collect aquifer information from the geothermal reservoir; *Constructing, improving or maintaining access roads (both on lease and off lease); *Constructing and maintaining a 5-acre mineral material pit on lease; and *Drilling temporary water wells at one or more proposed drill sites.
    wells at one or more proposed drill sites.  +
  • <br> Ormat proposes to evaluate the
    <br> Ormat proposes to evaluate the geothermal resources that potentially exist within the Lease Area by constructing up to 20 well pads and drilling one of each of the three different types of geothermal exploration wells on each pad: temperature gradient wells, observation wells, and production wells. Therefore a total of 60 geothermal exploration wells may be drilled as part of the Proposed Action. Each well pad would be permitted to accommodate the maximum approximate size necessary for the construction and operation of a production well, the largest of the three types. The drilling of each well type may not necessarily occur on each well pad, only one well of each well type would be drilled on any single well pad, and not all well pads may be utilized or developed. While each pad site would be permitted to accommodate a production well, well pads would be constructed only to the extent necessary to accommodate the well type(s) situated on it. If Ormat initially drills a temperature gradient well or observation well on a well pad, that well pad would not be expanded to full permitted size unless a production well is later drilled on it. Under no circumstances would a well pad be expanded to a size greater than that needed for a production well. Specific details about the design and layout of well pads are provided in Section 2.1.2.1. In support of the geothermal exploration drilling activities, Ormat also proposes to construct new gravel access roads and utilize and repair existing roads for access to the Project Area. Gravel would be obtained from an existing mineral material site that Ormat would expand and from a new mineral material site that Ormat would construct (Figure 2). Additionally, Ormat proposes to drill up to two groundwater wells on one or two of the proposed well pads or at the proposed new gravel source area. Therefore, a total of 62 wells may be drilled, including 60 geothermal exploration wells and 2 groundwater wells. Ormat would install an above-ground water distribution pipeline, within the project boundary as described in this EA, between the groundwater wells and well pads actively being drilled. The pipeline would be located along the sides of proposed access roads and on well pads, and would not require additional surface disturbance. The water distribution pipeline system would require prior BLM approval of a Sundry Notice to authorize construction of the pipeline. Ormat would also construct or install the necessary ancillary facilities in support of drilling activities, including a temporary personnel “camp” for active drilling crews.
    ersonnel “camp” for active drilling crews.  +
  • <br> The proposed action is for BLM
    <br> The proposed action is for BLM to grant a 9-acre ROW in the western half of section 6, T. 18 S., R. 43 E., Willamette Meridian (33) to USG in accordance with the applicant‘s geothermal drilling application and Plan of Development (POD) dated March 31, 2011. The acreage under the ROW would allow for field adjustment of the surface disturbance associated with the 4.5 acres of access road and 4.5 acres of drill pad construction. USG would construct, maintain, and operate roads, well drilling pads, exploratory geothermal wellheads, and associated pumping, power and control equipment. The proposed roads are designed to be 18 feet wide and 1.9 miles long (10,050 feet) with an average slope of 7%. Approximately 3,200 feet of access road was upgraded during a previous phase of the project and is not considered as new road construction, but will be an integral part of this project.
    will be an integral part of this project.  +
  • <br>Ormat proposes to evaluate the g
    <br>Ormat proposes to evaluate the geothermal resources that potentially exist within the Drum Mountains and Whirlwind Valley lease areas (Figure 2) by constructing well pads at each proposed location, and drilling up to one temperature gradient well, one observation well, and one production well on each site. The primary objective for the geothermal exploration projects is to gain an understanding of the characteristics of geothermal resources within the two lease areas. *constructing up to 11 geothermal exploration well pads at the Drum Mountain lease area and as many as 16 geothermal exploration pads at the Whirlwind Valley lease area; *constructing access roads and with occasional vehicle turnout spaces; *constructing aggregate (gravel) source areas for gravel surfacing of well pads and roads; *drilling and completing geothermal exploration wells; *flow testing select observation and productions wells as applicable; *drilling non-potable water wells on the well pads or gravel source areas within the Drum Mountains and Whirlwind Valley lease areas; and, *constructing temporary personnel camps during drilling activities at either or both lease areas. The above list is representative of the major components of the proposed action and is not necessarily inclusive of all activities and operational procedures that would occur if the proposed action were implemented. Similarly, the above list includes several activities and/or components that may not necessarily be performed or constructed, depending on data collected during operations. The following subsections detail the specific construction and operational procedures that comprise the proposed action and are the subject of the analysis of this EA.
    re the subject of the analysis of this EA.  +
  • A Gravity geophysical survey, on foot, and on existing road using ATVs. No explosives to be used. Survey would take place on geothermal leases at Whiskey Flat, South of Hawthorne, Nevada.  +
  • Allow Ormat Nevada, Inc. (Ormat) to procee
    Allow Ormat Nevada, Inc. (Ormat) to proceed with the operation plan and drilling plan for the Jersey Valley Geothermal Exploration Project. This decision includes allowing Ormat to construct up to five well pads for the purpose of drilling three to five geothermal observation wells and three to five geothermal production wells. Ormat has selected five sites for exploration drilling. Observation drill pads would also be constructed at up to three of these same five sites. In addition a FLPMA Right-of-Way will be authorized through a ROW Grant.
    ay will be authorized through a ROW Grant.  +
  • Allow a geophysical (seismic) survey to de
    Allow a geophysical (seismic) survey to determine underground structure (faults, fractures, and stratigraphy) and geologically locate geothermal resources. Additional Public Information: Agua Caliente and Optim have applied to conduct a geophysical (seismic) survey on approximately 1100 acres of public land. This would involve the placement of receivers, or geophones, that are laid out in a grid on the surface of the Earth. The geophones are spikes about 6” long with receivers that will be connected via seismic lines that transmit the recorded data. The data is gathered as vibroseis trucks vibrate the ground at pre-determined surface locations to generate seismic signals. The seismic signals are composed of ground vibrations that the geophones record
    round vibrations that the geophones record  +
  • AltaRock Energy Inc. (AltaRock) and the No
    AltaRock Energy Inc. (AltaRock) and the Northern California Power Agency (NCPA) are proposing to undertake an Engineered Geothermal System (EGS) well stimulation project in the Geysers Geothermal Field (GGF). In essence, EGS is the process of the injection of water into wells to create an artificial reservoir and steam, which is harnessed to produce energy.
    eam, which is harnessed to produce energy.  +
  • AltaRock Energy, Inc. proposes to conduct a seismic survey in the Buena Vista Valley, located in the Dixie Valley Geothermal Area  +
  • Arizona Public Service Company (APS or App
    Arizona Public Service Company (APS or Applicant) is proposing the development of approximately 38 miles of transmission line to increase the reliability of the high-voltage transmission system in the northwestern Phoenix metropolitan area. The proposed APS Sun Valley to Morgan 500/230kV Transmission Line Project (Proposed Action or Project) would establish a 500 Kilovolt (kV) and 230kV connection, constructed mainly on single-pole structures between two substations (the Sun Valley Substation [formerly called TS-5] and the existing Morgan Substation [formerly called TS-9]). The approved Sun Valley Substation will be located in the northwest portion of the Town of Buckeye and the existing Morgan Substation is located in the City of Peoria. Generally the transmission line would head north-northeast out of the Sun Valley Substation to north of State Route (SR) 74 and then east to the Morgan Substation. The Project would require a new right-of-way (ROW) or easement on federal, state, and private lands. The construction ROW would be approximately 200 feet wide, but could be somewhat wider where terrain poses engineering or construction constraints. The permanent and operational ROW width is proposed to be 200 feet wide and would cross approximately seven miles of public lands, north and south of SR 74 in the northeastern part of the Project Area and approximately two miles of public lands in the southwestern portion of the Project Area near the Sun Valley Substation location.
    a near the Sun Valley Substation location.  +
  • BLM: The BLM is proposing to grant the Pro
    BLM: The BLM is proposing to grant the Proponent right-of-way across the federal lands they administer to accommodate the Proponent’s proposed Project for a lease term of 30 years with right to renew. The Proponent’s Proposed Action is to construct, operate, and maintain a single-circuit 345kV transmission line from the existing Sigurd Substation, located north of Richfield, in Sevier County, Utah, to the existing Red Butte Substation, located west of Central, in Washington County, Utah. Permanent facilities would include: -A single-circuit, alternating current 345kV overhead transmission line (including structures, shield wires, conductors, and insulators) between the Sigurd Substation and Red Butte Substation -Communication regeneration stations associated with the transmission line -Access roads to the 345kV transmission line structures where needed and where there is no existing access -New substation equipment at terminus points to interconnect the Project with the existing Sigurd and Red Butte substations The Proposed Action and Project description are presented in detail in Chapter 2, Sections 2.2 and 2.3, of the Final Environmental Impact Statement (EIS). USFS: The USFS is proposing to authorize the Proponent to cross the federal lands they administer to accommodate the Proponent’s proposed Project for a period of 30 years with right to renewal. -The Proponent’s Proposed Action is to construct, operate, and maintain a single-circuit 345kV transmission line from the existing Sigurd Substation, located north of Richfield, in Sevier County, Utah, to the existing Red Butte Substation, located west of Central, in Washington County, Utah. -A single-circuit, alternating current 345kV overhead transmission line (including structures, shield wires, conductors, and insulators) between the Sigurd Substation and Red Butte Substation  Communication regeneration stations associated with the transmission line -Access roads to the 345kV transmission line structures where needed and where there is no existing access -New substation equipment at terminus points to interconnect the Project with the existing Sigurd and Red Butte substations -The Proposed Action and Project description are presented in detail in Chapter 2, Sections 2.2 and 2.3, of the Final Environmental Impact Statement (EIS).
    inal Environmental Impact Statement (EIS).  +
  • BPA has decided to construct the Big Eddy-
    BPA has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. This project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The Big Eddy-Knight Transmission Project will respond to requests for transmission service in the region by increasing transmission capability of the electrical system. For the transmission line, BPA has decided to build East Alternative Option 3, which was identified in the final EIS as the preferred alternative for the transmission line route. For the first 14 miles, the line will use double-circuit towers (combining the new line and an existing line on one set of towers) mostly on existing right-of-way. The remaining 14 miles of the new line will be built with single-circuit towers in newly-established transmission line right-of-way. BPA has also decided to build the small (about 1 mile) realignment of the East Alternative on the Oregon side of the Columbia River, as described in the final EIS. For the proposed new Knight Substation, BPA has decided to build Knight Substation on Site 1, which is on private property about 0.5 mile west of Knight Road. For the fiber optic cable necessary for system communications, BPA has decided to build the Loop Back Option, which will string fiber optic cable on the new transmission towers from BPA's Big Eddy Substation to the new Knight Substation and back again. The project also includes new equipment at BPA's existing Big Eddy and Wautoma substations. BPA considered three transmission line alternatives, two Knight Substation sites, two fiber optic cable options, and the No Action Alternative.
    le options, and the No Action Alternative.  +
  • BPA is proposing to construct, operate, an
    BPA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA’s planned Central Ferry Substation in Garfield County to BPA’s Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA lines in the area. Two of the routing alternatives for the transmission line are about 38 miles long, and the other two are about 40 miles long.
    and the other two are about 40 miles long.  +
  • BPA will build a new 500-kilovolt transmis
    BPA will build a new 500-kilovolt transmission line that had been scheduled for construction six years ago and then put on hold. In 2002, BPA decided to construct a new 79-mile transmission line from McNary Substation to the John Day Substation along the Columbia River. BPA completed an Environmental Impact Statement (EIS) that analyzed the potential impacts of constructing, maintaining and operating the line. The line would have helped integrate power from many of the new generation projects considered in the area. However, other than some preliminary construction activities, the project was put on hold due to changing energy market conditions. BPA recently conducted a process, called Network Open Season (NOS), in which we received many new requests for use of transmission lines in this area. Building the McNary-John Day transmission line will address those requests. As part of this NOS process, BPA also conducted a financial analysis of the project.
    ucted a financial analysis of the project.  +
  • Basin Electric is proposing to construct,
    Basin Electric is proposing to construct, operate, and maintain a new electrical transmission line connecting the existing AVS, Charlie Creek, Williston, and Neset substations with five newly proposed delivery substations. The overall project area identified for this project encompasses parts of Mercer, Dunn, McKenzie, Williams, and Mountrail counties in North Dakota. This overall project includes the construction of 345-kV transmission line facilities from Basin Electric’s AVS generation facility in northwestern North Dakota to increase the capacity and reliability of the electricity transmission infrastructure of the region. The line would connect AVS with Basin Electric’s Charlie Creek and Neset substations, Western’s Williston Substation, and provide new substation facilities to connect the proposed line into the current transmission system and provide locations for load-serving connections. Several alternatives, including a no-action alternative and three different build alternatives are discussed in detail in Chapter 2 of the FEIS. This FEIS considers two additional alternatives, similar to the alignment of Alternative B discussed in the DEIS. The primary difference is a double-circuit 345-kV line (Alternative D) or two parallel lines (Alternative E) running 63 miles from the Red Substation near Killdeer to the new White Substation and on to the Blue Substation and the additional Killdeer South Switchyard would be required. The Killdeer South Switchyard would interconnect the Red Substation to the existing AVS to Charlie Creek 345-kV transmission line by 12 miles of parallel 345-kV single-circuit transmission line. A detailed description of the project alternatives is included in Chapter 2 of the FEIS.
    ives is included in Chapter 2 of the FEIS.  +
  • Bonneville Power Administration (BPA) has
    Bonneville Power Administration (BPA) has been asked by the Bureau of Reclamation (Reclamation) to design and construct six new 500-kV transmission lines at Grand Coulee Dam. These proposed new overhead lines would replace six existing underground lines. The existing lines consist of eighteen aging, oil-filled cables between Grand Coulee's third powerhouse and the 500-kV spreading yard, both of which are operated and maintained by Reclamation. In the current underground configuration, the cables are more susceptible to threats like fire, which could likely lead to multiple line failures in the future. The proposed overhead solution is less likely to experience multiple line failures, which helps ensure safe and reliable transmission of power from Grand Coulee Dam. The new lines would transfer power that is generated at the third powerhouse, across the Columbia River near the visitor center area, and then proceed uphill where they will connect to existing lines that transfer power from this area into the Regional power grid.
    om this area into the Regional power grid.  +
  • Bonneville Power Administration (BPA) prop
    Bonneville Power Administration (BPA) proposes to rebuild the Kalispell-Kerr 115-kilovolt (kV) transmission line in Flathead and Lake counties, Montana. This 41-mile long transmission line is owned and operated by BPA. The line begins at the BPA Kalispell Substation and ends at the BPA Kerr Substation, approximately 4 miles southwest of the city of Polson (see project map below). The rebuild is needed because the transmission line, which was built in 1947, is old and the existing wood-pole structures and electrical wires (conductors) show normal deterioration due to age. Rebuilding this transmission line would enable BPA to continue to provide reliable electric power to local utilities. The project would include replacing wood-pole transmission structures, associated structural components, and conductors. The wood-pole transmission structures consist of either two or three wood poles. The existing structures would be replaced with structures of similar design within or near to their existing locations. Some existing access roads would need to be improved to provide construction access and some new access roads may be needed to access structures for which BPA currently does not have adequate access. The rebuilt transmission line would continue to operate at 115-kV.
    line would continue to operate at 115-kV.  +
  • Calpine Corporation has submitted a Plan o
    Calpine Corporation has submitted a Plan of Utilization (POU) to the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS) to develop a 49.9 megawatt (MW) geothermal power plant and wellfield and 24-mile, 230-kilovolt (kV) transmission line. This project, known as the Fourmile Hill Geothermal Development Project, would be located in the Glass Mountain Known Geothermal Resource Area (KGRA) on the Klamath and Modoc National Forests, in Siskiyou and Modoc Counties, California. The Glass Mountain KGRA represents one of the only remaining undeveloped KGRAs in North America with a demonstrated geothermal resource.
    a with a demonstrated geothermal resource.  +
  • Casa Diablo IV (CD-IV) Geothermal Developm
    Casa Diablo IV (CD-IV) Geothermal Development Project. ORNI 50 LLC, a wholly-owned subsidiary of Ormat Nevada Inc., (the Applicant) proposes to construct, operate, maintain and decommission a 33 megawatt (MW) geothermal power generating facility and related infrastructure near Mammoth Lakes in Mono County, California.
    Mammoth Lakes in Mono County, California.  +
  • Cayley Geothermal, Inc. (Cayley) is propos
    Cayley Geothermal, Inc. (Cayley) is proposing to conduct the Reese River Valley Geothermal Exploration Project (Project), a geothermal resources exploration program of temperature gradient hole (TGH) and slim well drilling and testing on public lands leased for geothermal resource development in Lander County, Nevada (Figure 1). The area to be explored (Project area) consists of portions of federal geothermal leases NVN-78687, NVN-77247, NVN-78688, and NVN-76676. The Project area (see Figure 2) covers the entirety of Sections 32 and 33, and the W½ of Section 34, and SW¼ of the SE¼ of Section 34, Township 24 North, Range 43 East (T24N, R43E), Mount Diablo Baseline and Meridian (MDB&M); and the W½ of the W½ of Section 3, the entirety of Sections 4 and 5, the E½ of Section 6, and the N½ of the N½ of Sections 8 and 9, T23N, R43E MDB&M. The Project (Proposed Action) includes (see Figure 3): *Drilling up to eight temperature gradient holes (including the improvement, reconstruction or construction of access roads, as necessary), each to a depth of either 300 or 1,000 feet and measuring the temperature profile in each TGH; and *Constructing drill pads on up to three of seven sites (including the improvement, reconstruction or construction of access roads, as necessary), drilling and completing a small-diameter (slim) well to a depth of about 4,000 to 5,000 feet from each of the three constructed drill pads, and flow-testing each completed slim well to obtain samples of the geothermal fluid and production information from the geothermal reservoir. The total estimated area of new surface disturbance required for construction of the drilling pads and access roads would be a maximum of approximately 9.68 acres (see Figure 3)
    of approximately 9.68 acres (see Figure 3)  +
  • Closely spaced gravity survey.  +
  • Conduct non-ground-disturbing gravity surv
    Conduct non-ground-disturbing gravity survey over a block that includes both on-lease and off-lease areas. See [http://www.fs.usda.gov/wps/portal/fsinternet/!ut/p/c5/04_SB8K8xLLM9MSSzPy8xBz9CP0os3gDfxMDT8MwRydLA1cj72BTUwMTAwgAykeaxRtBeY4WBv4eHmF-YT4GMHkidBvgAI6EdIeDXIvfdrAJuM3388jPTdUvyA2NMMgyUQQAyrgQmg!!/dl3/d3/L2dJQSEvUUt3QS9ZQnZ3LzZfS000MjZOMDcxT1RVODBJN0o2MTJQRDMwODQ!/?project=35765 US Department of Agriculture Forest Service website] for additional information and tiered documents. These documents are also included in the NEPA database. For related documents in the NEPA database, see: [[DOI-BLM-NV-030-06-025-EA]]<br> [[USDA-FS-EA-NV-030-06-025 2007]]<br> [[USDA-FS-EA-NV-030-06-025 2012]]
    t;br> [[USDA-FS-EA-NV-030-06-025 2012]]  +
  • Conduct water sampling, archaeological surveys, and shallow temperature surveys.  +
  • Construction and startup of the U.S. Geoth
    Construction and startup of the U.S. Geothermal Neal Hot Springs 22MW electric power facility in Vale, Oregon. US Geothermal would employ an innovative geothermal electricity production process which demonstrates an increase in power conversion efficiency up to 15 percent when compared to binary cycle systems currently available. The facility would use a non-toxic and non-flammable refrigerant in a closed-loop system with a gas scrubber to prevent the release of gas products to the atmosphere. These features would help to avoid air pollutants and anthropogenic emissions of greenhouse gases that would otherwise be produced to supply the energy through today's less efficient geothermal systems, The air cooled geothermal plant would have no direct emissions, and the indirect, and equivalent CO2 emissions from the Neal Hot Springs geothermal plant would be less than .04 pounds per kilowatt.
    ould be less than .04 pounds per kilowatt.  +
  • Construction of up to 15 well pads, on-lease access roads, surface pipelines and associated ancillary facilities for the purpose of drilling geothermal observation wells.  +
  • DOE’s proposed action is to issue a loan g
    DOE’s proposed action is to issue a loan guarantee to U.S Geothermal for construction and startup of the Neal Hot Springs Facility 22 MW geothermal electric power facility in Vale, Oregon. Vale is a rural area nearly 75 miles northwest of Boise, Idaho consisting largely of native range for livestock and dryland pasture. U.S Geothermal would employ an innovative geothermal electricity production process which demonstrates an increase in power conversion efficiency when compared to binary cycle systems currently available on the market. The proposed facility would use a non-toxic and non-flammable refrigerant in a closed-loop system with a gas scrubber to prevent the release of gas products to the atmosphere.
    release of gas products to the atmosphere.  +
  • Davenport Newberry Holdings LLC proposes the drilling, testing, and monitoring up to twelve temperature gradient / passive seismic geothermal exploratory wells on federal geothermal leases.  +
  • Development, Injection, Utilization and associated ancillary improvements, such as roads and electrical transmission line for the Telephone Flat Geothermal Project  +
  • Drill a temperature gradient hole (TGH) 76-9 to 1,000 feet for the testing of the temperature gradient for a period of one year.  +
  • Drill and test up to 4 wells, 15 - 35 MW new power plant facility and substation, construction and operation of production and injection wells, pipelines asses roads, etc, construct and operate a 120 kV gen-tie and switching station.  +
  • Drilling of 3 temperature gradient wells to a maximum depth of 1,000 feet. No pad construction. Tanks used to contain fluids and muds - no sumps proposed. Locations off of existing access. Site #1 may require cross-country access of 1,000 feet.  +
  • Drilling of up to 27 temperature gradient holes in the Gabbs Valley and Dead Horse Wells geothermal exploration project area.  +
  • ENEL has submitted a Geothermal Utilizatio
    ENEL has submitted a Geothermal Utilization Plan to BLM that proposes to: *Construct a 20 MW net (approximate) Organic Rankine, binary cycle power plant on private land. *Install a four-acre (approximate) electrical substation to connect to an existing 138-kV power transmission line. *Install 1600 feet of 138-kV power line from the power plant to the substation Utilize nine existing wells and up to twelve additional contingency wells for production and injection of geothermal fluids. *Construct a well field motor control center (MCC). *Construct up to 6.6 miles of 8 to 36-inch surface conveyance pipelines to connect individual well heads to the geothermal plant on private land. *Decommission five existing steam wells that supported the previous power plant as required and rehabilitate the well pads and use one existing steam well as a monitoring well <br> The proposed power plant would be an air cooled facility thus the 20 MW output is a yearly average output. Use of ten or more wells may be necessary at any given time for operation of the power plant (See Figure 2.1, Project Map). If ten wells are used, six would be operated as production wells and four as injection wells. To date, six production and three injection wells have been drilled in the project area.
    lls have been drilled in the project area.  +
  • Enel proposes a CSAMT (controlled source a
    Enel proposes a CSAMT (controlled source audio-frequency magnetotellurics) surface-based geophysical survey, which provides resistivity information on the subsurface. Six transects were proposed. Project map shows the transects within a leased area. No explosives were proposed for use. Cross-country travel proposed by ATV.
    use. Cross-country travel proposed by ATV.  +
  • Exergy, Inc (Exergy), proposes to construc
    Exergy, Inc (Exergy), proposes to construct and operate a 6-megawatt (MW), advanced binary, geothermal power plant. The development of this power plant includes geothermal production and injection wells, as well as ancillary facilities [such as on-site access road(s) and electric transmission lines interconnected to existing geothermal power plants]. The proposed site to be developed is approximately 16 kilometers (km) [(10 miles (mi)] southeast of Reno in Washoe County, Nevada. The proposed geothermal power plant and associated components, using the KCS 11 technology, are known as the Kalina Geothermal Demonstration Project (KGDP). The proposed KGDP would be located on a private leasehold known as the Harvey (formerly "Giusti") parcel within the jurisdiction of Washoe County. The Harvey parcel is approximately 24 hectares (ha) (60 acres) in Section 29 of Township 18 North, Range 20 East.
    on 29 of Township 18 North, Range 20 East.  +
  • Flow test of well 85-11 and simultaneous injection test of 68-1 and 24A-6  +
  • GRI is proposing to design, construct, and
    GRI is proposing to design, construct, and operate geothermal well pads and wells, geothermal fluid pipelines, and their associated access roads. These facilities would be connected to the previously proposed geothermal power plant for the Patua Phase I project or to a new nominal 60MW net geothermal power generation facility, to be located on one of two privately owned sections of land within the Unit. The power plant could be located adjacent to the existing Patua Phase I power plant, or in Section 29, T20N R26E. The elements of the proposed action include: •Reclamation‐managed lands – Drill 3 new temperature gradient holes (TGHs)(no vegetation removal required) – Construct 14 new well pads and drill multiple wells (57 acres disturbance) – Construct approximately 10.5 miles of geothermal fluid pipeline and access roads (159 acres of temporary disturbance and 159 acres of permanent disturbance) – Construction of 1.51 miles of new transmission line if a power plant is built south of Alt 50 (18.3 acres disturbance, assuming a 100‐foot corridor) •BLM‐managed lands – Drill 1 new TGH (no vegetation removal required) – Construct five new well pads and drill multiple wells (22 acres disturbance) – Construct approximately 2.2 miles of geothermal fluid pipeline and new access road (40 acres of temporary disturbance and 40 acres of permanent disturbance) •Private land – Construct approximately 1.1 miles of new access road and geothermal fluid pipeline (33 acres of temporary disturbance and 33 acres of permanent disturbance) – Construct nominal 60 MWnet geothermal power generation facility and generation substation (29 acres permanent disturbance) – Construction of 0.8 miles of new transmission line if a power plant is built south of Alt 50 (9.7 acres permanent disturbance, assuming a 100‐foot corridor plus 32 acres of temporary disturbance for staging) The project area is shown in Figure 1.1‐2. The total area of disturbance for the project would not exceed approximately 620 acres. Table 2.1‐1 and 2.1‐2 list the estimated total disturbance areas by component and land management/ownership. This amount of estimated disturbance in Table 2.1‐1 and 2.1‐2 is much greater than what will likely occur, as generous disturbance corridors for roads and pipelines have been assumed. A 300 foot wide corridor has been assumed for the pipeline and roadways across the entire project area. This corridor has been assumed in order to accommodate some expansion joints and turnouts, which could have a maximum width of 300 feet(assuming 150 feet would be temporary disturbance and 150 feet of permanent disturbance). In most locations, the width of permanent disturbance of pipeline and roads would only be an estimated 30 feet and temporary disturbance would be considerably less than 300 feet. Therefore, the total project disturbance will likely be significantly less than 620 acres. Upon completion of the analysis and decision, GRI would begin development of the proposed project components. Development would begin with wellfield development, including access roads, well pads, and wells. The second stage of development would include construction of the power plant and transmission line (if necessary), and associated piping. Once construction is finalized, utilization, and power generation would begin. This EA also addresses decommissioning of the project.
    addresses decommissioning of the project.  +
  • GRI is proposing to design, construct, and
    GRI is proposing to design, construct, and operate geothermal well pads and wells, geothermal fluid pipelines, and their associated access roads. These facilities would be connected to the previously proposed geothermal power plant for the Patua Phase I project or to a new nominal 60MW net geothermal power generation facility, to be located on one of two privately owned sections of land within the Unit. The power plant could be located adjacent to the existing Patua Phase I power plant, or in Section 29, T20N R26E. The elements of the proposed action include: ; Reclamation‐managed lands * Drill 3 new temperature gradient holes (TGHs) (no vegetation removalrequired) * Construct 14 new well pads and drill multiple wells (57 acres disturbance) * Construct approximately 10.5 miles of geothermal fluid pipeline and access roads (159 acres of temporary disturbance and 159 acres of permanent disturbance) * Construction of 1.51 miles of new transmission line if a power plant is built south of Alt 50 (18.3 acres disturbance, assuming a 100‐foot corridor) ; BLM‐managed lands * Drill 1 new TGH (no vegetation removal required) * Construct five new well pads and drill multiple wells (22 acres disturbance) * Construct approximately 2.2 miles of geothermal fluid pipeline and new access road (40 acres of temporary disturbance and 40 acres of permanent disturbance) ; Private land * Construct approximately 1.1 miles of new access road and geothermal fluid pipeline (33 acres of temporary disturbance and 33 acres of permanent disturbance) * Construct nominal 60 MW net geothermal power generation facility and generation substation (29 acres permanent disturbance) * Construction of 0.8 miles of new transmission line if a power plant is built south of Alt 50 (9.7 acres permanent disturbance, assuming a 100‐foot corridor plus 32 acres of temporary disturbance for staging) The project area is shown in Figure 1.1‐2 (see [https://www.blm.gov/epl-front-office/projects/nepa/17952/36757/38557/Patua_II_Full_EA_Final.pdf NEPA document]). The total area of disturbance for the project would not exceed approximately 620 acres. Table 2.1‐1 and 2.1‐2 (see [https://www.blm.gov/epl-front-office/projects/nepa/17952/36757/38557/Patua_II_Full_EA_Final.pdf NEPA document]) list the estimated total disturbance areas by component and land management/ownership. This amount of estimated disturbance in Table 2.1‐1 and 2.1‐2 (see [https://www.blm.gov/epl-front-office/projects/nepa/17952/36757/38557/Patua_II_Full_EA_Final.pdf NEPA document]) is much greater than what will likely occur, as generous disturbance corridors for roads and pipelines have been assumed. A 300 foot wide corridor has been assumed for the pipeline and roadways across the entire project area. This corridor has been assumed in order to accommodate some expansion joints and turnouts, which could have a maximum width of 300 feet (assuming 150 feet would be temporary disturbance and 150 feet of permanent disturbance). In most locations, the width of permanent disturbance of pipeline and roads would only be an estimated 30 feet and temporary disturbance would be considerably less than 300 feet. Therefore, the total project disturbance will likely be significantly less than 620 acres. Upon completion of the analysis and decision, GRI would begin development of the proposed project components. Development would begin with well field development, including access roads, well pads, and wells. The second stage of development would include construction of the power plant and transmission line (if necessary), and associated piping. Once construction is finalized, utilization, and power generation would begin. This EA also addresses decommissioning of the project.
    addresses decommissioning of the project.  +
  • Geochemical survey  +
  • Geophysical survey.  +
  • Geophysical surveys.  +
  • Geothermal Technical Partners, Inc. would conduct geophysical and field geologic exploration, drill thermal gradient holes and two exploratory slim-hole wells, and test the well to evaluate the potential geothermal resource at McGee Mountain, Nevada.  +
  • Grass Valley observation wells: 47-15 and 67-16  +
  • Gravity geophysical survey.  +
  • Idaho Geological Survey proposes to drill
    Idaho Geological Survey proposes to drill three or more temporary temperature-gradient bore holes between 500 and 1000 feet in both Bingham and Caribou counties, Idaho. No road or drill pad construction is proposed. Bore holes would be plugged and abandoned according to Idaho State drilling regulations and the drilling sites restored as much as possible to their original condition. Drilling is proposed for the summer of 2012.
    illing is proposed for the summer of 2012.  +