Search by property

From Open Energy Information

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of values that have the property "CompletionNotes" assigned.

Showing below up to 100 results starting with #1.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 08/28/2-13: NOPI for 2-meter survery, used for diligent exploration expendures KERMIT: What do these notes mean?  +
  • 5/12/2014 - Assigned this CX to the North
    5/12/2014 - Assigned this CX to the North Brawley Geothermal Area (could also be the Salton Sea Geothermal Area, both fields lie within Imperial Valley. We will need to check the individual well field information for both areas to find this particular well). MB 8/26/2013 - Need lease number, geothermal area (Imperial valley, aded to drop down list?) and GDP application date KW 8/26/2013 - When RMP field is added, add "California Desert Conservation Area (CDCA) 1980 and San Diego County Resource Management Plan (2009)"
    go County Resource Management Plan (2009)"  +
  • 5/12/2014 Removed NOI tag from SRP document, this is not an NOI.<br>Data entry completed on 7/17 (reviewed on 8/7).  +
  • 5/13/2013 Changed Geothermal Area to McGui
    5/13/2013 Changed Geothermal Area to McGuiness Hills, Jersey Valley already exists on OpenEI, Tuscarora still needs to be added (facility might be associated with the Hot Sulphur Springs Geothermal Area). Need to add capability to assign more than one geothermal area to a single NEPA activity before the other areas can be assigned to this page. MB Entry complete 8/8 3 Geothermal Areas: Jersey Valley, McGuiness Hills, and Tuscarora. These all needed to be added to OpenEI. KERMIT: Need to add Public Health and Safety as a resource
    add Public Health and Safety as a resource  +
  • 5/13/2014 Consolidated duplicate page: Cor
    5/13/2014 Consolidated duplicate page: Corrected broken link to tiered doc; added POO, POU; added Revised Application Date (estimated); Added Final EA/EIS Date/Public Comment Period (same as estimated Revised Application Date); consolidated NEPA schedule comments to reflect estimates reported; added Exploratory Well to techniques; added Panorama Environmental, Inc as consultant; deleted duplicate page for DOI-BLM-NV-C010-2011-0016-EA. MB<br> Data entry complete on 8/29.<br> This document is a duplicate of DOI-BLM-NV-C010-2010-0016-EA and should be consolidated.
    0-2010-0016-EA and should be consolidated.  +
  • 5/14/2014 Moved page to DNA-NV-030-09-03. MB Should we move this page to the DNA number of DNA-NV-030-09-03?  +
  • 5/15/2014 Pulled dates from NOIs and final CX. Check for need to reconcile replacement of TGH 1-33 (NVN-087402) with TGH 1-9 (NVN-087746). MB  +
  • 5/15/2014 Uploaded all documents, completed data entry. MB  +
  • 5/19/2014 Added documents.  +
  • 5/21/2014: Added application and and decision dates from SRP.  +
  • 5/21/2014: Added application date from NOI. MB No document available to further populate.  +
  • 5/21/2014: Application date added from SRP. MB Data entry complete 8/27/13. Serial register page could perhaps be deleted - not sure how it relates.  +
  • 5/21/2014: Application date added from SRP.MB Data entry complete - 8/9/2013.  +
  • 5/21/2014: Application date entered as Jan
    5/21/2014: Application date entered as January 2012 based on the date present on the plan map on page 5 of the DNA document. Exact date of 1/16/2012 is estimated based on the decision date. MB No document available to further populate. 9/3/2013 Up loaded "DNA Doc
    ther populate. 9/3/2013 Up loaded "DNA Doc  +
  • 5/21/2014: Changed pre-application meeting date to application date, as is reflected in the NOI attachment. MB  +
  • 5/21/2014: Decision date estimated - only know April 2011. Data entry complete 7/16. Reviewed for completeness 8/7  +
  • 5/21/2014: Entered application date based
    5/21/2014: Entered application date based on last page of DNA. Final page appears to be a letter of intent to conduct a flow/injection test of the wells discussed in the DNA. Entered as POO. MB No document available to further populate. 8/29/2013: Up loaded DNA
    rther populate. 8/29/2013: Up loaded DNA  +
  • 5/21/2014: Marked as NOI, added application date. MB  +
  • 5/21/2014: added Decision Date based on si
    5/21/2014: added Decision Date based on signature date on final page of the EA. For the convenience of future reviewers, the latest date I can find on the 1998 application attachments is 5/21/1998. Many of the application documents for the 1993 EA application appear to be dated Nov/Dec 1993. MB Data entry complete 8/15. KERMIT: Need to add Public Health and Safety as a Resource
    add Public Health and Safety as a Resource  +
  • 7/29/2014 Exact application dates and fina
    7/29/2014 Exact application dates and final EIS dates are approximated. Only the month and year of the application and final EIS dates are known. The date tool does not allow entry of dates before 2004, and so will not calculate timeframe based on dates given for 1992 and 1994. Timeframe should be approximately 730 days (two years). MB
    be approximately 730 days (two years). MB  +
  • 7/8/2014 Changed the geothermal area back
    7/8/2014 Changed the geothermal area back to Salt Wells. EA is for Salt Wells project thermal gradient holes. If adding multiple geothermal areas becomes possible in the future, add Carson Lake Basin as another geothermal area (they are fairly close together and were probably being explored around the same time). MB 5/19/2014 Updated geothermal area to cover Carson Lake Basin. MB Add geothermal area as Carson Lake Basin. Add application type as NOI. This is not an EA. This is a NOI and EA cover page.(8/7) 10/7: KERMIT - this is listed as Salt Wells. Is that the same as Carson Lake Basin? Or does this area needed to be changed?
    ? Or does this area needed to be changed?  +
  • 8/15 No EA doc. Only EA Determination Memo 8/27/13. This is not a geothermal project. Should be deleted.  +
  • 8/28/2013 - Project includes Desert Queen. Leach Hot Springs Geothermal Area submitted on separate NOI SRP: NVN-086286  +
  • 8/2: Addition of new information  +
  • 8/2: Available data entered. 8/27/2013: This is a leasing EA. Leasing EAs are not to be included in the NEPA database. Please delete. - Andrew Gentile.  +
  • 8/2: Data entry completed 11/3/2013: Added date for POU/ROW Application  +
  • 8/2: Data reviewed for completion  +
  • 8/7/2013 - Add Drum Mountains, Whirlwind Valley to geothermal areas KW Data entry complete 8/14  +
  • 8/9 Data entry complete. Attached FONSI do
    8/9 Data entry complete. Attached FONSI does not seem to be fully related to the attached EA. The FONSI is for a geothermal well and slimhole exploration project and the EA is for a pipeline project. Need to add Public Health and Safety as a resource 8/22/13 - The 'FONSI/DR is actually for EA CA-170-02-15 Bassalt Canyon..dated Jan 2002 KW 8/26/13 - I deleted the FONSI from this page. Filename is incorrect for the file and stands as "CA-017-05-51-EA-DR -FONSI.pdf," Andrew Gentile. Unable to find Final EA or FONSI online. When RMP added, add "Inyo National Forest “Land and Resource Management Plan” (LRMP) 1988"
    and Resource Management Plan” (LRMP) 1988"  +
  • 9/10/2013-Project on hold, CX not completed.  +
  • 9/6/2013- Vulcan Energy assigned leases to Gradient Resources  +
  • 9/6/2013-Vulcan leases assigned to Gradient resources  +
  • 9/6/2013: KATE: Add Black Rock Field Office to "Managing Field Office" drop down.  +
  • <br> 5/16/2014 Added Aurora Geothermal Area to geothermal areas database. MB *Tiered Doc: Need USFS EA to link to; *Application Type: NOI *Geothermal Area: Aurora (needs to be added)  +
  • A complete record of Project files can be found on the BLM website at: http://www.blm.gov/az/st/en/prog/energy/aps-sunvalley.html  +
  • A complete record of all documents completed for Project is located at: http://www.blm.gov/nm/st/en/prog/more/lands_realty/sunzia_southwest_transmission.html  +
  • A complete record of project documents can be found on the BPA website at: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/  +
  • A complete record of project files can be found on the USFS website at: http://www.fs.usda.gov/detail/htnf/news-events/?cid=STELPRD3825485  +
  • A complete record of project files can be found on the Project website at: http://efw.bpa.gov/environmental_services/Document_Library/Central_Ferry-Lower_Monumental/  +
  • A complete record of project files can be found on the Project website at: http://www.boardmantohemingway.com/default.aspx NEPA Resource Analysis chart updated May 2016.  +
  • A complete record of project files can be found on the RUS website: http://www.rd.usda.gov/publications/environmental-studies/impact-statements/avs-neset-345kv-transmission-line-project-north  +
  • A complete record of project related files can be found on the Project website at: http://corridoreis.anl.gov/index.cfm  +
  • A complete record of the project files can be found on the Project website at: http://efw.bpa.gov/environmental_services/Document_Library/Mcnary-John_Day/  +
  • A complete record of the project files can be found on the Project website at: http://efw.bpa.gov/environmental_services/Document_Library/Big_Eddy-Knight/  +
  • Added to Database 11/26/2013  +
  • Argonne has EA file - maybe in GDR? 8/9: Data entry complete. No COA with document.  +
  • Argonne has EA file - maybe in GDR? Add Jersey Valley Geothermal Area No document available from which to extract more info.  +
  • Argonne has EA file - maybe in GDR? This is not a NEPA document. Recommend deleting. (Andrew Gentile).  +
  • Argonne has EA file - maybe in NGDS? 8/26
    Argonne has EA file - maybe in NGDS? 8/26/2013 - Not sure what above note refers to. This is an EIS, not an EA. The Final EIS is already here and uploaded. Mitigation measures not fully populated. OpenEI wouldn't take any Wildlife mitigation past 4.3.8.j. Same with Visual mitigation from 4.9.5a onward. Human Health and Safety mitigation measures need to be added once that category is added.
    d to be added once that category is added.  +
  • Argonne has EA file - maybe in NGDS? 8/9:
    Argonne has EA file - maybe in NGDS? 8/9: Data entry complete. KERMIT: Cayley Geothermal, Inc is the applicant. Have they changed to Sierrra Geothermal Power? Yes effective 4/11/07 Application date in Serial Register is after the decision date, so this may be the wrong serial register. SRP is for a NOI for a TG Well Tiered from EA, 10/31/13: Earlies NOI for TGW is 5/8/2006 SRP NVN-0832316, GDPs' 6/16/2006 When I saved edits the EA file disipeared form the page?
    dits the EA file disipeared form the page?  +
  • Argonne has EA file - maybe in NGDS? Data entry based on draft EA complete 8/16  +
  • BLM Project Website: http://www.blm.gov/or/districts/burns/plans/steen_trans/ Applicant Website: http://columbiaenergypartners.com/about/press/north-steens-transmission-line-eis-key-facts/  +
  • BLM Project website: http://www.blm.gov/ca/st/en/fo/needles/Eldorado_Ivanpah_Trans.html CPUC Project website: http://www.cpuc.ca.gov/Environment/info/ene/ivanpah/Ivanpah.html  +
  • BLM Website: http://www.blm.gov/ut/st/en/fo/salt_lake/planning/mona_to_oquirrh_transmission.html Pacificorp Website: http://www.pacificorp.com/tran/tp/eg/gc/scmto.html  +
  • BLM Wyoming has issued a ROD for Project S
    BLM Wyoming has issued a ROD for Project Segments 1-7 and 10. A Supplemental EIS is being prepared for segments 8 and 9 by BLM Idaho. SEIS released March 2016. View it here: https://eplanning.blm.gov/epl-front-office/eplanning/planAndProjectSite.do?methodName=dispatchToPatternPage&currentPageId=53810 More information about this process is available at: http://www.blm.gov/id/st/en/prog/nepa_register/gateway-west/Documents.html Public comment for the Final EIS is open until June 9th, 2016. NEPA document library for project: http://www.wy.blm.gov/nepa/cfodocs/gateway_west/documents.html
    v/nepa/cfodocs/gateway_west/documents.html  +
  • BLM project website: http://www.blm.gov/ca/st/en/fo/palmsprings/devers_paloverde.html CPUC project website: http://www.cpuc.ca.gov/Environment/info/aspen/dpv2/dpv2.htm NEPA Resource Analysis Updated: May 2016.  +
  • CPUC Project Website: ftp://ftp.cpuc.ca.gov/gopher-data/environ/tehachapi_renewables/TRTP.htm  +
  • Complete 8/5.  +
  • DELETE THIS PAGE. It is duplicated. KERMIT: With which one? DOI-BLM-NV-C010-2010-0006-EA? Why are data different? Dates different, this was a NOI for TGHs, tiered off the EA referenced.  +
  • Data entry 8/7/2013.  +
  • Data entry complete 5/15/2014 MB  +
  • Data entry complete 8/12  +
  • Data entry complete 8/12; KERMIT: Need to add Public Health and Safety as a resource  +
  • Data entry complete 8/13. Duplicate page. Should be consolidated with the other entry for this document. KERMIT: Which is this duplicate with?  +
  • Data entry complete 8/13; KERMIT: Need to add Public Health and Safety as a resource  +
  • Data entry complete 8/14  +
  • Data entry complete 8/14; KERMIT  +
  • Data entry complete 8/15; Need to add Public Health and Safety as a resource 9/18/2013 Geothermal Area is Jersey Valley, add to area list  +
  • Data entry complete 8/9  +
  • Data entry complete based on info in EA.  +
  • Data entry complete by AG 7/18.  +
  • Data entry complete.  +
  • Data entry complete. 7/22: Added decision and conditions docs  +
  • Data entry complete. Only the Draft EA seems to be available. No Final EA has been found.  +
  • Data entry complete. This EA does not distinguish mitigation from applicant-proposed measures. I used my judgment to parse them out as seemed to make sense. 8/15 added NEPA doc name  +
  • Data entry completed May 2016. Still need
    Data entry completed May 2016. Still need to upload the FEIS that was published in November 2015. A complete record of the FEIS and DEIS files can be found on the BLM website at: http://www.blm.gov/nm/st/en/prog/more/lands_realty/southline_transmission.html
    e/lands_realty/southline_transmission.html  +
  • Data entry is complete.  +
  • Data population is as complete as can be. Draft EA and Final EA dates are guesses based on contractor files. No information available on decision date (FONSI).  +
  • Data reviewed for completion 8/7  +
  • Document library updated May 2016: http://www.blm.gov/wy/st/en/info/NEPA/documents/hdd/gateway_south/docs.html  +
  • Entered into Data base 11/26/2013  +
  • FONSI only, no EA. Data complete 8/7. 8/27/2013. Andrew Gentile emailed Casey Strickland asking for EA file to be checked on DOE's website since it won't download.  +
  • For copies of the ROW Grant Terms and Conditions, Special Stipulations, and Plan of Development, contact the Cedar City Field Office at: 176 East DL Sargent Drive, Cedar City, Utah 84721 or call 435-865-3000.  +
  • Found in LR2000; Document Number does not pull up the CX in a search  +
  • Found in LR2000; Document number defaults to EA DOI-BLM-NV-C010-2010-0010-EA  +
  • GDP from BLM's Grass Wells Database, LR2000 SRPs, or State Mineral Commissions Databases.  +
  • I can't make sense of these files and cannot figure out a timeline of events. Note, the Decision File seems to mistakenly read November 4, 2012, when it should be November 4, 2011, I assume - Andrew Gentile.  +
  • If add RMPs, add Brothers/LaPine RMP (BLM 1989), Three Rivers RMP (BLM 1992 Data entry complete 8/13  +
  • KERMIT: Argonne has EA file - maybe in NGDS?  +
  • LADWP Project Website: https://www.ladwp.com/ladwp/faces/ladwp/aboutus/a-power/a-p-projects/a-p-p-barrenridgerenewabletransmission  +
  • Need to use the form to complete the mandatory and other information  +
  • No document available for further population. 9/10/2013-project on hold. CX not completed  +
  • No document available for further population.  +
  • No document available from which to extract more info. GDP from BLM's Grass Wells Database, LR2000 SRPs, or State Mineral Commissions Databases.  +
  • No document available from which to extract further information.  +
  • No document available from which to extract more info.  +
  • No document available from which to extract further information. 9/10/13-duplicate delete  +
  • No document available to further populate. GDP from BLM's Grass Wells Database, LR2000 SRPs, or State Mineral Commissions Databases. 8/29/2013- uploaded DNA and corrected lease number, incorrect on DNA form should be NVN-090744  +
  • No document available to further populate. GDP from BLM's Grass Wells Database, LR2000 SRPs, or State Mineral Commissions Databases.  +
  • No document available to further populate. GDP from BLM's Grass Wells Database, LR2000 SRPs, or State Mineral Commissions Databases. 9/4/2013: DNA file uploaded  +