Permit Overview A typical utility-scale solar project will raise numerous environmental issues that require permitting and/or regulatory approval from federal and state agencies. The environmental law in the United States is governed by federal law that is administered by both federal and state agencies, as well as state environmental laws that either complement federal law or go above and beyond it. The [[National Environmental Policy Act]] (NEPA) was signed into law on January 1, 1970. The Act establishes national environmental policy and goals for the protection, maintenance, and enhancement of the environment and provides a process for implementing these goals within the federal agencies. A developer will be required to go through the NEPA process if the project involves a "major federal action." In general, NEPA will be triggered if the project is on federal land, the federal government owns the mineral estate, the project receives federal funding or support, or if a federal permit is required. The level and scope of the NEPA review will vary depending on the nature of the project and the level of involvement of the federal government. Some actions and projects will receive a categorical exclusion while others may require a full Environmental Impact Statement (EIS). NEPA review is handled by a "lead agency." A 'lead agency" is the federal agency responsible for writing the main NEPA document(s) and coordinating with any other federal, state, or tribal agencies. For most projects relating to utility-scale solar projects, the lead agency will be the [[Bureau of Land Management]] (BLM), the [[United States Forest Service]] (USFS), the [[Department of Energy]] (DOE), the [[United States Department of Agriculture]] (USDA), or the [[United States Department of Defense]] (DOD). On top of federal environmental regulation, the developer is required to comply with state environmental laws. Many states have adopted their own environmental laws and regulations. Overview of the permit or section being discussed.
Flowchart Narrative ==9.1 - Does the Project Include a Major Federal Action?== For [[NEPA]] to be triggered there must be a "major federal action" (action). Major federal actions tend to fall within one of the following categories: # Adoption of official policy, such as rules, regulations, and interpretations adopted pursuant to the Administrative Procedure Act, 5 U.S.C. 551 et seq.; treaties and international conventions or agreements; formal documents establishing an agency's policies which will result in or substantially alter agency programs. # Adoption of formal plans, such as official documents prepared or approved by federal agencies which guide or prescribe alternative uses of Federal resources, upon which future agency actions will be based. # Adoption of programs, such as a group of concerted actions to implement a specific policy or plan; systematic and connected agency decisions allocating agency resources to implement a specific statutory program or executive directive. # Approval of specific projects, such as construction or management activities located in a defined geographic area. Projects include actions approved by permit or other regulatory decision as well as federal and federally assisted activities. Major federal actions include new and continuing activities, including projects and programs entirely or partly financed, assisted, conducted, regulated, or approved by federal agencies; new or revised agency rules, regulations, plans, policies, or procedures; and legislative proposals (NEPA § [[Title 40 CFR 1506 Other Requirements of NEPA|1506.8]], [[Title 40 CFR 1508 Terminology and Index|1508.17]]). Actions do not include funding assistance solely in the form of general revenue sharing funds, distributed under the State and Local Fiscal Assistance Act of 1972, 31 U.S.C. 1221 et seq., with no federal agency control over the subsequent use of such funds. Actions do not include bringing judicial or administrative civil or criminal enforcement actions. In general NEPA will be triggered if the project is on federal land, the federal government owns the mineral estate, the project receives federal funding or support, or if a federal permit is required. See [[Title 40 CFR 1508 Terminology and Index|40 CFR 1508.18 Major Federal Action]]. ==9.2 to 9.3 – Is the BLM the Lead Agency for the Major Federal Action?== Under NEPA a “lead agency” is the agency preparing NEPA documentation or is the agency that has taken primary responsibility for coordinating the NEPA process. A “cooperating agency” means any federal, state, local, or tribal agency other than a lead agency which has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposal (or a reasonable alternative) for legislation or other major federal action significantly affecting the quality of the human environment. If the [[Bureau of Land Management]] (BLM) is the lead agency then the BLM will coordinate the NEPA process. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/9-FD-a|BLM NEPA Process: <br>9-FD-a]]</span> ==9.4 to 9.5 – Is the Department of Energy the Lead Agency for the Major Federal Action?== If the [[Department of Energy]] (DOE) is the lead agency then it will coordinate the NEPA process. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/9-FD-e|DOE NEPA Process: <br>9-FD-e]]</span> ==9.6 to 9.7 - Is the Department of Defense the Lead Agency for the Major Federal Action?== If the [[United States Department of Defense|Department of Defense]] (DOD) is the lead agency then it will coordinate the NEPA process. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/9-FD-f|DOD NEPA Process: <br>9-FD-f]]</span> ==9.8 to 9.9 - Is the USFS the Lead Agency for the Major Federal Action?== If the [[United States Forest Service]] (USFS) is the lead agency then it will coordinate the NEPA process. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/9-FD-g|USFS NEPA Process: <br>9-FD-g]]</span> ==9.10 to 9.11 - Is the USDA the Lead Agency for the Major Federal Action?== If the [[United States Department of Agriculture]] (USDA) is the lead agency for a utility-scale solar project, then the Rural Utilities Service (RUS) will coordinate the NEPA process. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/9-FD-h|Rural Utilities Service NEPA Process: <br>9-FD-h]]</span> ==9.12 – If Necessary, Contact Other Federal Agencies for NEPA Process== If another federal agency is the lead agency for the major federal action then the developer will be required to contact that agency for its NEPA policies and procedures. ==9.13 to 9.14 - Has an On-Site Evaluation Been Conducted?== The on-site evaluation process is intended to walk the developer through all of the required "environmental" considerations of a typical environmental review under NEPA. <span class="btn btn-rapid btn-overview">[[RAPID/Roadmap/10|On-Site Evaluation Process: 10]]</span> ==9.15 - State Environmental Process== Most states have passed state environmental laws and regulations. Some states have an all-encompassing environmental review process such as California's CEQA process, while other states consider only certain issues. The state of Alaska has not adopted a state environmental review process. <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-CA-a|State Environmental Review Overview: <br>9-CA-a]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-HI-a|State Environmental Review Process: <br>9-HI-a]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-ID-a|State Environmental Review Process: <br>9-ID-a]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-MT-a|State Environmental Review Process: <br>9-MT-a]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-NV-a|State Environmental Review: <br>9-NV-a]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-UT-a|Energy Pre-Design Meeting Process: <br>9-UT-a]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/9-WA-a|State Environmental Overview: <br>9-WA-a]]</span> Paragraphs supporting the elements in the flowchart. Delineate section headers with "==" wiki text.
Best Practices Describe any best practices known to accelerate or optimize this element.
Potential Roadblocks Describe any possible obstacles or issues persons exploring this element should be aware of.
Agencies Enter agency or multiple agencies, separated by semi-colons.
References Enter multiple References, separated by semi-colons. Use standard wiki text for links.
Regulations [[National Environmental Policy Act]];[[Title 40 CFR 1508 Terminology and Index|40 CFR 1508.18 - Major Federal Action]] Enter multiple Regulations, separated by semi-colons. Use standard wiki text for links.
Contact Please provide the contact position or title. Use the drop down selection to find the appropriate contact.Options are listed in the format of: Organization: Position More Help
Trigger: None. Assemble a trigger using the fields below. Multiple triggers are treated as "OR" conditionals. Surface ManagerSurface OwnerMineral ManagerMineral OwnerActivityEncroachmentEnvironmentalLocationLand Use PlanGeothermal LeaseHazardous WasteImpactsFacilityFundingManagedPlannedPower PlantTransmissionTransportation is FederalStateLocalTribalPrivate is in AlaskaArizonaCaliforniaColoradoHawaiiIdahoMontanaNevadaNew MexicoOregonTexasUtahWashingtonWyoming is Federal involves DrillingExplorationGeophysicsLeasingPower Plant DevelopmentWell Abandonment can be described as CogenerationSmall Power ProductionIndependent Power ProductionWholesale CustomerFERC ExemptedFERC LicensedUnderground StorageAbove-Ground StorageTemporary Water RequirementPermanent Water RequirementDrinking Water Providing is BLMBORDODDOEUSFS status is NewRevisedAmended ? ActiveNoApplicant Is Lessee Capacity Exceeds 20 MWCapacity Under 20 MWCapacity Is 50 MWCapacity Exceeds 50 MWCapacity Under 100 MWPUC Certification Historic PropertiesNative American Historic PropertyNative Hawaiian Historic PropertyNational Register Historic PropertyHistoric Property (Alteration)AirportMigratory BirdsBald Or Golden EagleMarine Mammals Or HabitatFederal Endangered SpeciesFarmland Or LivestockMilitary LandWaters Of The USNavigable WatersWild Or Scenic RiverWetlands By Dregging Or FillingGroundwater By DischargeStorm WaterWater Discharge To WellWater Discharge To LandWater Point Source DischargeWaste Water Associated With Only GeothermalReceived State 401 WQ CertHas Not Received 401 WQ CertAir QualityAir Quality From ConstructionAir Quality From OperationSolid Waste has been DiscoveredGeneratedStoredTreatedDisposed Line Capacity Under 200 kVLine Capacity Exceeds 50 kVWithin NIETCCAISO GridExempt Per GO 131 D III B 1Not Exempt From CEQAPUC CertificationProject Under GO 131 D II B 2 Assessment CompletedImpact SignificantImpact Likely SignificantAnalysis Impacts AdverseAnalysis Impacts Not AdverseNo Best Interests FindingNo Categorical ExclusionNo Determination Of NEPA AdequacyPrior State AnalysisNo Prior State AnalysisProcess Not Complete For DrillingExtraordinary Circumstances Interconnection AgreementPre-Application Process State Highway ROW Exceeds Max Length Or Load Add
Please note that all contributions to Open Energy Information are considered to be released under the Creative Commons Zero (see Creative Commons). When contributing, you must abide with Open Energy Information's core content policies of neutral point of view, verifiability, and no original research.
Edit history: This is a minor edit Watch this page Cancel | Editing help (opens in a new window)
Provide some quick feedback: