Name 7-FD-b Section number derived automatically from the wiki page. Move the page to change the section number.
Flowchart Select the flowchart which accompanies this section.
Technology Bulk Transmission Geothermal Hydropower Solar Please check the technology the roadmap section applies to (select all that apply)
Information current as of The year this permitting roadmap section was updated to current information.
Permit Overview Commercial operations from a Federal lease, a Federal unit, or a utilization facility must have a commercial use permit (CUP) approved by [[BLM]] before commencing operations ([[Title 43 CFR 3274 Applying for and Obtaining a Commercial Use Permit|43 CFR 3274.10]]). A permit may be obtained even if the applicant cannot demonstrate the ability to operate within standards. However, BLM may limit the applicant's activities for a set period of time until the applicant can demonstrate compliance ([[Title 43 CFR 3274 Applying for and Obtaining a Commercial Use Permit|43 CFR 3274.13]]). Overview of the permit or section being discussed.
Flowchart Narrative ==7-FD-b.1 - Sundry Notice Form to Commission Plant (Form 3260-003) and Required Documentation== To obtain a Commercial Use Permit, a number of documents are needed. '''Project Documentation Submittals for Commercial Use Permit (CUP)'''<br> Provide the following information, per [[Title 43 CFR 3274 Applying for and Obtaining a Commercial Use Permit|43 CFR 3274.11]]: # A signed [http://www.blm.gov/pgdata/etc/medialib/blm/noc/business/eforms.Par.31709.File.dat/3260-003.pdf sundry form] requesting approval of a commercial use permit. # The design specifications, and the inspection and calibration schedule of production, injection, and royalty meters. # A schematic diagram of the utilization site or individual well, showing the location of each production and royalty meter. If the sales point is located off the utilization site, give us a generalized schematic diagram of the electrical transmission or pipeline system, including meter locations. # A copy of the sales contract for the sale and/or utilization of geothermal resources; # A description and analysis of reservoir, production, and injection characteristics, including the flow rates, temperatures, and pressures of each production and injection well; # A schematic diagram of each production and injection well showing the wellhead configuration, including meters. # A schematic flow diagram of the utilization facility, including interconnections with other facilities, if applicable. # A description of the utilization process in sufficient detail to enable BLM to determine whether the resource will be utilized in a manner consistent with law and regulations; ==7-FD-b.2 to 7-FD-b.4 - Review Application Material== The CUP will be reviewed for technical adequacy, conformity with utilization plan and mitigation measures ([[Title 43 CFR 3261 Drilling Operations: Getting a Permit|43 CFR 3261.20]]). If BLM needs additional information, it will submit the request in writing and will suspend review until the additional information is submitted. If another Federal agency manages the surface, BLM will consult with the managing agency. BLM will notify the applicant whether the permit was approved, with or without conditions of approval, or denied. If the application is not complete it will be returned to the developer for revision. A complete application will be reviewed and the Commercial Use Permit prepared. ==7-FD-b.5 - Commercial Use Permit (CUP) Issued== The Commercial Use Permit is signed by the authorized office and mailed to the developer. ==7-FD-b.6 - Operate Plant== The facility operator's obligations per [[Title 43 CFR 3275 Conducting Utilization Operations|43 CFR 3275.11]] include: #Keep the facility in proper operating condition at all times #*Train personnel to perform emergency functions #*Operational practices allowing for proper emergency response and #*Properly maintain equipment #Sound Engineering Principles #Prevent waste of geothermal and other resources #Comply with operational orders, notices to lessees, lease terms, plans and permits, conditions of approval, verbal orders from BLM that will be confirmed in writing and any other BLM instructions. (See [[Title 43 CFR 3200 Geothermal Resource Leasing|43 CFR 3200.4]]) Environmental and safety requirements per [[Title 43 CFR 3275 Conducting Utilization Operations|43 CFR 3275.12]] include operating in a manner that protects the quality of surface and subsurface waters, air, and other natural resources. Wildlife, soil, vegetation and natural history are considered natural resources. Operators must also protect the quality of cultural, scenic and recreational resources. Other land uses should be accommodated and noise minimized. Operators must also affirmatively prevent unnecessary degradation of the land, damage to property and injury. Any equipment not in use should be stored. Continual monitoring should be conducted in order to identify and address local environmental resources. Upon BLM request, the operator should submit a contingency plan with procedures to protect health, safety, property and the environment. Reclamation of any distrubed surface to the standards prescribed by BLM is required when the land is no longer needed for facility construction or operation. For more operating, measuring, and monitoring requirements, see [[Title 43 CFR 3275 Conducting Utilization Operations|43 CFR 3275]]. Paragraphs supporting the elements in the flowchart. Delineate section headers with "==" wiki text.
Agencies Enter agency or multiple agencies, separated by semi-colons.
References [http://www.blm.gov/wo/st/en/prog/energy/geothermal/geothermal_nationwide.html BLM Geothermal Programmatic EIS]; [http://www.geocommunicator.gov/blmMap/Map.jsp?MAP=LAND BLM GeoCommunicator Interactive Map]; [http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&sid=76207b5da59138eeafc866f4df3f38fc&rgn=div8&view=text&node=43:2.1.1.3.53.36.58.4&idno=43 Sundry Notice Form]; [http://www.blm.gov/or/programs/minerals/files/geothermal_commercial_permit.pdf BLM Commercial Use Permit Checklist]; [http://www.blm.gov/wo/st/en/info/regulations/Instruction_Memos_and_Bulletins/national_instruction/2007/im_2007-021__.html Instruction Maual on Best Management Practices in the Application for Permit]; [http://www.blm.gov/pgdata/etc/medialib/blm/nv/minerals/geothermal.Par.82960.File.dat/BLM_MOU_WO_300-2006-08.pdf BLM MOU for Leasing and Permitting]; [http://www.blm.gov/pgdata/etc/medialib/blm/nv/minerals/geothermal.Par.6372.File.dat/MOU%20NDOM%20BLM%202006.pdf BLM-Nevada MOU for Coordination of OGG Permitting and Inspection]; [http://www.blm.gov/pgdata/etc/medialib/blm/ca/pdf/bakersfield/minerals.Par.9934.File.dat/CDOG_BLMMOU2008.pdf BLM-California Dept of Conservation MOU]; [http://www.blm.gov/pgdata/etc/medialib/blm/co/programs/energy/renewable_energy.Par.12472.File.dat/Goethermal_MOU_signed.pdf BLM-Colorado Dept of Natural Resources MOU] Enter multiple References, separated by semi-colons. Use standard wiki text for links.
Regulations [[Mineral Leasing Act of 1920]]; [[Title 43 CFR 3200 Geothermal Resource Leasing|43 CFR 3200.4]]; [[Title 43 CFR 3261 Drilling Operations: Getting a Permit|43 CFR 3261.20]]; [[Title 43 CFR 3274 Applying for and Obtaining a Commercial Use Permit|43 CFR 3274.10]]; [[Title 43 CFR 3274 Applying for and Obtaining a Commercial Use Permit|43 CFR 3274.11]]; [[Title 43 CFR 3274 Applying for and Obtaining a Commercial Use Permit|43 CFR 3274.13]]; [[Title 43 CFR 3275 Conducting Utilization Operations|43 CFR 3275.11]]; [[Title 43 CFR 3275 Conducting Utilization Operations|43 CFR 3275.12]] Enter multiple Regulations, separated by semi-colons. Use standard wiki text for links.
Contact Please provide the contact position or title. Use the drop down selection to find the appropriate contact.Options are listed in the format of: Organization: Position More Help
Trigger: None. Assemble a trigger using the fields below. Multiple triggers are treated as "OR" conditionals. Surface ManagerSurface OwnerMineral ManagerMineral OwnerActivityEncroachmentEnvironmentalLocationLand Use PlanGeothermal LeaseHazardous WasteImpactsFacilityFundingManagedPlannedPower PlantTransmissionTransportation is FederalStateLocalTribalPrivate is in AlaskaArizonaCaliforniaColoradoHawaiiIdahoMontanaNevadaNew MexicoOregonTexasUtahWashingtonWyoming is Federal involves DrillingExplorationGeophysicsLeasingPower Plant DevelopmentWell Abandonment can be described as CogenerationSmall Power ProductionIndependent Power ProductionWholesale CustomerFERC ExemptedFERC LicensedUnderground StorageAbove-Ground StorageTemporary Water RequirementPermanent Water RequirementDrinking Water Providing is BLMBORDODDOEUSFS status is NewRevisedAmended ? ActiveNoApplicant Is Lessee Capacity Exceeds 20 MWCapacity Under 20 MWCapacity Is 50 MWCapacity Exceeds 50 MWCapacity Under 100 MWPUC Certification Historic PropertiesNative American Historic PropertyNative Hawaiian Historic PropertyNational Register Historic PropertyHistoric Property (Alteration)AirportMigratory BirdsBald Or Golden EagleMarine Mammals Or HabitatFederal Endangered SpeciesFarmland Or LivestockMilitary LandWaters Of The USNavigable WatersWild Or Scenic RiverWetlands By Dregging Or FillingGroundwater By DischargeStorm WaterWater Discharge To WellWater Discharge To LandWater Point Source DischargeWaste Water Associated With Only GeothermalReceived State 401 WQ CertHas Not Received 401 WQ CertAir QualityAir Quality From ConstructionAir Quality From OperationSolid Waste has been DiscoveredGeneratedStoredTreatedDisposed Line Capacity Under 200 kVLine Capacity Exceeds 50 kVWithin NIETCCAISO GridExempt Per GO 131 D III B 1Not Exempt From CEQAPUC CertificationProject Under GO 131 D II B 2 Assessment CompletedImpact SignificantImpact Likely SignificantAnalysis Impacts AdverseAnalysis Impacts Not AdverseNo Best Interests FindingNo Categorical ExclusionNo Determination Of NEPA AdequacyPrior State AnalysisNo Prior State AnalysisProcess Not Complete For DrillingExtraordinary Circumstances Interconnection AgreementPre-Application Process State Highway ROW Exceeds Max Length Or Load Add
Please note that all contributions to Open Energy Information are considered to be released under the Creative Commons Zero (see Creative Commons). When contributing, you must abide with Open Energy Information's core content policies of neutral point of view, verifiability, and no original research.
Edit history: This is a minor edit Watch this page Cancel | Editing help (opens in a new window)