Idaho Construction Stormwater Permit (6-ID-b)

Idaho does not have authority from the United States Environmental Protection Agency to issue a construction stormwater permit. See Flowchart 6-FD-a for the EPA Construction General Permit.



Construction Stormwater Permit Process



6-ID-b.1 - EPA Construction General Permit

Idaho does not have authority from the United States Environmental Protection Agency to issue a construction stormwater permit. See Flowchart 6-FD-a for the EPA Construction General Permit.

Stormwater Construction General Permit :
6-FD-a