You do not have permission to edit this page, for the following reasons:
Name 3 (1) Section number derived automatically from the wiki page. Move the page to change the section number.
Flowchart Select the flowchart which accompanies this section.
Technology Bulk Transmission Geothermal Hydropower Solar Please check the technology the roadmap section applies to.
Select the hydropower project type conduit conventional non-powered dam pumped storage
Information current as of The year this permitting roadmap section was updated to current information.
Permit Overview A right-of-way, lease, or other legal right to use the land is required before development can begin on a solar utility project. It is therefore critically important to determine who owns the land to be developed and what type of authorization is required. Authorization may be required from federal, state or local government agencies, tribes, or private landowners. Private land owners will require a lease, while the [[Bureau of Land Management]] (BLM) and the [[United States Forest Service|U.S. Forest Service]] (USFS) will require a right-of-way authorization. States may require a lease, a right-of-way, or both. Land access is a key consideration not only for the solar generation facilities - but also for rights-of-ways necessary to connect the solar project to the grid (access roads, gen-tie lines, encroachment, etc). Thus, in many cases the ancillary land access considerations for solar projects are similar to the land access considerations for bulk transmission projects. Overview of the permit or section being discussed.
Flowchart Narrative ==3.1 to 3.2 - Is the Project on Private Land?== A developer siting a solar utility project on private land will either have to purchase the land or obtain a lease from the owner. The developer should conduct a due diligence review before signing the lease or purchasing the property. At a minimum, the due diligence review should include a title opinion, an environmental assessment, a survey, an on-site inspection and a zoning opinion. Other documents or assessments may be required as well. ==3.3 to 3.4 – Is the Project on State Land?== Each state has its own land leasing process. In some cases, the state may have regulations that relate specifically to solar development. A developer seeking to site a solar facility on state land should refer to that state’s regulations. <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/3-CA-a_(1)|State Land Lease: <br>3-CA-a]]</span> ==3.5 to 3.6 - Does the Project Require Access over State Land?== Each state has its own land rights of way process. A developer seeking access over or across state land for any reason should refer to that state's regulations. <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/3-CA-b|State Land Right-of-Way: <br>3-CA-b]]</span> ==3.7 to 3.8 — Will the Activity Encroach on a State or Local Highway Right-of-Way?== State and local governments require an encroachment permit for any object placed in, over, or under a local or state highway right-of-way (i.e. towers, poles, pipelines, fences, and other structures), as well as when a private access road or driveway joins a public road. <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/3-AK-c|State Highway Right-of-Way Permit: <br>3-AK-c]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/3-CA-c|State Highway Encroachment Permit: <br>3-CA-c]]</span> <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/3-NV-c|State Highway Encroachment Permit: <br>3-NV-c]]</span> ==3.9 to 3.10 – Is the Project on Tribal Land?== Under a Tribal Energy Resource Agreement (TERA) a tribe may enter into leases and business agreements for the purpose of energy resource development on tribal land for: *Exploration for, extraction of, or other development of the energy mineral resources of the Indian tribal located on tribal land including, but not limited to, marketing or distribution; *Construction or operation of an electric generation, transmission, or distribution facility located on tribal land; and *A facility to process or refine energy resources developed on tribal land. Under an approved TERA, a tribe may grant rights-of-way for the purpose of energy resource development on tribal land for construction or operation of a pipeline or electric transmission or distribution line serving: *An electric generation, transmission, or distribution facility located on tribal land, or *A facility located on tribal land that processing or refines energy resources developed on tribal land. For tribes that do not elect to pursue a TERA or for energy resources that are not included in an existing TERA, existing regulatory programs for energy resource development on Indian Lands are available as discussed in <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-b (1)|Tribal Land Leasing: <br>3-(FD)-b (1)]]</span>. In addition, the Tribal Energy and Environmental Information Clearinghouse has compiled various applicable [[Tribal Energy and Environmental Information | Laws and Regulations]] specifically for solar energy development on tribal lands. ==3.11 to 3.12 – Is the Project on Federal Land or Require Access across Federal Land?== Siting a solar utility project on federal land, or gaining access across federal land, requires permission from the managing agency. In most cases, the managing agency will be either the BLM or USFS. The [[Federal Land Policy and Management Act of 1976]] (FLPMA) authorizes both the BLM and the USFS to grant rights-of-way for the generation, transmission and distribution of electric energy. A right-of-way can be any legal instrument that authorizes a holder to use and/or occupy federal land under a grant. Both the BLM and the USFS have general regulations that govern the issuance of a right-of-way. BLM regulations governing rights-of-way can be found at [[Title 43 CFR 2800 Rights-of-way Under the Federal Land Policy Management Act|43 CFR 2800 et seq.]] and USFS regulations governing special use authorizations can be found at [[Title 36 CFR 251 Land Uses|36 CFR 251.50 – 251.65]]. In addition, both agencies have promulgated specific procedures that relate specifically to solar development. If the solar utility project is not on the federal land, then the developer may continue with the project. ==3.13 to 3.14 – Does the BLM Manage the Land?== The BLM has created a comprehensive Solar Energy Program that is designed to administer the development of utility-scale solar projects in six southwestern states: Arizona, California, Colorado, Nevada, New Mexico and Utah. The program was implemented by the Solar Programmatic Environmental Impact Statement (SPEIS), and the details of the program are contained in the SPEIS Record of Decision (ROD), effective October 10, 2012. The SPEIS contains a programmatic analysis of the environmental impacts of utility-scale solar development in six southwestern states, new procedures for issuing solar rights-of-way, and amendments to 89 land use management plans in the affected areas. These changes will alter the right-of-way permitting process for solar development on BLM lands within the six southwestern states. For BLM lands that are not within those states, the old BLM solar right-of-way policies will apply and land use management plans may still require amendment. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-c (1)|BLM Right-of-Way Application Process Overview: <br>3-(FD)-c (1)]]</span> In addition to a BLM right-of-way for the solar generation facilities and ancillary facilities, developers may require a transmission right-of-way across BLM land in order to connect the solar project to the energy grid. The application process is described in <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-c (2)|BLM Transmission Right-of-Way Application Process: <br>3-(FD)-c (2)]]</span>. ==3.15 to 3.16 – Does the USFS Manage the Land?== The USFS administers rights-of-way for utilities on Forest Service land via special use permits. In addition to the general permit requirements for a special use authorization, the USFS has issued a draft of a proposed amendment to Forest Service Handbook 2709.11. The proposed chapter 80 relates to solar development on USFS land. The permitting process outlined in the proposed amendment is similar to the process outlined by the BLM SPEIS, and would require significant documentation from the developer regarding the project. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-d |Forest Service Special Use Authorization: <br> 3-(FD)-d]]</span> In addition to special use permits for the solar generation facilities and ancillary facilities, developers may require a transmission right-of-way across Forest Service land in order to connect the solar project to the energy grid. The application process is described in <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-d (1) |USFS Transmission Right-of-Way Application Process: <br> 3-(FD)-d (1)]]</span> ==3.17 to 3.18 - Does the BOR Manage the Land?== If the solar project involves transmission facilities that will cross federal lands managed by the BOR (within the [[United States Department of Interior]]), the developer must receive a rights-of-way grant from the BOR under [[Title 43 USC 387 Removal of Sand, Gravel, etc.; Leases, Easements, etc.|43 U.S.C. 387]] and the BOR’s implementing regulations in [[Title 43 CFR 429 Use of Bureau of Reclamation Land, Facilities, and Waterbodies|43 CFR 429 et seq.]] <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-e|Bureau of Reclamation Use Authorization Process: <br>3-FD-e]]</span> ==3.19 to 3.20 – Does the NPS Manage the Land?== If the solar project involves transmission facilities that will cross federal lands within the National Park System, National Wild and Scenic Rivers System, National Trails System, National Heritage Areas, and other National Park Service (NPS) Affiliated Areas, the developer must receive a right-of-way permit from the NPS (within the [[United States Department of Interior]]) usually under [[Title 16 USC 5 Rights-of-way Through Parks or Reservations for Power and Communications Facilities|16 U.S.C. 5]] or [[Title 16 USC 79 Rights-of-way for Public Utilities|16 U.C.S. 79]] and the NPS’s implementing regulations in [[Title 36 CFR 14 Rights-of-way|36 CFR 14.1 et seq.]] The NPS may only issue right-of-way permits if the uses or activities are specifically authorized by Congress and only if there is no practicable alternative to the use of NPS lands. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-f|National Park Service Right-of-Way Application Process: <br>3-FD-f]]</span> ==3.21 to 3.22 – Does the DOD Manage the Land?== If a branch within the DOD manages the land, the developer may have two options, depending on the specific land in question. First, and in most cases, the developer can apply for a right-of-way from the appropriate military branch. General authority for rights-of-way for electric power and communication lines is provided by [[Title 43 USC 961 Rights-of-way Through Public Lands, Indian, and Other Reservations for Power and Communications Facilities|43 USC 961]]. In addition, some BLM-administered public land has been withdrawn from the public domain for exclusive military use. Any applications for a right-of-way or easement across BLM-administered land under exclusive military use require review and concurrence by the military branch. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-g|Department of Defense Right-of-Way Application Process: <br>3-FD-g]]</span> Second, there has been a recent increase in the issuance of “enhanced use leases” (EUL) on non-excess military land. In most cases the military will solicit requests for proposals when they have non-excess land suitable for energy development that can enhance the amount of energy produced from renewable sources. A typical EUL involves supplying the military base/installation/facility with a certain amount of energy, and developers may sell the remaining energy produced. Depending on the branch of the military, developers may be able to submit unsolicited proposals. The process is fully described in <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-o|Enhanced Use Leasing Process: <br>3-FD-o]]</span> ==3.23 to 3.24 - Does the FWS Manage the Land?== The [[Fish and Wildlife Service]] (FWS) manages National Wildlife Refuge System lands. If the solar project involves transmission facilities that will cross federal lands managed by the FWS, a right-of-way is required. The [[National Wildlife Refuge System Administration Act]] authorizes the FWS to grant rights-of-way for the construction of power transmission lines across System lands, as long as the use is compatible with the National Wildlife Refuge System mission and the purposes of the specific national wildlife refuge. FWS regulations governing the permitting of rights-of-way across System lands can be found at [[Title 50 CFR 29 Land Use Management | 50 CFR 29.21 and 29.22]]. Authority for rights-of-way across FWS managed lands that are not System lands (including National Fish Hatcheries, Research Areas, and Administrative Sites) can be found in [[Title 43 CFR 2800 Rights-of-way Under the Federal Land Policy Management Act | 43 CFR 2800]]. Rights-of-way across FWS managed non-System lands are also permitted under [[Title 50 CFR 29 Land Use Management | 50 CFR 29.21 and 29.22]]. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-m|United States Fish and Wildlife Service Right-of-Way Application Process: <br>3-FD-m]]</span> ==3.25 to 3.26 – Is the Project within the Right-of-Way of Federal Aid or Direct Federal Highway Projects?== [[Title 23 USC 109 Standards|23 U.S.C. 109(l)]] allows the Federal Highway Administration (FHWA) to permit utility companies to utilize federal aid highway rights-of-way or direct federal highway rights-of-way to site transmission lines. Before approving the right-of-way, the FHWA must (1) ascertain the effect the transmission line will have on safety; (2) determine the environmental and economic effects on agriculture resulting from a disapproval of the right-of-way, and; (3) consider environmental and economic impacts together with the impairment the transmission lines would have on the use of the highway. No use may be authorized that would adversely affect safety. For direct federal highway projects, approval must be obtained from the FHWA, and the FHWA applies accommodation policies similar to those required on federal aid highway projects. For federal aid highway projects, the applicable state department of transportation creates a utility accommodation plan. In both cases, the utility accommodation plans and policies must conform to the FHWA regulations found in [[Title 23 CFR 645 Utilities|23 CFR 645.201 et seq.]] <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/3-FD-n|Federal Highway Administration Utility Accommodation Process: <br>3-FD-n]]</span> ==3.27 – Contact Managing Agency== In extremely rare cases, the managing agency may not be the BLM, USFS, BOR, NPS, DOD, or FWS. In those cases, the developer should contact the managing agency to determine what type of authorization is required. Paragraphs supporting the elements in the flowchart. Delineate section headers with "==" wiki text.
Agencies Enter agency or multiple agencies, separated by semi-colons.
References [[TEEIC Laws and Regulations Applicable to Energy Transmission Development Website]]; Enter multiple References, separated by semi-colons. Use standard wiki text for links.
Regulations [[Federal Land Policy and Management Act of 1976]]; [[Title 43 CFR 2800 Rights-of-way Under the Federal Land Policy Management Act|43 CFR 2800 et seq.]]; [[Title 36 CFR 251 Land Uses|36 CFR 251.50 – 251.65]] Enter multiple Regulations, separated by semi-colons. Use standard wiki text for links.
Contact Please provide the contact position or title. Use the drop down selection to find the appropriate contact.Options are listed in the format of: Organization: Position More Help
Trigger: None. Assemble a trigger using the fields below. Multiple triggers are treated as "OR" conditionals. Surface ManagerSurface OwnerMineral ManagerMineral OwnerActivityEncroachmentEnvironmentalLocationLand Use PlanGeothermal LeaseHazardous WasteImpactsFacilityFundingManagedPlannedPower PlantTransmissionTransportation is FederalStateLocalTribalPrivate is in AlaskaArizonaCaliforniaColoradoHawaiiIdahoMontanaNevadaNew MexicoOregonTexasUtahWashingtonWyoming is Federal involves DrillingExplorationGeophysicsLeasingPower Plant DevelopmentWell Abandonment can be described as CogenerationSmall Power ProductionIndependent Power ProductionWholesale CustomerFERC ExemptedFERC LicensedUnderground StorageAbove-Ground StorageTemporary Water RequirementPermanent Water RequirementDrinking Water Providing is BLMBORDODDOEUSFS status is NewRevisedAmended ? ActiveNoApplicant Is Lessee Capacity Exceeds 20 MWCapacity Under 20 MWCapacity Is 50 MWCapacity Exceeds 50 MWCapacity Under 100 MWPUC Certification Historic PropertiesNative American Historic PropertyNative Hawaiian Historic PropertyNational Register Historic PropertyHistoric Property (Alteration)AirportMigratory BirdsBald Or Golden EagleMarine Mammals Or HabitatFederal Endangered SpeciesFarmland Or LivestockMilitary LandWaters Of The USNavigable WatersWild Or Scenic RiverWetlands By Dregging Or FillingGroundwater By DischargeStorm WaterWater Discharge To WellWater Discharge To LandWater Point Source DischargeWaste Water Associated With Only GeothermalReceived State 401 WQ CertHas Not Received 401 WQ CertAir QualityAir Quality From ConstructionAir Quality From OperationSolid Waste has been DiscoveredGeneratedStoredTreatedDisposed Line Capacity Under 200 kVLine Capacity Exceeds 50 kVWithin NIETCCAISO GridExempt Per GO 131 D III B 1Not Exempt From CEQAPUC CertificationProject Under GO 131 D II B 2 Assessment CompletedImpact SignificantImpact Likely SignificantAnalysis Impacts AdverseAnalysis Impacts Not AdverseNo Best Interests FindingNo Categorical ExclusionNo Determination Of NEPA AdequacyPrior State AnalysisNo Prior State AnalysisProcess Not Complete For DrillingExtraordinary Circumstances Interconnection AgreementPre-Application Process State Highway ROW Exceeds Max Length Or Load Add
Please note that all contributions to Open Energy Information are considered to be released under the Creative Commons Zero (see Creative Commons). When contributing, you must abide with Open Energy Information's core content policies of neutral point of view, verifiability, and no original research.
Edit history: This is a minor edit Watch this page Cancel | Editing help (opens in a new window)