Name 3-ID-a Section number derived automatically from the wiki page. Move the page to change the section number.
Flowchart Select the flowchart which accompanies this section.
Technology Bulk Transmission Geothermal Hydropower Solar Please check the technology the roadmap section applies to (select all that apply)
Information current as of The year this permitting roadmap section was updated to current information.
Permit Overview This flow chart assumes the developer is seeking to develop geothermal resources on state lands. Idaho has over 2.6 million acres of State Endowment Trust Land that is managed for maximum long-term financial return for the benefit of the public. Public schools are the primary beneficiary of the "endowment lands". The endowment leasing program manages: *Cottage site leasing; *Commercial leasing; *Grazing, farming and conservation leasing; and *Mineral leasing. The [[Idaho Department of Lands]] (IDL) is well-equipped to lease geothermal resources with a well established leasing process for endowment lands. Geothermal leases are available through over-the-counter filing of applications on a first come, first served basis. If two or more applications are received at the same time on the same day, it is considered a simultaneous filing which will be resolved by competitive auction. The price of annual rental is negotiated separately for each lease. And royalties are assessed by the board of land commissioners based on market value. The statutory authority for rents and royalties is found at [http://law.justia.com/codes/idaho/2011/title47/chapter16/47-1605/ Geothermal Resources 47-1605]. A $2,000 bond is required to hold each lease. This bond must be increased to $10,000 prior to drilling a geothermal well 1000 feet or deeper. Additional bonding is required under a drilling permit issued by the Idaho Department of Water Resources. Currently Idaho is in the process of drafting new administrative rules for issuing geothermal leases. Idaho currently hopes to have the new rules in effect by April 2013. Linked is a copy of the [http://adminrules.idaho.gov/Legislative_books/2013/pending/13H_RES&CON.pdf#page=142 Proposed Rule for IDAPA 20.03.15] Overview of the permit or section being discussed.
Flowchart Narrative ==3-ID-a.1 - Is the project on Endowment Lands== The IDL is responsible for ensuring a return on endowment lands. The endowment lands are lands held for the benefit of public schools. If the project is pursuing geothermal development on endowment lands there is a particular process. If the project is being developed on state lands owned or managed by a particular foundation or other state agency, the process is different. ==3-ID-a.2 - Notify Idaho Department of Lands (optional)== In the event the state lands are held by a foundation or other state agency, the IDL becomes involved only if they are notified and the Land Board requests their involvement. ==3-ID-a.3 - Consultation (optional)== IDL may meet with any other state agency to negotiate favorable terms for the state lands lease. ==3-ID-a.4 - State Lands Lease== The state lands lease may take any variety of forms depending on the outcome of the negotiations. ==3-ID-a.5 - Did the Land Board Approve== The [[Idaho State Board of Land Commissioners]] must approve the state lease. The board's authority is contained within [[Article IX, Section 8 of Idaho's Constitution | Article IX, Section 8 of Idaho's Constitution]]. ==3-ID-a.6 - Continue with project== Once the Land Board has approved the lease, the developer may proceed with the project. ==3-ID-a.7 - Public notice== If the developer seeks to site the project on endowment lands, a form of public notice must be made. This is to ensure that other developers have had ample opportunity to voice interest in the lands. The purpose is to ensure maximum financial return to endowment institutions. ==3-ID-a.8 - Is more than one party interested in the parcel== If more than one party voices interest in the parcel, the IDL must auction the parcel to the highest bidder. The purpose of the auction is to ensure a fair price for the benefit of the endowment institutions. ==3-ID-a.9 - Auction== The auctions are often [http://www.idl.idaho.gov/bureau/realestate/index_re.htm silent auctions] conducted orally. An interested bidder must submit the required earnest money deposit in the form of a bank-issued check, such as a cashier's check or certified check, in U. S. dollars, payable to the State of Idaho, Department of Lands at the time of auction in order to become a qualified bidder. The earnest money from the successful bidder will be considered earned and becomes non-refundable liquidated damages in the event of the purchaser’s default. Bidders must be 18 years of age and must be citizens of the United States or must have declared their intention to become U.S. citizens. A bidder will be required to sign an affidavit signifying that they have not exceeded the 320-acre lifetime limitation of state endowment land purchase of which no more than 160 acres can be University Endowment land. If the bidder is represented by another person, the representative must have a signed and notarized Verification of Bidder’s Representation form from the purchaser, along with U.S.-approved picture identification. Bidders must provide the Department with proof of financial ability to pay full purchase price at closing, five (5) working days prior to date of the auction. Acceptable proof of such financial ability shall be: (1) A letter from a financial institute clarifying bidders prequalification to place a bid at no less than appraised value or (2) A cash (or cash equivalent) deposit of the full appraise value, less the amount of bidders deposit with the Idaho Department of Lands. The successful bidder will be responsible for all cost of sale including appraisal, advertising, closing costs and title insurance premiums. The successful bidder will provide payment for appraisal and advertising costs at the close of the auction. Personal checks will be accepted for any amounts due over the original deposit to cover these incidental expenses. ==3-ID-a.10 - Is the lease term greater than 20 years== If the lease term is for greater than 20 years, the IDL must consult with the county commission(s) potentially affected by the lease. ==3-ID-a.11 - Consult regarding terms and conditions of potential lease== The commissions do not have the authority to stop a land lease, but their opinions are highly persuasive. The IDL may also consult the affected county commission for recommendations for terms and conditions of the lease that may satisfy local government concerns. ==3-ID-a.12 - Commercial Geothermal Lease== In Idaho, a geothermal lease is a standard form or template. The lease is essentially split into phases. Phase I is the exploration phase. It is scheduled to last 5 years. Phase II of the lease is the development phase, which is scheduled to last 5 years. Phase III is operation and administration. The IDL area office is responsible for administering the lease. The intent of the phases is to avoid speculation. Leases on endowment lands may not exceed 49 years. ==3-ID-a.13 - Did the Land Board approve== During an open meeting the Land Board considers the proposed lease and votes on whether or not to approve the lease. ==3-ID-a.14 - Administer lease== The IDL area office is responsible for administering the terms of the lease. ==3-ID-a.15 - Due Diligence Investigations== Once the lease is approved, the developer may initiate phase I of the lease and begin exploration activities. Part of exploration is not only determining the adequacy of the geothermal resource for development, but also to determine the appropriateness of the site selection. For instance, the developer must investigate environmental impacts and methods of mitigation. There is no formal investigatory and consultation requirement, but all environmental and cultural concerns should be considered and mitigated if possible. ==3-ID-a.16 - Work with state agency== The IDL has an advisory role in development on "state maintained" lands. ==3-ID-a.17 to 3-ID-a.18 - Notify & Consult with IDL (optional)== There are cases in which the lands sought for lease are state lands, but not managed by the IDL. The state agency managing the lands may seek IDL assistance, but notification and consultation are not required. Occasionally, before the Idaho State Board of Land Commissioners reviews the lease, it will request an opinion from IDL. ==3-ID-a.19 - State Lands Lease== The individual state agency is not required to utilize IDL's [https://openei.org/wiki/File:Geothermal_Lease_Template_-_Approved_06-19-12.pdf Geothermal Lease Template], but may choose to use its terms for simplicity of negotiation and board approval. ==3-ID-a.20 - Appraisal== In order for the Idaho State Board of Land Commissioners to properly evaluate a new land use or sale, there must be an appraisal before submitting the project to the board for consideration. ==3-ID-a.21 - Does the Land Board Approve== The Idaho State Board of Land Commissioners must approve new uses of state maintained lands. ==3-ID-a.22 - Continue with project== Paragraphs supporting the elements in the flowchart. Delineate section headers with "==" wiki text.
Agencies Enter agency or multiple agencies, separated by semi-colons.
References [https://openei.org/wiki/File:Geothermal_Lease_Template_-_Approved_06-19-12.pdf Geothermal Lease Template]; [http://www.idl.idaho.gov/bureau/minerals/min_leasing/leasing.htm Mineral Leasing Website];[http://www.lincolninst.edu/subcenters/managing-state-trust-lands/publications/trustlands-id.pdf Idaho Endowment Lands White Paper] Enter multiple References, separated by semi-colons. Use standard wiki text for links.
Regulations [https://openei.org/wiki/File:Original_Rule_from_OAR_20.03.15.pdf Original Administrative Rule]; [https://openei.org/wiki/File:08-03-12_FINAL_Negotiated_Draft_Rule_20.03.15.pdf Draft Rules]; [http://legislature.idaho.gov/idstat/Title58/T58CH3.htm Leasing of Public Lands 58-301 et seq];[http://law.justia.com/codes/idaho/2011/title47/chapter16/47-1605/ Geothermal Resources 47-1605];[[Article IX, Section 8 of Idaho's Constitution | Article IX, Section 8 of Idaho's Constitution]] Enter multiple Regulations, separated by semi-colons. Use standard wiki text for links.
Contact Please provide the contact position or title. Use the drop down selection to find the appropriate contact.Options are listed in the format of: Organization: Position More Help
Trigger: None. Assemble a trigger using the fields below. Multiple triggers are treated as "OR" conditionals. Surface ManagerSurface OwnerMineral ManagerMineral OwnerActivityEncroachmentEnvironmentalLocationLand Use PlanGeothermal LeaseHazardous WasteImpactsFacilityFundingManagedPlannedPower PlantTransmissionTransportation is FederalStateLocalTribalPrivate is in AlaskaArizonaCaliforniaColoradoHawaiiIdahoMontanaNevadaNew MexicoOregonTexasUtahWashingtonWyoming is Federal involves DrillingExplorationGeophysicsLeasingPower Plant DevelopmentWell Abandonment can be described as CogenerationSmall Power ProductionIndependent Power ProductionWholesale CustomerFERC ExemptedFERC LicensedUnderground StorageAbove-Ground StorageTemporary Water RequirementPermanent Water RequirementDrinking Water Providing is BLMBORDODDOEUSFS status is NewRevisedAmended ? ActiveNoApplicant Is Lessee Capacity Exceeds 20 MWCapacity Under 20 MWCapacity Is 50 MWCapacity Exceeds 50 MWCapacity Under 100 MWPUC Certification Historic PropertiesNative American Historic PropertyNative Hawaiian Historic PropertyNational Register Historic PropertyHistoric Property (Alteration)AirportMigratory BirdsBald Or Golden EagleMarine Mammals Or HabitatFederal Endangered SpeciesFarmland Or LivestockMilitary LandWaters Of The USNavigable WatersWild Or Scenic RiverWetlands By Dregging Or FillingGroundwater By DischargeStorm WaterWater Discharge To WellWater Discharge To LandWater Point Source DischargeWaste Water Associated With Only GeothermalReceived State 401 WQ CertHas Not Received 401 WQ CertAir QualityAir Quality From ConstructionAir Quality From OperationSolid Waste has been DiscoveredGeneratedStoredTreatedDisposed Line Capacity Under 200 kVLine Capacity Exceeds 50 kVWithin NIETCCAISO GridExempt Per GO 131 D III B 1Not Exempt From CEQAPUC CertificationProject Under GO 131 D II B 2 Assessment CompletedImpact SignificantImpact Likely SignificantAnalysis Impacts AdverseAnalysis Impacts Not AdverseNo Best Interests FindingNo Categorical ExclusionNo Determination Of NEPA AdequacyPrior State AnalysisNo Prior State AnalysisProcess Not Complete For DrillingExtraordinary Circumstances Interconnection AgreementPre-Application Process State Highway ROW Exceeds Max Length Or Load Add
Please note that all contributions to Open Energy Information are considered to be released under the Creative Commons Zero (see Creative Commons). When contributing, you must abide with Open Energy Information's core content policies of neutral point of view, verifiability, and no original research.