You do not have permission to edit this page, for the following reasons:
Name 17 (3) Section number derived automatically from the wiki page. Move the page to change the section number.
Flowchart Select the flowchart which accompanies this section.
Technology Bulk Transmission Geothermal Hydropower Solar Please check the technology the roadmap section applies to.
Select the hydropower project type conduit conventional non-powered dam pumped storage
Information current as of The year this permitting roadmap section was updated to current information.
Permit Overview Aesthetic or Visual Resources are often considered during the land use planning process to ensure the appropriate viewsheds are preserved for the public's recreational and other uses. Overview of the permit or section being discussed.
Flowchart Narrative ==17.1 to 17.2 Will the Project Be Located on or near a Wild and Scenic River?== In 1968 Congress passed PL 90-542, the [[Wild and Scenic Rivers Act | Wild and Scenic Rivers Act]], in order to protect rivers of particular scenic, recreational, geologic, fish and wildlife, historic, cultural or other similar values from impact on their free-flowing condition. Free-flowing condition refers to "existing or flowing in natural condition without impoundment, diversion, straightening, rip-rapping, or other modifications of the waterway." If the project is located on or near a Wild or Scenic river the developer may require a permit. <span class="btn btn-rapid btn-fed">[[RAPID/Roadmap/17-FD-a|Wild & Scenic Rivers Section 7(a): <br>17-FD-a]]</span> A wild, scenic or recreational river area eligible to be included in the system is a free-flowing stream and the related adjacent land area that possesses one or more of the values referred to in Section 1, subsection (b) of this Act. Every wild, scenic or recreational river in its free-flowing condition, or upon restoration to this condition, shall be considered eligible for inclusion in the national wild and scenic rivers system and, if included, shall be classified, designated, and administered as one of the following: :(1) Wild river areas -- Those rivers or sections of rivers that are free of impoundments and generally inaccessible except by trail, with watersheds or shorelines essentially primitive and waters unpolluted. These represent vestiges of primitive America. :(2) Scenic river areas -- Those rivers or sections of rivers that are free of impoundments, with shorelines or watersheds still largely primitive and shorelines largely undeveloped, but accessible in places by roads. :(3) Recreational river areas -- Those rivers or sections of rivers that are readily accessible by road or railroad, that may have some development along their shorelines, and that may have undergone some impoundment or diversion in the past. ([[Wild and Scenic Rivers Act | WSRA Sec. 2(b)]]). The Federal Energy Regulatory Commission cannot license the construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the [[Federal Power Act]] (FPA) (41 Stat. 1063), as amended (16 U.S.C. 791a et seq.), '''on or directly affecting''' any river which is designated in section 3 of this FPA as a component of the national wild and scenic rivers system or which is hereafter designated for inclusion in that system... Nothing...shall preclude licensing of, or assistance to, developments below or above a wild, scenic or recreational river area or on any stream tributary thereto which will not invade the area or unreasonably diminish the scenic, recreational, and fish and wildlife values present in the area on the date of designation of a river as a component of the National Wild and Scenic Rivers System. ([[Wild and Scenic Rivers Act | WSRA Sec. 7(a)]]). ==17.3 to 17.4 - Will There Be Any State Aesthetic Issues?== A state may require a permit if a project affects line of sight, creates excess noise, affects a protected aesthetic resource, etc. <span class="btn btn-rapid btn-state">[[RAPID/Roadmap/17-HI-a|Noise Permit: <br>17-HI-a]]</span> ==17.5 - Continue with Project== Paragraphs supporting the elements in the flowchart. Delineate section headers with "==" wiki text.
Agencies Enter agency or multiple agencies, separated by semi-colons.
References [[BLM - Instruction Memorandum No. 2009-167 | IM No. 2009-167 Application of the Visual Resource Management Program to Renewable Energy]]; [[BLM - Instruction Memorandum No. OC-2012-005 | IM No. 2012-055 Visual Resource Inventory Data Standard]] Enter multiple References, separated by semi-colons. Use standard wiki text for links.
Regulations [[Wild and Scenic Rivers Act | Wild and Scenic Rivers Act]]; [[Federal Power Act]] Enter multiple Regulations, separated by semi-colons. Use standard wiki text for links.
Contact Please provide the contact position or title. Use the drop down selection to find the appropriate contact.Options are listed in the format of: Organization: Position More Help
Trigger: None. Assemble a trigger using the fields below. Multiple triggers are treated as "OR" conditionals. Surface ManagerSurface OwnerMineral ManagerMineral OwnerActivityEncroachmentEnvironmentalLocationLand Use PlanGeothermal LeaseHazardous WasteImpactsFacilityFundingManagedPlannedPower PlantTransmissionTransportation is FederalStateLocalTribalPrivate is in AlaskaArizonaCaliforniaColoradoHawaiiIdahoMontanaNevadaNew MexicoOregonTexasUtahWashingtonWyoming is Federal involves DrillingExplorationGeophysicsLeasingPower Plant DevelopmentWell Abandonment can be described as CogenerationSmall Power ProductionIndependent Power ProductionWholesale CustomerFERC ExemptedFERC LicensedUnderground StorageAbove-Ground StorageTemporary Water RequirementPermanent Water RequirementDrinking Water Providing is BLMBORDODDOEUSFS status is NewRevisedAmended ? ActiveNoApplicant Is Lessee Capacity Exceeds 20 MWCapacity Under 20 MWCapacity Is 50 MWCapacity Exceeds 50 MWCapacity Under 100 MWPUC Certification Historic PropertiesNative American Historic PropertyNative Hawaiian Historic PropertyNational Register Historic PropertyHistoric Property (Alteration)AirportMigratory BirdsBald Or Golden EagleMarine Mammals Or HabitatFederal Endangered SpeciesFarmland Or LivestockMilitary LandWaters Of The USNavigable WatersWild Or Scenic RiverWetlands By Dregging Or FillingGroundwater By DischargeStorm WaterWater Discharge To WellWater Discharge To LandWater Point Source DischargeWaste Water Associated With Only GeothermalReceived State 401 WQ CertHas Not Received 401 WQ CertAir QualityAir Quality From ConstructionAir Quality From OperationSolid Waste has been DiscoveredGeneratedStoredTreatedDisposed Line Capacity Under 200 kVLine Capacity Exceeds 50 kVWithin NIETCCAISO GridExempt Per GO 131 D III B 1Not Exempt From CEQAPUC CertificationProject Under GO 131 D II B 2 Assessment CompletedImpact SignificantImpact Likely SignificantAnalysis Impacts AdverseAnalysis Impacts Not AdverseNo Best Interests FindingNo Categorical ExclusionNo Determination Of NEPA AdequacyPrior State AnalysisNo Prior State AnalysisProcess Not Complete For DrillingExtraordinary Circumstances Interconnection AgreementPre-Application Process State Highway ROW Exceeds Max Length Or Load Add
Please note that all contributions to Open Energy Information are considered to be released under the Creative Commons Zero (see Creative Commons). When contributing, you must abide with Open Energy Information's core content policies of neutral point of view, verifiability, and no original research.
Edit history: This is a minor edit Watch this page Cancel | Editing help (opens in a new window)